SU276866A1 - METHOD OF REDUCING THE DISPOSAL OF THE MOUNTAIN MASS ON CAREERS - Google Patents
METHOD OF REDUCING THE DISPOSAL OF THE MOUNTAIN MASS ON CAREERSInfo
- Publication number
- SU276866A1 SU276866A1 SU1241314A SU1241314A SU276866A1 SU 276866 A1 SU276866 A1 SU 276866A1 SU 1241314 A SU1241314 A SU 1241314A SU 1241314 A SU1241314 A SU 1241314A SU 276866 A1 SU276866 A1 SU 276866A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- reducing
- careers
- disposal
- mountain mass
- mass
- Prior art date
Links
- 239000011435 rock Substances 0.000 description 4
- 238000005422 blasting Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
Description
При взрывании зар дов ВВ, которые помещены в скважинах, пробуренных параллельно откосу уступа, имеет место значительный развал горной массы.When blasting explosive charges that are placed in wells drilled parallel to the ledge, there is a significant camber of the rock mass.
Огличне предлагаемого сиособа состоит в том, что дл уменьшени дальности отброса взорванной породы от откоса уступа скважины бур т параллельио плоскости экскаваторного забо .The proposed method is that in order to reduce the distance of the blasted rock from the slope of the step of the borehole, a parallel to the plane of the excavator is drilled.
На чертеже представлена схема, иллюстрирующа предлагаемый способ, где 1 - экскаваторный забой, 2 - скважины на уступе, 3- откос устуиа.The drawing shows a diagram illustrating the proposed method, where 1 is an excavator face, 2 are wells on a ledge, 3 is a ustia slope.
Продольна ось 4 каждой скважнны ориентирована в сторону экскаваторного забо .The longitudinal axis 4 of each borehole is oriented toward the excavator bottom.
Предмет изобретени Subject invention
Снособ сокращени развала горной массы на карьерах прн взрывании колонковых зар дов в наклонных скважинах, отличающийс тем, что, с целью уменьшени дальности отброса взорванной иороды от откоса уступа, скважины бур т параллельно плоскости экскаваторного забо .The method of reducing the collapse of the rock mass in the open pits by blasting coring charges in inclined boreholes, characterized in that, in order to reduce the distance of the blown up blasted rock from the slope of the ledge, the borehole is parallel to the plane of the excavator slab.
J JIL ILULIJJJ JIL ILULIJJ
-er- -er-
-e-: I -e-: I
Publications (1)
Publication Number | Publication Date |
---|---|
SU276866A1 true SU276866A1 (en) |
Family
ID=
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2476819C1 (en) | Method for shooting of ores and rocks on underground mining works | |
SU276866A1 (en) | METHOD OF REDUCING THE DISPOSAL OF THE MOUNTAIN MASS ON CAREERS | |
RU2464421C2 (en) | Extraction of ore using explosion and thermal fragmentation | |
Shyrin et al. | Substantiating rational parameters of a method for shrinkage ore stoping while developing thin-vein steeply inclined deposits | |
Chandrakar et al. | Long-hole raise blasting in a single shot: assessment of void ratio and delay time based on experimental tests | |
SU1263868A1 (en) | Method of controlling the strained state of rock about mine working | |
RU2224891C2 (en) | Method for extracting mined blocks during subterraneous extraction of blind ore bodies | |
RU2154254C1 (en) | Method for drilling and blasting operations in open cuts | |
RU2229602C2 (en) | Method for driving vertical shaft | |
SU142241A1 (en) | METHOD OF BLOODING THE NEW WELLS IN SIDE | |
SU1314066A1 (en) | Method of mining ore bodies | |
RU2019705C1 (en) | Method for control of heaving of mine working floor | |
SU1506109A1 (en) | Method of protecting development workings | |
SU1516603A1 (en) | Method of driving horizontal workings | |
SU795077A1 (en) | Method for working benches in quarry | |
SU907254A1 (en) | Method of extinguishing voids | |
SU1364726A1 (en) | Method of mining gently-sloping ore deposits | |
SU1461930A1 (en) | Method of combined mining of mineral deposits | |
SU1469178A1 (en) | Method of relieving rock around a working | |
Institution of Mining and Metallurgy et al. | Geotechnical aspects of vertical crater mining method in a deep mine | |
SU313979A1 (en) | METHOD OF MANAGEMENT OF LABOR-DESTRUCTIVE ROOFING | |
SU1314065A1 (en) | Method of mining ore bodies | |
RU1770571C (en) | Method for making raise mine working | |
SU1180518A1 (en) | Method of enhancing the stability of fissured rock when driving mine workings | |
SU1559162A1 (en) | Method of excavating materials from underground formations |