SU380825A1 - METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION - Google Patents

METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION

Info

Publication number
SU380825A1
SU380825A1 SU1606827A SU1606827A SU380825A1 SU 380825 A1 SU380825 A1 SU 380825A1 SU 1606827 A SU1606827 A SU 1606827A SU 1606827 A SU1606827 A SU 1606827A SU 380825 A1 SU380825 A1 SU 380825A1
Authority
SU
USSR - Soviet Union
Prior art keywords
installation
kojlohh
swimming
sections
section
Prior art date
Application number
SU1606827A
Other languages
Russian (ru)
Inventor
В. И. Меженный А. Г. Косорученко А. А. Алисейчик
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1606827A priority Critical patent/SU380825A1/en
Application granted granted Critical
Publication of SU380825A1 publication Critical patent/SU380825A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Description

1one

Изобретение отиоситс  к области судостроени  и может быть исиользовано в CTg ouтельстве плавучих буровых установок ири монтаже опорных колонн.The invention is in the field of shipbuilding and can be used in CTg in the field of floating drilling rigs and installation of supporting columns.

Известен способ монтажа опорных секций колонн плавучей буровой установки с иомощыо понтонов, подъемно-спускного устройства и платформы с днищем.There is a method of mounting the supporting sections of the columns of a floating drilling rig with pontoons and power lifting equipment and a platform with a bottom.

Краном соответствующей грузоподъемности секции сверху ввод тс  в корпус до зацеплени  с подъемно-спускным устройством и далее опускаютс  вниз. Кажда  следующа  секци  устанавливаетс  на торцовую поверхность ранее установленной секции и привариваетс  к ней. Монтаж колонн таким способом ведетс  длительное врем . При этом необходимо наличие плавкрана и соответствующа  глубина.A crane with the appropriate capacity of the section from above is inserted into the body before engaging with the lifting and lowering device and then lowering it down. Each subsequent section is installed on the end surface of the previously installed section and is welded to it. Installation of columns in this way is carried out for a long time. In this case, the presence of a floating crane and the corresponding depth are necessary.

Цель изобретени  - повыщеиие эффективности и качества монтажа.The purpose of the invention is to increase the efficiency and quality of installation.

Достигаетс  это тем, что опорные секции колонн устанавливают на понтоне в вертикальном положении и подают в подъемноспускное устройство в зоне монтажа, причем первую секцию подают сверху, а последующие- со стороны днища платформы, при этом стыковку торцовых поверхностей опорных секций колони обеснечивают иодъемпой силой понтонов.This is achieved by the fact that the supporting sections of the columns are mounted on the pontoon in a vertical position and fed to the lifting device in the mounting area, with the first section being fed from above and subsequent ones from the bottom of the platform, while joining the end surfaces of the supporting sections of the colony is cleaned with pontoon lifting force.

Изобретение по сн етс  чepтeжo.т.The invention is explained in FIG.

22

Способ монтажа опорных секций колонн плавучей бурово) установки заключаетс  в следующем.The method of mounting the supporting sections of the floating drilling rig columns is as follows.

Корпус / б}ровой хстановки устанавливают у заводского причала, глубина у которого примерно 18-20 м. Опориую колонну изготовл ют из отдельных секций на берегу с предварительной подгонкой их одна к другой и маркируют.The hull is installed at the factory berth, the depth of which is approximately 18-20 m. The support column is made of separate sections on the bank with preliminary fitting them to one another and marked.

Первую секцию 2 гр 3оподъемным краном подают сверху и при помощи лодъемно-снускного устройства 3 опускают до уровн  1 -1,5 м над водой. На нижнюю часть ее одевают кондуктор 4. Следующую секцию 5 подают крано .м на понтон 6 и закрепл ют на нем в вертикальном положении при помощи замков, профиль которых аналогичен профилю захватов иодъемно-спускного устройства. Понтон 6 с закрепленной на нем секцией по направл ющим тросам подаетс  к корпусу /, носле чего заполн етс  водой и затопл етс . С помондью тросов и лебедок плавучей буровой установки понтон подводитс  под нижнюю часть корпуса / в район выреза дл  колонны, закрепл етс .The first section 2 g of a 3-lifting crane is fed from above and is lowered to the level of 1 -1.5 m above the water with the help of the lift-snusk device 3. A jig 4 is put on the lower part of it. The next section 5 serves the valve to the pontoon 6 and is fixed on it in a vertical position with the help of locks, whose profile is similar to the profile of the grips of the i-take-off device. A pontoon 6 with a section fixed on it is guided along guide rails to the body /, and is filled with water and flooded. With the cables and winches of the floating drilling rig, the pontoon is guided below the bottom of the hull / into the cut-out area of the column, fixed.

медленно продуваетс  и всплывает. При этом верхн   часть секции 5 заходит в кондуктор который обеспечивает соосность секций колон ны. Всплыва , понтон своей подъемной силой обеспечивает прижатие стыкуемых торцовыхblows slowly and floats. In this case, the upper part of section 5 enters the conductor which ensures the alignment of the column sections. Floating, pontoon with its lifting force ensures the pressing of the butted end

поверхностей секций 2 и 5. После иодгонкиsurfaces of sections 2 and 5. After iodgonka

33

стыкуемых коццсв зтих секций произгоди гол их сварка и подъем собранного маспса nnejix до выхода нижней кромки секцнн 5 нз воды на 1 -1,5 лг.the jointed cotststs of these sections produce the goal of their welding and the raising of the assembled nnejix mars to the exit of the lower edge of the section 5 ns of water by 1 -1.5 lg.

Таким же способом подаютс  и стык дотс  носледующие секции.The dots joint of the following sections is supplied in the same way.

Предмет изобретени Subject invention

Снособ монтажа опорных ceKUiH колонн плавучей буровой установки с помон1,ыо понтонов , подъем1Ю-он скного хтр01 1Сгва и платформы с днищем, отличающийс  тем, что, с целью повышени  эффективности и качества монтажа, опорные секции колонн монтируют на понтоне в вертикальном положении и подают в нодъемно-спускное устройство в зоне монтажа, причем первую секцию подают сверху , а последующие - со стороны днища платформы , при этом стыковку торцовых поверхноетей опорных секций коло1 н обеспечивают нодъемной силой поитопов.The mounting method for supporting ceKUiH columns of a floating drilling rig with a pontoon, a pontoon hoist, a lifting platform and a platform with a bottom, characterized in that, in order to improve the efficiency and quality of installation, the column supporting sections are mounted on a pontoon in a vertical position and served in a lifting device in the mounting zone, with the first section being fed from above and the subsequent ones from the bottom of the platform, while joining the end surfaces of the supporting sections of the colo n provides the lifting force of the poitopes.

SU1606827A 1971-01-05 1971-01-05 METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION SU380825A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1606827A SU380825A1 (en) 1971-01-05 1971-01-05 METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1606827A SU380825A1 (en) 1971-01-05 1971-01-05 METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION

Publications (1)

Publication Number Publication Date
SU380825A1 true SU380825A1 (en) 1973-05-15

Family

ID=20462710

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1606827A SU380825A1 (en) 1971-01-05 1971-01-05 METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION

Country Status (1)

Country Link
SU (1) SU380825A1 (en)

Similar Documents

Publication Publication Date Title
US3433024A (en) Versatile marine structure
EP0084346A2 (en) Method and apparatus for positioning a working barge above a sea surface
US3605669A (en) Floating self-elevating platform
US3996754A (en) Mobile marine drilling unit
GB2201980A (en) Offshore oil/gas production
NO146145B (en) DRILLING DEVICE.
US5190410A (en) Conversion of mat jack-up drilling platforms to floating drilling platforms
IE47344B1 (en) Subsea drilling template
US2540878A (en) Submergible drilling rig foundation and method of constructing same
US4739840A (en) Method and apparatus for protecting a shallow water well
US4505615A (en) Method of supporting a shallow water drilling barge
US4907657A (en) Method for protecting a shallow water well
US2608829A (en) Portable marine foundation
SU380825A1 (en) METHOD OF INSTALLATION OF BASIC SECTIONS OF KOJLOHH SWIMMING DRILLING INSTALLATION
US2873581A (en) Marine platform
US3381482A (en) Marine drilling structure
US3429127A (en) Method and apparatus for establishing a fixed support of a buoyant body in rough water
RU2040638C1 (en) Sleetroof offshore platform
US3195313A (en) Offshore drilling platform
SU421573A1 (en) DRY DOCK
SU1014786A1 (en) Method of mounting support column of self-raising offshore drilling rig
SU606919A1 (en) Semi-submersible drilling platform
SU960374A1 (en) Method of mounting support column of self-raising offshore platform
JPS63165609A (en) Setting of offshore platform
SU1289957A1 (en) Method of setting offshore floating rig to drilling position