Изобретение относитс к погрузочным устройствам дл сыпучих материалов, состо щим из подвижного по наклонной плоскости ковшевого скребка, опрокидывающегос при достижении вершины подъема . В предлагаемом устройстве через продольный прорез в стенках ковша под его дном пропущен стержень, прикрепленный к рамке, св занной с т говым канатом. Передвижение ковша в верхней части наклонной плоскости и его опрокидывание происходит по инерции после остановки стержн и рамки под воздействием соответствующих упоров.BACKGROUND OF THE INVENTION The invention relates to loading devices for bulk materials, consisting of a bucket scraper moving along an inclined plane, tilting when reaching the top of the lift. In the proposed device, a rod is attached through a longitudinal slot in the walls of the bucket under its bottom, which is attached to a frame connected to a cable. The movement of the bucket in the upper part of the inclined plane and its tilting occurs by inertia after the rod and the frame stop under the influence of the corresponding stops.
На схематическом чертеже фиг. 1 и 2 изображают погрузочное устройство в двух проекци х; фиг. 3 - общую схему расположени устройства в плане.In the schematic drawing of FIG. 1 and 2 depict a loading device in two projections; FIG. 3 shows the general layout of the device in the plan.
Вдоль штабелей / (фиг. 3) подлежащего погрузке материала и далее по наклонной плоскости, составленной из звеньев.5, передвигаютс к месту погрузки при помощи лебедки 14 и тросов 12 ковшевые скребки/с грузом. Изготовленный из котельного железа ковшевой скребок 7 (фиг. 1 и 2) сверху и с передней стороны открыт и снабжен двойным дном, служащим дл пропуска поперек ковша 7 стержн Р, могущего свободно передвигатьс в имеющихс в боковых стенках между днищами продольных прорезах 8. На концах стержн 9 шарнирно надета рама W, к которой спереди и сзади прикреплен т говой трос 12Дл облегчени передвижени ковшевого скребка 7 по наклонной плоскости на последней , на рассто ни х, меньших длины дна ковша, установлены поперечные ролики 6. Наклонна плоскость одним концом упнраетс выступом 5 в землю, а другим- на передвижную вдоль причальной линии ферму (стойку) 4. Верхний конец плоскости 3 снабжен упорами 2 - 2, о которые задерживаютс выступающие концы стержн Я и воронкой 27, служащей дл спуска груза по лотку 22 в трюм 2 парохода или барки.Along the stacks / (fig. 3) of the material to be loaded and further along an inclined plane made up of links, 5 are moved to the place of loading by means of a winch 14 and cables 12 bucket scrapers / with a load. The ladle scraper 7 (figs. 1 and 2), made of boiler iron, is open and provided with a double bottom at the top and the front side, which serves to pass through the bucket 7 of the rod P, which can freely move in the side walls between the bottoms of the longitudinal slots 8. At the ends The rod 9 is pivotally attached to the frame W, to which a front cable 12 is attached to the front and rear. To facilitate the movement of the scraper 7 along the inclined plane on the latter, transverse rollers 6 are installed at a distance shorter than the bottom of the bucket bottom 6. the bottom end of the protrusion 5 protrudes into the ground, and the other on the farm (stand) 4, mobile along the mooring line. The upper end of the plane 3 is provided with stops 2 - 2, about which the protruding ends of the hinge I and the funnel 27 serving to lower the load on the chute 22 in the hold 2 steamer or boat.
Проход вдоль штабелей сыпучего материала , ковшевой скребок 7 аахватывает груз и несет его по наклонной плоскости вверх, пока выступающие концы стержн 9 тле задержатс упорами 2 - 2, пои чем рамка 10. подт нута через блок 13 тросом /2, остановитс , ке Ьреп тству ковшеаому скребку 7 по инерции продолжать движение вдоль своего бокового прореза 8, и после того как его передн часть перевесит заднюю, скребок 7, повернувшись на стержне 9 как на оси, опрокинетс , высыпав груз в воронку 21.The passage along the stacks of bulk material, the scraper 7 pulls the load and carries it upwards along an inclined plane until the protruding ends of the rod 9 are held up by stops 2 - 2, more than the frame 10 is pulled up through the block 13 with a cable / 2, stops By inertia, the bucket scraper 7 will continue to move along its side cut 8, and after its front part outweighs the back, the scraper 7, turning on the rod 9 like on an axis, will overturn, pouring the load into the funnel 21.
Приближение ковшевых скребков 7 к штабел м 1 по мере уменьшени последних при нагрузке достигаетс лебедApproaching bucket scrapers 7 to stacks 1 as the latter diminishes under load, a swan is reached