Prior art keywords
coal
shield
mining
formation
strip
Prior art date
Application number
SU1416012A
Other languages
Russian (ru)
Original Assignee
Институт горного дела Сибирского отделени СССР ВОЕС
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела Сибирского отделени СССР ВОЕС filed Critical Институт горного дела Сибирского отделени СССР ВОЕС
Priority to SU1416012A priority Critical patent/SU374452A1/en
Application granted granted Critical
Publication of SU374452A1 publication Critical patent/SU374452A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

1one

Изобретение относитс  к технологии отработки угольных пластов крутого и наклонного падени  и может быть использовано при механизированной отбойке и доставке угл  под щитовым опускающимс  креплением.The invention relates to the technology of mining coal seams steep and oblique incidence and can be used for mechanized breaking and delivery of coal under the shield lowering mount.

Известные щитовые системы и способы разработки не позвол ют снизить количества подготовительных выработок и не дают достаточной эффективности отбойки.Known shield systems and development methods do not allow to reduce the number of development workings and do not provide sufficient efficiency of blasting.

По предлагаемому способу отбойку угл  производ т полосами с аккумулированием отбитого угл  в подщитовом пространстве, а перепуск аккумулированного угл  совмещают во времени с отбойкой последующей полосы. Это позвол ет повысить эффективность отработки пласта.According to the proposed method, the coal is crushed by strips with accumulation of broken coal in the shield space, and the accumulated coal bypass is combined in time with the striking of the subsequent strip. This makes it possible to increase the efficiency of formation mining.

Подготовка выемочного способа включает проведение углеспускных печей 1, 2 и 3 (см. чертеж) и монтаж щитового перекрыти  4 с канатно-щелевыми продольными св з ми. На направл ющих 5, прикрепленных к щиту по всей длине, подвещена выемочна  машина 6 с исполнительным органом скалывающего действи  на руко ти, качающейс  во взаимно перпендикул рных направлени х. При этом добычна  мащина соединена с конвейером 7, предназначенный дл  транспортировани  угл  к углеспускным печам. С монтажного положени  производ т выемку канавообразной выработки полосой, а отбитый уголь аккумулируют в подщитовом пространстве и загружают в углеспускную печь конвейером, имеющим длину, равную рассто нию между смежными печами 1 и 2. Конвейер 7 работает вместе с выемочной машиной 6.Preparation of the excavation method includes conducting coal-fired furnaces 1, 2 and 3 (see drawing) and installing panel board ceiling 4 with cable-slotted longitudinal links. In the guides 5 attached to the shield along the entire length, a notch machine 6 is fitted with an executive member of a shearing action on the handle, rocking in mutually perpendicular directions. At the same time, the mining machine is connected to the conveyor 7, intended for transporting coal to coal-fired furnaces. From the installation position, grooves are dredged by a strip, and coal is accumulated in the shield space and loaded into a coal-fired furnace with a conveyor having a length equal to the distance between adjacent furnaces 1 and 2. Conveyor 7 works together with the cutting machine 6.

После выемки канавы в правой части забо  конвейер отсоедин ют от мащины и ее перегон ют дл  выемки левой части забо . После выемки канавы на длину полосы приступаютAfter excavation, the ditches in the right side of the bottom of the conveyor are disconnected from the maschine and it is distilled to remove the left side of the bottom. After dredging ditches on the length of the strip proceed

к посадке щита, к подборке и выгрузке аккумулированного угла. Посадкой щита в левой и правой част х забо  цикл работы заканчиваетс . Управление посадкой щита производитс  отбойным органом мащины путем проведени  в целиках у почвы пласта посадочной щели. Вторым циклом осуществл ют подсечку посадочной щели у вис чего блока пласта. Такими поочередными посадками щита Челноковымto boarding the board, to the collection and unloading of the accumulated angle. The landing of the shield in the left and right parts of the bottom of the work cycle is completed. Shield planting control is carried out by the fencing body of the maschina by holding a landing slot in the pillars of the soil. The second cycle carries out the hooking of the landing slot at the hanging of the formation block. Such alternate landings shield Chelnokov

методом, полосами по всей длине перекрыти , достигаетс  необходима  управл емость щитом по падению. В случае изменени  угла попадани  пласта из-за сложной гипсометрии цикл работы по посадке щита у почвы пли уby the method, strips along the entire length of the overlap, the required controllability of the shield in the fall is achieved. In the case of a change in the formation angle due to complex hypsometry, the cycle of work on planting a shield near the ground or

кровли пласта повтор етс  два или более раз. Дл  предупреждени  зажима режущего органа добычной машины при посадке торцов машиной провод т опережающие ниши, из которых опорный целик подрезают снизу, щитthe roof of the formation is repeated two or more times. To prevent the cutting body of the mining machine from being clamped, during landing, the machine conducts leading niches from which the supporting rear sight is cut from below, the shield

опускают на плоскость посадки, а режущийis lowered onto the landing plane, and the cutting

орган добычной машины вместе body mining machine together

с этим ш;итом - в нишу.with this w; itom - in a niche.

Предмет изобретени Subject invention

Щитовой способ разработки крутопадаюш ,их и наклонных угольных пластов, включаюший механизированную отбойку угл  и перепуск его по углеспускным печам,, .подрезку опорных целиков и опускание ш;ита, отличающийс  тем, что, с целью повышени  эффективности отработки пласта, отбойку производ т полосами с аккумулированием отбитого угл  в подщитовом пространстве, а перепуск аккумулированного угл  совмешают во времени с отбойкой последующей полосы.Shield method of development of steepleheads, theirs and inclined coal seams, including mechanized coal breaking and passing it through coal-fired furnaces, cutting off supporting pillars and lowering w; this, in order to increase the efficiency of mining the formation, strip the accumulation of broken coal in the shield space, and the bypass of the accumulated coal is combined in time with the breaking of the subsequent strip.

SU1416012A 1970-03-19 1970-03-19 U SU374452A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1416012A SU374452A1 (en) 1970-03-19 1970-03-19 U

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1416012A SU374452A1 (en) 1970-03-19 1970-03-19 U

Publications (1)

Publication Number Publication Date
SU374452A1 true SU374452A1 (en) 1973-03-20

Family

ID=20450941

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1416012A SU374452A1 (en) 1970-03-19 1970-03-19 U

Country Status (1)

Country Link
SU (1) SU374452A1 (en)

Similar Documents

Publication Publication Date Title
SU374452A1 (en) U
RU2007575C1 (en) Heading machine
US3473846A (en) Shearer-loader supported against horizontally extending forces
RU2068092C1 (en) Method for mining of thin gently dipping and inclined ore deposits
SU1665038A1 (en) Method of driving narrow-face workings with separate coal and rock extraction
SU1035221A1 (en) Method of working gently-sloping coal seams with coal and gas outburst hazard present
SU1134716A1 (en) Method of mining gently-sloping coal seams
SU1352059A1 (en) Method of mining thick steep seams
US2778622A (en) Mining method providing for continuous progression of mining machinery
RU2078937C1 (en) Method of installation of powered support of powered mining complex
SU883447A1 (en) Method of working mineral deposits
SU1666723A1 (en) Method for treatment of thin, slightly steeping and inclined beds
SU907251A1 (en) Method of working coal beds
SU883527A1 (en) Method of filling worked area at excavating thin gently sloping seams
SU1139847A1 (en) Method of mining thick coal beds
SU1642011A1 (en) Method of mining steep coal seams
RU2058487C1 (en) Complex-aggregate powered support
SU1337522A1 (en) Method of mounting the support of machinized mining set on ground surface
SU1752983A1 (en) Method of mining outburst-prone potassium beds
SU693017A1 (en) Method of mining mineral deposits
RU2047765C1 (en) Method for development of inclined ore body
SU775320A1 (en) Method of working gently sloping mineral deposits
SU1710752A1 (en) Method of preparing coal seams
SU1751332A1 (en) Method of mining steep coal seams prone to gas-dynamic effects
SU1680994A1 (en) Method for working steep coal seams having tendency towards gas dynamic effects