SU378456A1 - ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING - Google Patents

ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING

Info

Publication number
SU378456A1
SU378456A1 SU1681675A SU1681675A SU378456A1 SU 378456 A1 SU378456 A1 SU 378456A1 SU 1681675 A SU1681675 A SU 1681675A SU 1681675 A SU1681675 A SU 1681675A SU 378456 A1 SU378456 A1 SU 378456A1
Authority
SU
USSR - Soviet Union
Prior art keywords
furnace
screens
terles
cooling
product processing
Prior art date
Application number
SU1681675A
Other languages
Russian (ru)
Inventor
А. В. Рейз Я. И. Матин
Original Assignee
йОс СОЮ НАЯ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by йОс СОЮ НАЯ filed Critical йОс СОЮ НАЯ
Priority to SU1681675A priority Critical patent/SU378456A1/en
Application granted granted Critical
Publication of SU378456A1 publication Critical patent/SU378456A1/en

Links

Landscapes

  • Furnace Details (AREA)

Description

Иавестна электропечь дл  термической обработки азделий, включающа  кашеру, футеровку , нагреватели, , снабженные механизмом подъема, выдвижной под и усгройСТ1ВО дл  подачи хладонбоител . Однако охлаждение в печи при открытых деер х хот  и позвол ет павыюить скорость охлаж1денКЯ, но приводит « не|равномерности телшоратуры в печи. Неравно .мер но охлаждаютс  из)дел1и  ы при прв к1Двврвмен.ном выкатьлванИИ пода.An electric furnace for heat treatment of products, including kasher, lining, heaters, equipped with a lifting mechanism, retractable under and use of a cooling machine. However, cooling in a furnace with open deers although it allows the cooling rate of the cooling level to be quenched, but results in "not uniform tel'surature in the furnace. It is unequal to measure but is cooled from the divisions at the time of a vykvlvANI hearth.

Предложенна  печь снабжена многослойными экранами, отдел ющими футеровку с иаг|рввател 1м.и от из|дел1ий, цричем часть экранов вымолнена в виде угольникав, расположенных вцоль бскавых стен и закрепленных на проход щих ок|Возь ни.х и щиберы отрезках труб дл  выбр01са хладонасител  при совмещении труб с ка«ала1м.и футеровки. Это позвол ет увеличить производительность печи.The proposed furnace is equipped with multi-layered screens separating the lining of the 1m.patcher and from the windows, and a part of the screens is filled in the form of squares located along the wall and fixed to the sections of pipes that pass through | refrigerant when combining pipes with “ala1m. and lining. This makes it possible to increase the productivity of the furnace.

На фиг. 1 пока1за:на п-редложенна  печь, продольный разрез; на фиг. 2 и 3 - то же, с опущенными (три нагреве) и подн тыми (лри охлажш,) ШИ:бврам1И.FIG. 1 until: on the proposed furnace, longitudinal section; in fig. 2 and 3 - the same, with lowered (three heating) and raised (LRI cooling) SHI: bvramI.

Электропечь содержит стаци анарную футерЬвавную камеру 1, |ВЫ1Д|В(иж1Ной пощ 2, перемещающийс  1ПО рельсам на жатках .при помощи механиз1.ма 3 перещвижени  , дверь 4, за1Крывающую открытый проем камеры 7, л механизм 5 ,подъвМ1а . Дверь может бытьThe electric furnace contains a stationary futures chamber 1, | VY1D | V (an example of 2, moving 1PA to the rails on the headers. Using the mechanism 1. 3 movement, the door 4, covering the open opening of the chamber 7, l mechanism 5, podmv1a. The door can be

не подъемной и крепитьс  стационарно или шарнирно на падине.not lifting and fixed permanently or pivotally on the hollow.

На вертикальных стенках футерованной камеры, на двери и выд;ви1Ж1НО.м поде установлены на грбвательные элементы 6.On the vertical walls of the lined chamber, on the door and the standout;

На стенках, л)вери и оводе установлены стационарные и подвижные многослойные Э|Краны, выполненные из тонкол сто1ВОГО металла. Стацнона рньШИ выполнены илоакие верти каль ые 7 и 5 и горизонтальные 9 и 10 э/краны.On the walls, l) Veri and the gadfly, stationary and movable multilayered E | Cranes, made of thin metal of YOUR metal, are installed. Statsnona rshI are made of iloaky verti cal 7 and 5 and horizontal 9 and 10 e / cranes.

iB прастрансиве между вертикальными экранами 7 и S установлены трубы 11, соединенные с вентил тором с другИМ уст1ройCTiBOM дл  додачи хлащоносител .iB, between the vertical screens 7 and S, pipes 11 are installed, connected to a fan with another INSTALLATION SYSTEM for supplying the hloschonositel.

На стыке вертикальных (7 и S )и горизонтальных экранов (у свода камеры), расположены оодЩИжные эк|раны, выполненные в виде отдельных секций 12. Число секций может быть р азличньш и зависит от длины печи. В секцию вхо(Д т внешний 13 и внутренние 14 экраны, имеющие форму уголков и соединенные друг с другом (например, пр  (ПОМОЩИ шпилек).At the junction of vertical (7 and S) and horizontal screens (at the chamber arch), there are optional screens, made in the form of separate sections 12. The number of sections may be different and depends on the length of the furnace. In the inlet section (D t external 13 and internal 14 screens having the shape of corners and connected to each other (for example, pr (HELP studs)).

Секци  крепитс  на двух отрезках труб 75. Один конец отрезка проходит через отверсти  в экра1на;х 13 и 14, к которым он приварен, Д(рутой конец цроходит через подъемный футерованный 16 и непоавижно закреплен /в нем. The section is fastened on two pieces of pipe 75. One end of the segment passes through the holes in the shield; x 13 and 14, to which it is welded, D (ruddy end goes through the lifting lined 16 and immobile / fixed in it.

Шибер 16 пар смещаетс  (поднимаетс  и спуакаетс ) в |Ве|рти(кальнол1 ка«але а.The gate of 16 pairs shifts (rises and discharges) in | Vertier (ballroom).

iB своем нижнем пол ажении шибер переiKipbiiBiaeT гориз1онтальный ;ка1нал б, расположенный во веешнем слое футеровки камеры. Канал б нмеет одинаковое сечение с сечением трубы 15, а ось его проходит между экранами 9 и 10. К каналу б na ooeAHiHeHbi трубы 17 дл  отвода лор чего воздуха от печи. На своде каме1ры раслоложены вентил торы 18, рабочие колеса которых помещены в п-ростран СТ;ве агежду sKipa.HaiMH 9 и 10.iB in its lower floor, the re-KipbiiBiaeT horizontal gate is horizontal; b, located in the latest lining layer of the chamber. The channel b has the same cross-section with the section of the pipe 15, and its axis passes between the screens 9 and 10. To the channel is b ooeAHiHeHbi of the pipe 17 for removal of air from the furnace. On the chamber roof there are fans 18, the impellers of which are placed in p-rostran ST; the range between sKipa.HaiMH 9 and 10.

На ВЫДВ.ИЖ1НОМ паде уст аи а/в лишаютс  решетчатые подстзйюи 19, на которые укладываютс  издели  20.On VYDV.IZH1NOM Pada, the trellis pods 19 are loosened and the products 20 are placed on them.

Р.абота печи ооущест1вл етс  в следующей последавательносии.The kiln operation is carried out in the following sequence.

Выдвижной под 2 находитс  вне камеры 1. Происходит за.грузка г1Здел.ий на подста/в-ки 19 пода. Открываетс  дверь 4 и .под с из(дели1 ми закатываетс  в камеру /. Затем Д(верь опу-акаетс . Шибер 16 .находитс  в нижне-м положении . При этам гсризо1нтальные участки экранов 13 и 14 лежат соответственно на SKipaHax 9   10. Канал б перек рыт шибером. Оба конца отрезков труб 15 перамрыты с одной стороны внешним слоем футеровки с друтой - внешним стационар-ным siKpaHOiM 7. Включаютс  вентил торы 18 и нагревательные элементы 6. Благадар  направленной циркул ции rasa обеспечиваетс  интенсивна  передача тепла от нагревателей к из:дели м и быстрый разопрев .последних.Sliding under 2 is out of chamber 1. There is a load of g1Division on supports / B-pod 19. The door 4 and the door are opened with (the task is rolled into the chamber /. Then D (trust the player. The gate 16 is in the lower position. At this point, the sections of screens 13 and 14 lie respectively on SKipaHax 9 10. Channel Both ends of pipe sections 15 are framed on one side by an outer lining layer with a friend - external stationary siKpaHOiM 7. Fans 18 and heating elements 6 are turned on. Thanks to the rasa directional circulation, heat is transferred intensively from: to: Delhi m and fast heating .

Воздух, цир1кулирующий :в печи, при этом движетс  от вентил торав между э:крана1ми 9 и 10, экранами 13 и 14, футеровкой и экраном 7. Далее он омывает под, подставки и издели  и всасываетс  вентил тором.The air circulating: in the furnace, while moving from the fan between e: cranes 9 and 10, screens 13 and 14, the lining and the screen 7. Then it washes under, stands and products and sucked by the fan.

По окончании нагрева и выдержки при заданной температуре нагреватели отключаютс  .и шибер 16 поднимаетс . При этом шибер устанавливаетс  образОм, что оси трубы 15 и -канала б совпадают; горизонтальный участок экрана М утираетс  в эюран 9, а вертикальный участок 1всей нижней частью лежит на экране 7, не аропускаЯ циркулирующий газ к нагревател м и футе(рав:ке. В пространство между Э1кранами 7 и S по трубам 11 вводитс  холодный воздух. Пр1охо1д  между экранами 7At the end of heating and holding at a given temperature, the heaters are turned off. And the gate 16 rises. In this case, the gate is established in such a way that the axes of the pipe 15 and the channel b are the same; The horizontal section of screen M is wiped into Eyuran 9, and the vertical section 1 with the entire lower part lies on screen 7, not the circulating gas to the heaters and foot (equal to: ke.) Cold air is introduced into the space between E1 screens 7 and S. screens 7

и 5, он перемещиваетс  с гор чи1М воздухом, циркудирующИМ в печи, затем омывает под 2, подота1В|ки 19, издели  20 и движетс  к вентил тору .and 5, it moves with hot air circulating in the furnace, then it washes under 2, sub 19V, product 20 and moves towards the fan.

Далее возду х проходит между экранами 9 и 10 и ээдрано.м 14 направл етс  в пространство между экранами 7 и 5.Further, the air passes between screens 9 and 10 and ehedron.m 14 is directed into the space between screens 7 and 5.

Часть воздуха (по весу равное количеству хо.тодпого воздуха, в(вади1мо го в печь по трубам 11) через трубы 15, каналы б и трубы 17 выбрасываетс  из печи. Дл.  обесиечени  равHoiMepHoro охлаждени  из(делий часова  производительность вентил торов должна быть значительно больше, чем количество холодиого воздуха вводи .мсго по трубам // в печь за 1 час.A part of air (by weight equal to the amount of hot air, c (wi-fi into the furnace through pipes 11) through pipes 15, channels b and pipes 17 is ejected from the furnace. For cooling equilibrium cooling is equal to (i), more than the amount of cold air injected through pipes // into the furnace in 1 hour.

В процессе охлаждени  холодный воздух дви1жетс1Я в пространстве между экрана-ми 9, 10, и 7 S и не соприкасаетс  с футеровкой.In the process of cooling, the cold air moves in the space between screens 9, 10, and 7 S and does not come into contact with the lining.

Это позВ|Ол ет охла1ждать издели  без значительного охлаждени  футерав1КИ (особенно при низких температурах), сэкономить часть аикумул торного кладкой тепла дл  последующил ЦИ|КЛ01В и значительно увеличить скорость охлаждени  изделий. ИзМШ   количество холодного воздуха, вводимого в печь, можно измен ть скорость охлаЖДени  изделий в ширсжих .пределах.This allows you to cool the product without significant cooling of the lining (especially at low temperatures), save a part of the aumulator thermal masonry for subsequent QI | KL01V and significantly increase the cooling rate of the products. Using the amount of cold air introduced into the furnace, it is possible to vary the rate of cooling of the products in the wide limits.

По окончании охлаждени  изделий прекращаетс  подача .холодного воздуха в печь, щиберы опускаютс  и П1одни1.маето  дверь. Затем под выкатываетс  из печи, Д1верь опускаетс . Производитс  разгрузка обработанных изделий и загруз1ка новых. повтор етс .At the end of the cooling of the products, the supply of cold air to the furnace is stopped, the hooks are lowered and the door is stopped. Then, under the roll out of the furnace, the door is lowered. Unloading of processed products and loading new ones. repeats.

Пред .м е т изобретени Prevention of Invention

Электропечь дл  тер мообработки изделий, включающа  KaiMepy, футеровку, нагреватели,Electric furnace for heat treatment of products, including KaiMepy, lining, heaters,

шиберы, снабженные механизмо.м подъема, .выдвижной под и устрОЙство дл  подачи хладонасител , отличающа с  те.м, что, с целью увеличени  производительности печи , она сна)бжена многослойными э крапами, одни изgates equipped with a lifting mechanism, a movable platform and a device for supplying refrigerant, characterized in that, in order to increase the productivity of the furnace, it sleeps with multilayer e-specks, one of

(которых выполнены в виде угольников, расположенных вдоль боковых стен и закрепленных на прожад щих сквозь них и шиберы отрез (ках труб дл  выброса хладоносител  при совмещени и труб с каналами футерогуки.(which are made in the form of squares located along the side walls and fixed on the cut section passing through them and on the gate valves (pipes for discharge of the coolant when combined and pipes with channels of footguards.

1212

33

SU1681675A 1971-07-19 1971-07-19 ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING SU378456A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1681675A SU378456A1 (en) 1971-07-19 1971-07-19 ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1681675A SU378456A1 (en) 1971-07-19 1971-07-19 ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING

Publications (1)

Publication Number Publication Date
SU378456A1 true SU378456A1 (en) 1973-04-18

Family

ID=20483054

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1681675A SU378456A1 (en) 1971-07-19 1971-07-19 ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING

Country Status (1)

Country Link
SU (1) SU378456A1 (en)

Similar Documents

Publication Publication Date Title
US3565410A (en) Vacuum furnace
JP4378090B2 (en) Hot air circulation furnace
US2869856A (en) Furnaces
US1727192A (en) Annealing equipment and method
CA2548786C (en) Hot-air circulation furnace
SU378456A1 (en) ELECTRIC OVEN FOR TERLES / PRODUCT PROCESSING
JP4378432B2 (en) Hot air circulation furnace
US2074662A (en) Rotating hearth furnace
US2693353A (en) Forced circulation cooling apparatus for continuous strip furnaces
US1934904A (en) Vertical conveyer oven
US2254913A (en) Electric furnace
US20100272422A1 (en) Retort furnace for heat and/or thermochemical treatment
US4718847A (en) Kiln system
JP2567140B2 (en) Bright annealing furnace
NL2004883C2 (en) Annealing installation with m-shaped strip treatment tunnel.
KR102046150B1 (en) Annealing furnace and annealing method using the same
US2602653A (en) Bright strip annealing apparatus
US2669442A (en) Annealing apparatus
GB997531A (en) Aluminium annealing furnace
US2023101A (en) Furnace
US3296039A (en) Method of preventing the formation of black stripes in the heat-treatment of metal bodies
US2261702A (en) Annealing furnace
US2014598A (en) Annealing furnace
US3138200A (en) Cooling of moving metal strip
RU2815210C1 (en) Vertical furnace for continuous heat treatment of metal strip