SU1724793A1 - Low-head dam - Google Patents
Low-head dam Download PDFInfo
- Publication number
- SU1724793A1 SU1724793A1 SU894781246A SU4781246A SU1724793A1 SU 1724793 A1 SU1724793 A1 SU 1724793A1 SU 894781246 A SU894781246 A SU 894781246A SU 4781246 A SU4781246 A SU 4781246A SU 1724793 A1 SU1724793 A1 SU 1724793A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- river
- dam
- blocks
- flexible
- rings
- Prior art date
Links
Landscapes
- Revetment (AREA)
Abstract
Изобретение относитс к гидротехническому строительству. Цель изобретени повышение надежности и устойчивости работы плотины.Плотина состоит из полых железобе-- тонных блоков-колец 1, заполнени полостей блоков речным балластом 2, не несущих гибких св зей 3 между блоками, гибкого креплени 4 дна реки и отмостки 5. Блоки-кольца укладываютс в несколько р дов в одном уровне. Блоки-кольца креп тс между собой в продольном и поперечном направлени х гибкими не несущими св з ми и соединены со стороны нижнего бьефа с гибким креплением дна реки. Верхний бьеф выполн етс отмосткой с заложением 1:5...1:10. 2 ил.FIELD OF THE INVENTION The invention relates to hydraulic engineering. The purpose of the invention is improving the reliability and stability of the dam. The dam consists of hollow reinforced-ton-block-rings 1, filling the cavities of the blocks with river ballast 2, not carrying flexible connections 3 between the blocks, flexible attachment 4 of the river bottom and blind area 5. Blocks-rings stacked in several rows in the same level. The block-rings are fastened to each other in the longitudinal and transverse directions with flexible non-carrying ties and are connected from the downstream side with flexible attachment of the bottom of the river. The upper reach is made by a blind area with the laying of 1: 5 ... 1:10. 2 Il.
Description
Изобретение относитс к гидротехническому строительству и предназначено дл использовани в качестве низконапорных плотин на небольших водозаборных сооружени х дл обеспечени забора воды при прохождении минимальных расходов по водотоку .The invention relates to a hydraulic engineering construction and is intended for use as low-pressure dams in small water intake structures to ensure water abstraction while passing the minimum flow through the watercourse.
Цель изобретени - повышение надежности и устойчивости работы плотины.The purpose of the invention is to improve the reliability and stability of the dam.
На фиг.1 показана деталь плана по предлагаемой конструкции плотины; на фиг.2 - сечение А-А на фиг.1.Figure 1 shows a detail of the plan for the proposed construction of the dam; figure 2 - section aa in figure 1.
Плотина состоит из полых железобетон- ных блоков-колец 1, заполнени полостей блоков речным балластом 2, не несущих гибких св зей 3 между блоками, гибкого креплени 4 дна реки и отмостки 5.The dam consists of hollow reinforced concrete blocks-rings 1, filling the cavities of the blocks with river ballast 2, not carrying flexible connections 3 between the blocks, flexible attachment of 4 river bottoms and blind area 5.
Плотина работает следующим образом.The dam works as follows.
Из расчета воздействи сдвигающих усилий на сооружение от водного потока (возможно и сел ) определ етс минимальный вес отдельного массива, составл ющего плотину, и подбираютс размеры полого железобетонного блока-кольца 1, отвечающего собственным весом и весом речного балласта 2, заполн ющего полую часть кольца по услови м устойчивости. Исход из требуемых условий создани напорного фронта перед плотиной, подбираетс высота блоков-колец из услови их заглублени на 1/3 собственной высоты. Дл предотвращени возможного лобового воздействи влекомых наносов на элементы блоков-колец 1 с верхнего бьефа на высоту плотины устраиваетс отмостка 5 с заложением 1:5...1:10, что позвол ет пропускать крупные донные наносы через сооружение без его повреждени . При прохождении максимальных расходов по водотоку и переливе через гребень плотины в нижнем бьефе возможны местные размывы, что снижает устойчивость сооружени . Дл улучшени устойчивости сооружени , лучшего сопротивлени элементов блоков-колец 1 сдвигающим усили м, блоки-кольца 1 св зываютс между собой гибкими не несущими св з ми 3 и могут устанавливатьс в несколько р дов в одном уровне.From the calculation of the effect of shear forces on the structure from the water flow (and possibly villages), the minimum weight of an individual array constituting the dam is determined, and the dimensions of the hollow reinforced concrete block-ring 1, corresponding to its own weight and weight of the river ballast 2, are selected under the conditions of stability. Based on the required conditions for creating a pressure front in front of the dam, the height of the block-rings is selected from the condition of their deepening by 1/3 of their own height. To prevent possible frontal impact of the drawn sediments on the elements of the block-rings 1 from the upper reach to the height of the dam, a blind area 5 with a laying of 1: 5 ... 1:10 is arranged, which allows the passage of large bottom sediments through the structure without damaging it. With the passage of maximum costs through the watercourse and overflow through the dam crest in the downstream, local erosion is possible, which reduces the stability of the structure. In order to improve the stability of the structure, better resistance of the elements of the blocks-rings 1 to the shearing forces, the blocks-rings 1 are interconnected by flexible non-carrying links 3 and can be installed in several rows in one level.
В цел х предотвращени вли ни местных размывов на устойчивость сооружени предусматриваетс в нижнем бьефе сооружени гибкое крепление 4 дна реки на глубину возможного размыва.In order to prevent the impact of local erosion on the stability of the structure, a flexible attachment of the 4 bottom of the river to the depth of possible erosion is provided in the downstream of the structure.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894781246A SU1724793A1 (en) | 1989-11-09 | 1989-11-09 | Low-head dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894781246A SU1724793A1 (en) | 1989-11-09 | 1989-11-09 | Low-head dam |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1724793A1 true SU1724793A1 (en) | 1992-04-07 |
Family
ID=21490993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894781246A SU1724793A1 (en) | 1989-11-09 | 1989-11-09 | Low-head dam |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1724793A1 (en) |
-
1989
- 1989-11-09 SU SU894781246A patent/SU1724793A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1413179, кл.Е 02 В 3/02, 1987. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4367978A (en) | Device for preventing beach erosion | |
US5195846A (en) | Spillway for discharging extraordinary floods at dams having at least two flood discharge structures | |
US6443654B1 (en) | Hydraulic energy dissipating offset stepped spillway | |
US5032038A (en) | Overflow spillway for dams, weirs and similar structures | |
CN212533968U (en) | Drop ecological landscape dam | |
CN108978578A (en) | A kind of control method of Highway in front of the mountains and training dyke based on shunting beam flow theory | |
CN213805270U (en) | Prevent that river course from cutting step energy dissipation second grade dam that permeates water of many curved arches that destroys under | |
SU1724793A1 (en) | Low-head dam | |
CN112144488A (en) | Multi-curved arch water-permeable stepped energy dissipation secondary dam capable of preventing river channel undercut from being damaged | |
Tuthill | Structural ice control: Review of existing methods | |
Perham | Ice sheet retention structures | |
RU165292U1 (en) | SELF-LEADING CHANNEL OF COMBINED DESIGN | |
JPH10176316A (en) | River structure | |
CN211547527U (en) | Emergency device of flood bank | |
WO2005035879A1 (en) | Cable stayed dams | |
CN211080094U (en) | Erosion-resistant protection structure of lake beach | |
CN112301946A (en) | High road bed low riverbed water damage prevention and treatment structure | |
RU2212496C2 (en) | Flexible combined cellular reinforcement | |
CN108867571A (en) | Oblique pull dam | |
CN221741186U (en) | Energy dissipation anti-impact device | |
CN216765775U (en) | Ecological weir capable of locally and automatically bursting | |
CN214656816U (en) | Water delivery channel side slope water guide device | |
RU1794127C (en) | Block for erection of hydraulic engineering structure | |
RU2222666C2 (en) | Riverside protecting installation | |
CN217556908U (en) | Rockfill body anchoring structure |