SU1747642A1 - Method of erecting buildings by hoisting premanufactured storeys - Google Patents
Method of erecting buildings by hoisting premanufactured storeys Download PDFInfo
- Publication number
- SU1747642A1 SU1747642A1 SU904801202A SU4801202A SU1747642A1 SU 1747642 A1 SU1747642 A1 SU 1747642A1 SU 904801202 A SU904801202 A SU 904801202A SU 4801202 A SU4801202 A SU 4801202A SU 1747642 A1 SU1747642 A1 SU 1747642A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- floor
- columns
- building
- foundation
- floors
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Использование: строительство, монтаж зданий и сооружении методом подъема этажей . Сущность изобретени : способ включает устройство фундамента, установку инвентарных колонн с подъемниками, формирование на фундаменте штабел из пакетов этажей в виде плит перекрытий и шар- нирно соединенных с ними стен. Подъем пакетов этажей осуществл ют поочередно, начина с верхнего, с временной фиксацией каждого из них, за исключением нижнего, на инвентарных колоннах на отметках выше проектных. Самый t- ижкий или первый этаж поднимают до прин ти его стенами вертикального положени и опирают стенами на фундамент. Затем осуществл ют поочередт мое переопирание вышележащих этажей, начина со второго, на нижележащие, освобожда инвентарные колонны. После омо- ноличивани шарнирных узлов и всех швов образуют несущие элементы здани (стены), опертые друг на друга и на фундамент. Инвентарные колонны демонтируют, а отверсти под них заделывают бетоном. 3 ил. W ЁUse: construction, installation of buildings and structures by the method of lifting floors. SUMMARY OF THE INVENTION: the method includes the construction of a foundation, the installation of inventory columns with elevators, the formation on the foundation of a stack of floor packages in the form of floor slabs and walls hinged to them. The lifting of packages of floors is carried out alternately, starting from the top, with a temporary fixation of each of them, with the exception of the bottom, on the inventory columns at elevations above the design. The most tiggy or ground floor is raised to its vertical position with its walls and is supported by the walls on the foundation. Then, I rerun my overlying floors, starting from the second, to the lower, empty inventory columns. After the monolithic hinge knots and all seams form the bearing elements of the building (wall), supported on each other and on the foundation. The inventory columns are dismantled, and the holes under them are sealed with concrete. 3 il. W Ё
Description
Изобретение относитс к строительству , в частности к возведению зданий и сооружений методом подъема этажей.The invention relates to the construction, in particular to the erection of buildings and structures by the method of lifting floors.
Наиболее близким к изобретению по технической сущности и достигаемому результату вл етс способ возведени здани методом подъема этажей, включающий устройство фундамента, установку инвентарных колонн с подъемниками, формирование на фундаменте штабел из пакетов этажей в виде плит перекрытий и шарнирно соединенных с ними стен и подъем вдоль колонн пакетов этажей с фиксацией каждого этажа в проектном положении, омоноли- чиванием шарнирных узлов и швов и демонтажем инвентарных колонн.The closest to the invention to the technical essence and the achieved result is a method of erecting a building by the method of lifting floors, including laying the foundation, installing inventory columns with lifts, forming on the foundation a stack of floor panels in the form of floor slabs and walls hinged with them packages of floors with fixation of each floor in the design position, monolithic hinge joints and seams and dismantling of inventory columns.
Недостатком известного способа вл етс сложность возведени многоэтажных зданий и больша грузоподъёмность использованного подъемного оборудовани , а также невозможность получени конструкции монолитного многоэтажного здани без дра жесткости и стационарных колонн.The disadvantage of this method is the complexity of the construction of multi-storey buildings and the large capacity of the used lifting equipment, as well as the impossibility of obtaining the construction of a monolithic multi-storey building without a stiffening core and stationary columns.
Целью изобретени вл етс упрощение возведени с одновременным повышением несущей способности здани , его сейсмостойкости и снижени материалоемкости .The aim of the invention is to simplify the construction with a simultaneous increase in the bearing capacity of the building, its seismic resistance and reduce the consumption of materials.
Эта цель достигаетс тем, что согласно способу возведени здани методом подъема этажей, включающему устройство фундамента , установку инвентарных колонн с подъемниками, формирование на фундаменте штабел из пакетов этажей в виде плит перекрытий и шарнирно соединенных с ними стен и подъем вдоль колонн пакетов этажей с.фиксацией каждого этажа в проектном положении, омоноличиванием гарнир V|This goal is achieved in that according to the method of erection of a building by the method of lifting floors, including the construction of the foundation, the installation of inventory columns with elevators, the formation on the foundation of a stack of floor packages in the form of floor slabs and hinged walls connected to them and fixation of each floor in the design position, with the grouting side dish V |
1Јь ,v| СК1Ј, v | Sc
fefe
ных узлов и швов и демонтажем инвертор- ных колонн, подъем пакетов этажей осуществл ют поочередно, начина с верхнего, с временной фиксацией каждого из них. за исключением нижнего, на инверторных колоннах на отметках выше проектных, а фиксаций нижнего этажа в проектном положении осуществл ют посредством опи- рани его стен на фундамент, после чего осуществл ют поочередное переопирание вышележащих этажей, начина со второго, на нижележащие с освобождением инвентарных колонн и с образованием несущих элементов здани после омоноличивани его шарнирных узлов и швов.knots and seams and dismantling of the inverter columns, lifting the floor packages is carried out alternately, starting from the top, with a temporary fixation of each of them. with the exception of the lower one, on the inverter columns at elevations above the design, and fixings of the lower floor in the design position are carried out by retaining its walls on the foundation, after which they alternately re-draw the upper floors, starting from the second, on the underlying columns with the release of inventory columns and with the formation of the bearing elements of the building after monolithing its hinge nodes and seams.
На фиг, 1 изображен план расположени стен, шарнирно св занных с плитой и плиты перекрыти ; на фиг 2 - разрез А-А на фиг. 1; на фиг. 3 - возведенное здание.Fig. 1 shows the layout of the walls hinged to the slab and the floor slab; FIG. 2 is a section A-A in FIG. one; in fig. 3 - erected building.
Способ осуществл ют следующим образом .The method is carried out as follows.
Сначала выполн ют работы нулевого цикла, устанавливают инвентарные колонны 1 и на спланированной поверхности земли бетонируют пол 2 первого этажа, который одновременно вл етс фундаментом .First, the zero-cycle work is performed, inventory columns 1 are installed, and the floor 2 of the first floor, which is at the same time the foundation, is concreted on the planned ground surface.
На гладкой поверхности отбетониро- ванной плиты пола 2 первого этажа, после нанесени изол ционного сло устанавливают инвентарный шаблон-опалубку дл бетонировани внутренних стен 3 и 4 первого этажа, причем опалубку дл возведени стен 3 в чейках здани через одну ориентируют вдоль продольной оси 0-0 здани , а опалубку дл возведени стен 4 в смежных чейках ориентируют вдоль поперечной оси О -б1 здани . Затем производ т армирование с выпуском U-образных элементов дл формировани шарниров креплени стен 3 и 4 к плитам перекрытий 5, которые будут забетонированы позже. Одновременно с подъемом плиты перекрыти 5, наружные 7 и внутренние 3 и 4 стены принимают свое проектное (вертикальное) положение, поворачива сь вокруг оси шарниров под собственным весом. После этого т ги 9 подъемников 8 пропускают через предварительно выполненные отверсти в плите перекрыти 5 и соедин ют с плитой перекрыти .5 следующего этажа и вновь осуществл ют подъем и временное закрепление этого пакета на колоннах 1 также выше проектного положени . Далее циклы по подъему пакетов этажей повтор ют.After applying the insulating layer, an inventory template-formwork for concreting the inner walls 3 and 4 of the first floor is installed on the smooth surface of the bent floor slab 2, and the formwork for erecting walls 3 in the cells of the building is oriented along one longitudinal axis 0-0 the building, and the formwork for building walls 4 in adjacent cells is oriented along the transverse axis O-b1 of the building. Then reinforcement is made with the release of U-shaped elements to form the hinges for fastening walls 3 and 4 to the floor slabs 5, which will be concreted later. Simultaneously with the lifting of the slab 5, the outer 7 and inner 3 and 4 walls take up their design (vertical) position, turning around the axis of the hinges under their own weight. After that, the pulls 9 of the lifts 8 are passed through the previously made holes in the slab 5 and connected to the slab of the next floor and again lift and temporarily fix this bag on the columns 1 also above the design position. Further, the cycles for lifting the floors of the packages are repeated.
Самый нижний пакет первого этажа поднимают без закреплени их на инвентарных колоннах 1, Фиксацию этого этапа в проектном положении осуществл ют путем опирани его стен 3. 4 и 7 на фундамент, который может быть ленточным, сплошнымThe lowermost package of the first floor is raised without fixing them on the inventory columns 1. The fixation of this stage in the design position is carried out by resting its walls 3. 4 and 7 on the foundation, which can be continuous or continuous
(в качестве последнего может служить пол 2 первого этажа) и т.п.(the floor of the first floor can serve as the last one), etc.
После чего все этажи, начина с 2-го, поочередно опускают до опирани на нижележащие , затем все швы и шарнирные узлыAfter that, all the floors, starting from the 2nd one, are alternately lowered to the anvil on the underlying ones, then all the seams and hinges
омоноличивают, залива бетоном, получа таким образом монолитное сейсмостойкое здание, несущие плоскости которого совпадают с плоскост ми стен.monolithic, the bay of concrete, thus obtaining a monolithic earthquake-resistant building, the bearing planes of which coincide with the planes of the walls.
После затвердевани раствора колонныAfter solidification of the column solution
демонтируют, а отверсти под них в перекрыти х заделывают, устанавлива пробки или залива бетоном.dismantled, and the holes under them in the ceilings are sealed, installing a cork or bay with concrete.
Такое выполнение способа позвол ет снизить материалоемкость здани за счетThis embodiment of the method allows to reduce the material consumption of the building due to
исключени стационарных колонн и дра жесткости: повысить сейсмостойкость здани за счет повышени его жесткости, поскольку жесткость обеспечиваетс выполнением всех стен в пакете несущими;elimination of stationary columns and stiffeners: increase the seismic resistance of the building by increasing its rigidity, since rigidity is ensured by the implementation of all walls in the package carriers;
упростить технологию возведени монолитного многоэтажного здани , повысить безопасность работ.to simplify the construction technology of a monolithic multi-storey building, to increase the safety of work.
Ф о р м у л а и з о б р е т е н и FORUMAWLAH AND ISLANDS
Способ возведени здани методом подъема этажей, включающий устройство фундамента, установку инвентарных колонн с подъемниками, формирование на фундаменте штабел из пакетов этажей вThe method of construction of the building by the method of lifting floors, including the construction of the foundation, the installation of inventory columns with lifts, the formation on the foundation of a stack of packages of floors in
виде плит перекрытий и шарнирно соединенных с ними стен и подъем вдоль колонн пакетов этажей с фиксацией каждого этажа в проектном положении омоноличиванием шарнирных узлов и швов и демонтажем инвентарныхколонн .отличающийс тем, что, с целью упрощени возведени с одновременным повышением несущей способности здани , его сейсмостойкости и снижени материалоемкости, подъем пакетов этажей осуществл ют поочередно, начина с верхнего, с временной фиксацией каждого из них, за исключением нижнего, на инвентарных колоннах на отметках выше проектных, а фиксацию нижнего этажа вthe form of floor slabs and walls hinged with them and the rise along the columns of packages of floors with each floor fixed in the design position by homolithing the hinge joints and seams and dismantling the columns of columns differing in that, in order to simplify the construction while increasing the bearing capacity of the building, its seismic resistance and reduce material consumption, lifting of floor packages is carried out alternately, starting from the top, with a temporary fixation of each of them, with the exception of the bottom, on the inventory columns at elevations above design, and fixing the lower floor in
проектном положении осуществл ют посредством опирани его стен на фундамент, после чего осуществл ют поочередное переопирание вышележащих этажей, начина со второго, на нижележащие с освобождением инвентарных колонн и с образованием несущих элементов здани после омоноли- чивани его шарнирных узлов и швов.the design position is carried out by resting its walls on the foundation, after which alternate re-drawing of the overlying floors begins, starting with the second, on the underlying with the release of inventory columns and with the formation of bearing elements of the building after monolithing its hinges and seams.
II
N4N4
ЪьB
I .:I.:
фиа.ЗFIA.Z
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU904801202A SU1747642A1 (en) | 1990-03-14 | 1990-03-14 | Method of erecting buildings by hoisting premanufactured storeys |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU904801202A SU1747642A1 (en) | 1990-03-14 | 1990-03-14 | Method of erecting buildings by hoisting premanufactured storeys |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1747642A1 true SU1747642A1 (en) | 1992-07-15 |
Family
ID=21501327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU904801202A SU1747642A1 (en) | 1990-03-14 | 1990-03-14 | Method of erecting buildings by hoisting premanufactured storeys |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1747642A1 (en) |
-
1990
- 1990-03-14 SU SU904801202A patent/SU1747642A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР N 1539291,кл. Е 04 G 21/14,1987. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4095380A (en) | Building and elevator module for use therein | |
US3239990A (en) | Multi-storey buildings | |
US3254466A (en) | Method of erecting a multi-story building structure | |
US3462908A (en) | Method for erecting buildings | |
US3738069A (en) | Modular building construction | |
US4557099A (en) | Method of constructing foldable concrete slab buildings with access slots thru ceiling slabs for installing hingeable connectors | |
SU1747642A1 (en) | Method of erecting buildings by hoisting premanufactured storeys | |
US3552080A (en) | Method for erecting multistory buildings | |
RU2598615C1 (en) | Method of reconstruction and vertical extension of buildings | |
CN207988152U (en) | A kind of two-way multiple large span dislocation conjoined structure of quadrangular barrel | |
EP1801301B1 (en) | Method of adding extra floors on a building | |
RU2233953C2 (en) | Method for erecting building frame without girders by means of floor lifting | |
RU2226593C2 (en) | Composite multi-store building frame made of reinforced concrete | |
CN108179815A (en) | A kind of two-way multiple large span dislocation conjoined structure of quadrangular barrel | |
RU2116414C1 (en) | Method for erection of sectional-and-monolithic buildings | |
US20240328154A1 (en) | Primary Shell Structure Consisting of Plane Load-bearing Modules Made of Elements and Assembly Methods | |
RU100117U1 (en) | RECONSTRUCED BUILDING | |
SU1670067A1 (en) | Method of erecting buildings and structures by elevating floors | |
SU1126676A1 (en) | Method for erecting manystoried building by jacking-up floors | |
SU552395A1 (en) | The method of construction of high-rise buildings | |
SU962549A1 (en) | Method of erecting high-rise buildings by the lifting method | |
JP3396600B2 (en) | Seismic reinforcement structure of existing building | |
RU2026941C1 (en) | Method of the building erection by means of hoisting | |
JP2018053486A (en) | Elevator pit, method of constructing elevator pit, and building | |
SU1707166A1 (en) | Method of construction of many-stored building |