SU1753954A3 - Method of erecting multustorey building by lifting floors - Google Patents

Method of erecting multustorey building by lifting floors Download PDF

Info

Publication number
SU1753954A3
SU1753954A3 SU904841768A SU4841768A SU1753954A3 SU 1753954 A3 SU1753954 A3 SU 1753954A3 SU 904841768 A SU904841768 A SU 904841768A SU 4841768 A SU4841768 A SU 4841768A SU 1753954 A3 SU1753954 A3 SU 1753954A3
Authority
SU
USSR - Soviet Union
Prior art keywords
lift
floors
erecting
core
building
Prior art date
Application number
SU904841768A
Other languages
Russian (ru)
Inventor
Владимир Григорьевич Локшин
Соломон Исаакович Штутман
Даниил Иванович Негода
Original Assignee
Кооперативное Управление Монолитного Домостроения (Su)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Кооперативное Управление Монолитного Домостроения (Su) filed Critical Кооперативное Управление Монолитного Домостроения (Su)
Priority to SU904841768A priority Critical patent/SU1753954A3/en
Application granted granted Critical
Publication of SU1753954A3 publication Critical patent/SU1753954A3/en

Links

Abstract

Использование: строительство, монтаж, возведение многоэтажных зданий. Сущность изобретени : способ возведени  мно- гоэтажного здани  методом подъема этажей включает операции устройства фундамента , одного или нескольких  дер жесткости , изготовление этажей на нулевой или ниже отметках и поочередный подъем этз- жей вдоль  дра жесткости на проектную отметку . При воздействии  дра жесткости на его наружной поверхности образуют опорные площадки, а после его возведени  у основани  монтируют шаговый подъемник с шарнирно прикрепленными к его несущей площадке парными выдвижными упорами. Изготовление каждого этажа производ т на несущей площадке шагового подъемника, а подъем этажей осуществл ют путем поочередного переопирани  каждого из выдвижных упоров подъемниками на опорные площадки  дра жесткости с последующим перемещением подъемника вниз обратным ходом после каждого подъема и закреплени  этажа на соответствующих опорных площадках  дра жесткости. 8 ил. № СUse: construction, installation, construction of multi-storey buildings. SUMMARY OF THE INVENTION: A method for erecting a multi-storey building by lifting floors includes the operations of constructing a foundation, one or more cores, making floors at zero or below elevations, and alternating elevating ate along the core of rigidity to the design elevation. When exposed to a stiffener core, its supporting surfaces form on the outer surface, and after its erection, a stepper lift is mounted at the base with hingedly attached to its carrying area paired retractable stops. Each floor is manufactured on the carrier platform of the stepper lift, and the floors are lifted by alternately re-drawing each of the sliding stops with lifts to the support platforms of the stiffener and then moving the elevator downwards after each lift and securing the floor to the corresponding support platforms of the stiffening rod. 8 il. № С

Description

Изобретение относитс  к строительству и может быть использовано при возведении многоэтажных зданий методом подъема этажей.The invention relates to the construction and can be used in the construction of multi-storey buildings by the method of lifting floors.

Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ возведени  многоэтажного здани  путем подъема этажей, включающий устройство фундамента, возведение по крайней мере одного  дра жесткости , изготовление этажей на нулевой или ниже отметках и поочередный подъем их вдоль  дра жесткости на проектную отметку .The closest to the invention to the technical essence and the achieved result is a method of erecting a multi-storey building by raising floors, including building a foundation, erecting at least one core of rigidity, making floors at zero or below marks and alternately lifting them along the core of rigidity to the design mark.

Недостатками известного способа  вл ютс  повышенные трудоемкость и сроки строительства, св занные с необходимостью монтажа подъемных механизмов на оголовке  дра жесткости, а также невозможность полного обустройства коммуникаций в  дре жесткости до окончани  подъема всех этажей из-за необходимости демонтажа и спуска грузоподъемных механизмов, отсутствие возможности производства работ по изготовлению этажей при неблагопри тных погодных услови х.The disadvantages of this method are the increased complexity and construction time associated with the need to install the lifting mechanisms on the head of the rigidity core, as well as the impossibility of fully arranging communications in the core of rigidity before the end of the lifting of all floors due to the need to dismantle and lower the lifting mechanisms, the inability to manufacture work on the manufacture of floors under adverse weather conditions.

Цель изобретени  - уменьшение трудоемкости с сокращением монтажного оборудовани .The purpose of the invention is to reduce the labor intensity with the reduction of mounting equipment.

VJ ел ы ю ел 1VJ ate you ate 1

САCa

Поставленна  цель достигаетс  тем, что в способе возведени  многоэтажного здани  путем подъема этажей, включающем устройство фундамента, возведение по крайней мере одною  дра жесткости, изго товление этажей на нулевой или ниже отметках и поочередный подьем их вдоль  дра жесткости на проектную отметку, при возведении  дра жесткости на его наружной поверхности образуют опорные площадки, а пос е возведени   дра жесткости у его основани  монтируют шаговый подъемник с шарнирно прикрепленными к его несущей площадке парными выдвижными упорами, при этом изготовление каждого эгажа осуществл ют на несущей площадке подъемника ,, а подъем этажей - путем поочередного переопирани  каждого из выдвижных упоров подъемника на опорные площадки  дра жесткости с последующим перемещением подъемника вниз обратным ходом госле каждого подъема и закреплени  этажа на соответствующих опорных площадках  дра жесткости,The goal is achieved by the fact that in the method of erection of a multi-storey building by raising floors, including building the foundation, erecting at least one stiffener, making floors at zero or below elevations and alternately raising them along the stiffener to the design elevation support platforms form on its outer surface, and after erecting a stiffening core at its base, a stepper lift is mounted with hinged pull-out arms attached to its supporting platform In this case, the manufacture of each exhaust is carried out on the carrier platform of the lift, and the rise of the floors is done by alternately re-drawing each of the sliding stops of the lift to the support platforms of the rigidity core, followed by moving the lift downward by reversing the lift of each lift and securing the floor to the respective support platforms of the core stiffness

На фиг. 1 изображено здание с несколь кими  драми жесткости, построенное предлагаемым способом, общий вид; на фиг. 2 - конструкци  кровли на нулевой или ниже отметках; на фиг. 3 и А - подъем кровельной конструкции шаговым подъемником по  дру жест кости с переопиранием его выдвижных упоров на вышерасположенные опорные площадки; на фиг. 5 - закрепление кровельной конструкции на проектной отметке и обратное перемещение шагового подъемника; на фиг 6 - изготовление верхнего этажа на нулевой отметке; на фиг, 7 - подъем верхнего этажа на проектную отметку; на фиг. 8 - закрепление этажа на проектной отметке и обратное перемещение шагового подъемника,FIG. 1 shows a building with several drastic stiffnesses constructed by the proposed method, general view; in fig. 2 - roof construction at zero or below marks; in fig. 3 and A - the rise of the roof structure with a stepper lift along the bone with re-drawing of its sliding stops on the upstream supporting platforms; in fig. 5 - fastening of the roof structure at the design mark and reverse movement of the stepper lift; Fig 6 - manufacture of the upper floor at the zero mark; Fig, 7 - the rise of the upper floor to the design mark; in fig. 8 - fixing the floor at the design mark and the reverse movement of the stepper lift,

Способ возведени  многоэтажного здани  заключаетс  в следующем,The method for erecting a multistory building is as follows.

После устройства фундамента 1, например , из монолитного железобетона производ т возведение одного или нескольких  дер 2 жесткости в зависимости от архитектурных решений и размеров в плане возводимого здани , из монолитного железобетона в скольз щей или переставной опалубке (не показана). Одновременно с возведением  дер 2 жесткости образуют на их поверхности опорные площадки 3. Затем в подвальной части 4 возводимого здани  монтируют одно или несколько шаговых подъемников 5 в зависимости от числа  дер 2 жесткости, имеющие на своей несущей площадке шарнирно закрепленные парные выдвижные упоры 6. После этого на перекрытии 7 подвальной части 4 и наAfter the installation of foundation 1, for example, from monolithic reinforced concrete, one or several cores 2 rigidity are erected depending on the architectural solutions and sizes in terms of the building being erected, from monolithic reinforced concrete in sliding or adjustable formwork (not shown). Simultaneously with the construction of the core 2, stiffnesses are formed on their surface 3. Support platforms 3. Then, in the basement 4 of the building being erected, one or several stepper lifts 5 are mounted, depending on the number of stiffnesses 2, having on their supporting platform articulated paired retractable supports 6. After that on the ceiling 7 basement part 4 and on

несущей площадке шагового подъемника 5 производ т изготовление конструкции кровли 8 и подъем на проектную отметку шаговым подъемником 5 посредством попеременного переопирани  (шагани ) его выдвижных упоров 6 на вышерасположенные опорные площадки 3. По достижении проектной отметки конструкцию кровли 8 закрепл ют на  дре 2 жесткости и производ т обратное перемещение вниз шагового подъемника 5 с шаговонепрерывным переопиранием его выдвижных упоров 6 на нижерасположенные опорные площадки 3 до опускани  его на уровень изготовлени  этажей . Далее производ т изготовление этажей 9 последовательно с верхнего до нижнего из монолитного железобетона, включа  отделочные работы и монтаж инженерного оборудовани  и коммуникаций 10the supporting platform of the stepper elevator 5 manufactures the roof structure 8 and lifts it to the design elevation by stepping elevator 5 by alternately re-drawing (stepping) its retractable stops 6 onto the upstream supporting platforms 3. Upon reaching the design elevation, the roof construction 8 is fixed on the core 2 stiffness and production t reverse movement down the stepper lift 5 from a step-by-step re-drawing of its retractable stops 6 to the downstream supporting platforms 3 to lower it to the level of floor construction . Next, floors 9 are fabricated sequentially from the top to the bottom of monolithic reinforced concrete, including finishing works and installation of engineering equipment and communications 10

(отопление, электричество, вентил ци  и т.д). После завершени  обустройства каждого эт жа и набора им необходимой прочности производ т подъем его на проектную отметку шаговым подъемником 5 описанным способом, закрепление этажа на опорных площадках 3  дра 2 жесткости и опускание шагового подъемника 5 на уровень изготовлени  этажей, затем процесс повтор ют необходимое количество циклов,(heating, electricity, ventilation, etc.). After completing the arrangement of each floor and setting the required strength for it, it is lifted to the design mark by a step-lift 5 in the described way, fixing the floor on the support platforms 3 of the rigidity core 2 and lowering the step-lift 5 to the level of floor construction, then the process is repeated the required number of cycles ,

в зависимости от этажности здани .depending on the number of floors of the building.

При возведении здани  при неблагопри тных погодных услови х зону изготовлени  этажей укрывают раздвижным покрытием 11.When the building is erected under adverse weather conditions, the floor manufacturing area is covered with a sliding cover.

Поскольку все работы по устройству этажей выполн ют внизу, то подсоединение готового этажа к коммуникаци м, размещенным в  дре 2 жесткости, производитс  после закреплени  каждого этажа на проектной отметке.Since all the work on the device of the floors is carried out below, the connection of the finished floor to the communications, placed in the core of rigidity 2, is made after fixing each floor to the design mark.

Способ возведени  многоэтажных зданий обеспечивает возможность осуществл ть различную планировку этажей.The method of erection of multi-storey buildings provides the ability to carry out various floor layouts.

Claims (1)

Формула изобретени Invention Formula Способ возведени  многоэтажного здани  путем подъема этажей, включающий устройство фундамента, возведение по крайней мере одного  дра жесткости, изготовление этажей на нулевой или ниже отметках и поочередный подъем их вдоль  дра жесткости на проектную отметку, отличающийс  тем, что, с целью уменьшени  трудоемкости с сокращением монтажногоA method of erecting a multistory building by raising floors, including building a foundation, building at least one stiffener, making floors at zero or below elevations, and alternately lifting them along a stiffener to a design mark, characterized in that, in order to reduce labor intensity with a reduction in installation оборудовани , при возведении  дра жесткости на его наружной поверхности образуют опорные площадки, а после возведени   дра жесткости у его основани  монтируют шаговый подъемник с шарнирно прикреп- ленными к его несущей площадке парнымиequipment, when erecting a stiffener core, on its outer surface form supporting platforms, and after erecting a stiffening core, at its base, a stepper lift is mounted with a pair of hinges attached to its supporting platform выдвижными упорами, при этом изготовление каждого этажа осуществл ют на несущей площадке подъемника, а подъем этажей - путем поочередного переопира- ни  каждого из выдвижных упоров подьемника на опорные площадки  дра жесткости с последующим перемещением подъемника вниз обратным ходом после каждого подъема и закреплени  этажа на соответствующих опорных площадках  дра жесткости.sliding stops, whereby each floor is fabricated on the lift’s supporting platform, and the floors are raised by alternately re-drawing each of the lift’s lift stops on the support platforms of the rigidity core, followed by moving the lift downward after each lift and securing the floor to the corresponding support plots dra stiffness. Фиг.33 JOJO
SU904841768A 1990-06-29 1990-06-29 Method of erecting multustorey building by lifting floors SU1753954A3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904841768A SU1753954A3 (en) 1990-06-29 1990-06-29 Method of erecting multustorey building by lifting floors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904841768A SU1753954A3 (en) 1990-06-29 1990-06-29 Method of erecting multustorey building by lifting floors

Publications (1)

Publication Number Publication Date
SU1753954A3 true SU1753954A3 (en) 1992-08-07

Family

ID=21522317

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904841768A SU1753954A3 (en) 1990-06-29 1990-06-29 Method of erecting multustorey building by lifting floors

Country Status (1)

Country Link
SU (1) SU1753954A3 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Саак н А,О, и др. Возведение зданий и сооружений методом подьема. - М.: Строй- издат, 1982, с. 128. *

Similar Documents

Publication Publication Date Title
US4076778A (en) Climbing formwork
SU1753954A3 (en) Method of erecting multustorey building by lifting floors
CN216616216U (en) Large-scale high-rise steel truss disjunctor structure
CN216787874U (en) Large-scale ring type truss hoisting structure in large-span high altitude
JPH0571225A (en) Temporarily set roof of complete weather type
US4035966A (en) Structure having vertical bearer walls and horizontal ceilings
JPH01256636A (en) Construction method of building
CN217734791U (en) Lifting construction platform for building high-rise building lighting well peripheral formwork system
CN114197633B (en) Construction method of large-span high-altitude annular truss lifting and mounting structure
SU1335661A1 (en) Method and apparatus for constructing a building
SU962549A1 (en) Method of erecting high-rise buildings by the lifting method
RU93010838A (en) METHOD OF CONSTRUCTION OF MONOLITHIC BUILDING AND MOBILE FORMWORK FOR ITS IMPLEMENTATION
JPH10219992A (en) Scaffold device
CN114809579B (en) Erection method of lifting construction platform for erecting formwork system around lighting well
SU1427048A1 (en) Method of constructing tower-type structures of solid concrete
SU1416632A1 (en) Method of erecting buildings with rigidity cores
SU552395A1 (en) The method of construction of high-rise buildings
SU962548A1 (en) Method of erecting high-rise buildings with rigidity core by the method of floor-lifting
SU1747642A1 (en) Method of erecting buildings by hoisting premanufactured storeys
SU1520207A1 (en) Method of erecting a multistorey building
SU1110884A1 (en) Suspended scaffolding
RU1813156C (en) Mobile forms
SU1694822A1 (en) Centering for concreting of floor of multistory building
SU1357517A1 (en) Method of erecting solid-concrete structure
SU1242594A1 (en) Hoistable scaffold for erecting ferroconcrete shells of structures