SU1701915A1 - Method of pillar stopping - Google Patents

Method of pillar stopping Download PDF

Info

Publication number
SU1701915A1
SU1701915A1 SU904804492A SU4804492A SU1701915A1 SU 1701915 A1 SU1701915 A1 SU 1701915A1 SU 904804492 A SU904804492 A SU 904804492A SU 4804492 A SU4804492 A SU 4804492A SU 1701915 A1 SU1701915 A1 SU 1701915A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pillars
wells
drilling
rocks
chambers
Prior art date
Application number
SU904804492A
Other languages
Russian (ru)
Inventor
Александр Иванович Борщаговский
Бржан Сайлаубекович Кожамсеитов
Виталий Аркадьевич Филипповский
Original Assignee
Институт Горного Дела Ан Казсср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт Горного Дела Ан Казсср filed Critical Институт Горного Дела Ан Казсср
Priority to SU904804492A priority Critical patent/SU1701915A1/en
Application granted granted Critical
Publication of SU1701915A1 publication Critical patent/SU1701915A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к выемке целиков при разработке сближенных рудных залежей . Цель - снижение себестоимости добычи руды при выемке целиков в верхних и нижних отработанных камерах после разработки сближенных рудных залежей, разделенных породным мостом. Проход т буродоставочные выработки в подстилающих породах. Целики и покрывающие породы разбуривают из буродоставочных выработок. Из верхних камер через породный мост бур т скважины в целики нижних камер и заклинивают в них буровой инструмент . Взрывают интервалы скважин в при- кровельной части целиков. Заполн ют выработанное пространство камер обрушенными породами. Формируют подпорные стенки по бокам целиков рассечкой породного моста между целиками и отрезкой их непосредственно у тела целиков, которые до взрывани  скважин в целиках опускают на почву нижних камер заполнением выработанного пространства обрушенными породами. Затем взрывают скважины в целиках и выпускают отбитую руду в буродоставочные выработки. 2 ил. со СThe invention relates to the excavation of pillars in the development of contiguous ore deposits. The goal is to reduce the cost of ore extraction when excavating pillars in the upper and lower spent chambers after the development of contiguous ore deposits separated by a rock bridge. Passage of stockpiling workings in the underlying rocks. Pillars and overburden rocks are drilled from the drilling and unloading workings. From the upper chambers through the rock bridge, the wells are drilled into the pillars of the lower chambers and the drilling tool is wedged in them. Bore intervals are blown up in the near-roof part of the pillars. The filled chamber space is filled with collapsed rocks. The retaining walls are formed on the sides of the pillars by cutting the rock bridge between the pillars and cutting them directly at the pillar body, which, prior to the blasting of wells in the pillars, are lowered onto the ground of the lower chambers by filling the open space with collapsed rocks. Then the wells are blown up in the pillars and the broken ore is released into the drilling and delivery operations. 2 Il. with C

Description

Изобретение относитс  к горному делу и может быть использовано при разработке сближенных рудных залежей, разделенных породным прослоем.The invention relates to mining and can be used in the development of contiguous ore deposits separated by rock interlayers.

Цель изобретени  - снижение себестоимости добычи руды при выемке целиков в верхних и нижних отработанных камерах после разработки сближенных рудных залежей .The purpose of the invention is to reduce the cost of ore extraction during the excavation of pillars in the upper and lower chambers after the development of contiguous ore deposits.

На фиг. 1 изображена стади  разбури- вани  целиков скважинами и заклинивание в породном мосте и нижних целиках буровой стали; на фиг. 2 - стади  управл емого опускани  породного моста, самообрушение пород кровли, взрывание и выпуск рудной массы на буродостаточный горизонт под защитой боковых подпорных стенок.FIG. Figure 1 shows the stage of drilling pillars with wells and jamming in the rock bridge and lower pillars of drill steel; in fig. 2 - the stage of controlled lowering of the rock bridge, self-destruction of roofing rocks, blasting and release of ore mass to a burodostoyanky horizon under the protection of side retaining walls.

Способ осуществл етс  следующим образом .The method is carried out as follows.

На участке с оставленными между камерными целиками 1 в подстилающих породах проход т буродоставочные выработки 2 и из них обуривают целики 1 восход щими веерами скважин 3, причем центральные скважины 3 вееров бур т с перебуром 0,5-1 м в породы кровли. После завершени  обу- ривани  целиков 1 веерами скважин 3 из верхних отработанных камер 4 через породный мост 5 в тело нижнего целика 1 забуривают и заклинивают буровой инструментIn the area with left between chamber pillars 1, in the underlying rocks, there are burrowing mines 2 and of them pillars 1 are filled with ascending fans of wells 3, and the central wells of 3 fans are drilled with overburden 0.5-1 m in the roof rocks. After the pillars have been completed, 1 well fans 3 from the upper waste chambers 4, through the rock bridge 5, drill the drilling tool into the body of the lower pillar 1

ОABOUT

ю елyou ate

Затем рассекают породный мост 5 с таким расчетом, чтобы отсеченна  консоль породного моста 5 была пропорциональна выемочноймощностинижнего междукамерного целика 1. Одновременно с этим производ т подсечку породного моста непосредственно у тела иелика 1. После проведени  этих операций производ т за- рлжание и взрывание первоначально интервалов скважин 3 в прикровельной части целиков 1 и на участке перебура, вызыва  самообрушение пород 7 кровли и заполнение выработанного пространства камор породой . За счет силы т жести обрушенных пород 7 консоль породного моста 5 спуска- ют в нижние отработанные камеры 8, удержива  закрепленным буровым инструментом 6 концом у верхней части нижнего целика 1. Буровой инструмент 6 выполн ет роль шарнира, а консоли породного мостд 5, опуска сь, закрывают нижний цзлик 1 по всей его высоте, создава  подпорные боковые стенки 8 за пределами фигуры выпуск, которые при выпуске рудной массы предотвращают вовлечение пустой породы, упучшл  показатели извлечени  ру- ды. производ т взрывание вееров скважин 3 в целиках и выпуск отбитой руды 9 ча буродоставочные выработки 2 под защитой подпорных стенок.Then the rock bridge 5 is cut through so that the cut-off console of the rock bridge 5 is proportional to the excavation capacity of the lower chamber pillar 1. At the same time, the rock bridge is cut directly from the body of the helicopter 1. After these operations, the initial intervals of the wells are closed and blasting 3 in the covering part of the pillars 1 and in the area of perebor, causing the roof rocks of the 7th roof to self-destruct and to fill the chamber with a rock. Due to the force of gravity of the crushed rocks 7, the console of the rock bridge 5 is lowered into the lower waste chambers 8, holding the end of the upper part of the lower pillar 1 with the fixed drilling tool 6 and the drilling tool 6 plays the role of a hinge, and , close the lower zlik 1 over its entire height, creating retaining side walls 8 outside the release figure, which, when releasing the ore mass, prevent the gangue from becoming involved, have prevented the extraction of ore. blasting of fans of wells 3 in the pillars and production of broken ore from 9 hours of production of 2 under the protection of retaining walls.

Claims (1)

Формула изобретени  Способ выемки целиков, включающий проведение буродоставочных выработок в подстилающих породах, разбуривание целиков и покрывающих пород из буродоста- вочных( выработок, формирование подпорных стенок по бокам целиков бурением скважин и заклиниванием в них бурового инструмента, взрывание интервалов скважин в прикровельной части целиков, заполнение выработанного пространства камер обрушенными породами, взрывание скважин в целиках и выпуск отбитой руды в буродоставочные выработки под защитой подпорных стенок, отличающийс  тем, что, с целью снижени  себестоимости добычи руды при выемке целиков в верхних и ни.кних отработанных камерах после разработки сближенных рудных залежей, разделенных породным мостом, бурение скважин и заклинивание бурового инструмента осуществл ют из верхних камер через породный мост в целики нижних камер, затем формируют подпорные стенки рассечкой породн.ого моста между целиками и отрезкой их непосредственно у тела цели- ксв, которые до взрывани  скважин в целиках опускают на почву нижних камер запопнением выработанного пространства обсушенными породами.Claims method of excavation of the pillars, including carrying out drilling and unloading workings in the underlying rocks, drilling the pillars and covering rocks from the borehole spraying (workings, forming retaining walls on the sides of the pillars by drilling wells and jamming drilling tools in them, blasting intervals of the wells in the roof covering of the wells, filling depleted chamber space by collapsed rocks, blasting of holes in the pillars and the release of broken ore into shale excavations under the protection of retaining walls, from Understanding that, in order to reduce the cost of ore mining when excavating pillars in the upper and lower ante chambers, after the development of contiguous ore deposits separated by a rock bridge, the drilling of wells and the jamming of the drilling tool are carried out from the upper chambers through the rock bridge into the lower chambers of the lower chambers Then, retaining walls are formed by cutting the rock bridge between the pillars and cutting them directly at the cel-valve body, which are lowered onto the ground of the lower chambers prior to the blasting of wells in the pillars th space obshennymi rocks. JJ Щие.1SchI.1 Шиг. IShig. I
SU904804492A 1990-03-20 1990-03-20 Method of pillar stopping SU1701915A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904804492A SU1701915A1 (en) 1990-03-20 1990-03-20 Method of pillar stopping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904804492A SU1701915A1 (en) 1990-03-20 1990-03-20 Method of pillar stopping

Publications (1)

Publication Number Publication Date
SU1701915A1 true SU1701915A1 (en) 1991-12-30

Family

ID=21503030

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904804492A SU1701915A1 (en) 1990-03-20 1990-03-20 Method of pillar stopping

Country Status (1)

Country Link
SU (1) SU1701915A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1398521, кл. Е21 С 41/16, 1986. Авторское свидетельство СССР ISfe 1048118. кл. Е21 С 41/16, 1982. *

Similar Documents

Publication Publication Date Title
CN1982649A (en) Mining method
CN111042818B (en) Mining method of tungsten ore body with unstable surrounding rock and steeply inclined thin ore vein
US3917346A (en) Method of blasting a subterranean deposit
CN109236320A (en) A kind of underground chamber construction method
US4135450A (en) Method of underground mining
SU1701915A1 (en) Method of pillar stopping
RU2757619C1 (en) Method for developing low-powered steel ore bodies
Okubo et al. Underground mining methods and equipment
SU1532705A1 (en) Method of mining mineral deposits
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
RU2187646C2 (en) Method of opencast mining of beded mineral deposits
RU2138639C1 (en) Method for development of thick steep-dipping coal seams
RU2151293C1 (en) Method of difficult-to-cave roof control in mining of coal seams by powered mining set
RU2213221C1 (en) Method of mineral mining
RU2094612C1 (en) Method for opening steep thin ore deposits
RU2107165C1 (en) Method of bore-hole hydraulic recovery of minerals
RU2192544C2 (en) Method of rocks working in opencast reconstruction
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
RU2755287C1 (en) Method for developing thin and low-powered steel-falling ore bodies
CN113653491B (en) Underground rock burst prevention and control method for coal seam group
RU2471989C1 (en) Method to manage hard-to-collapse roof when mining gas-bearing beds in long faces with mechanical complexes
SU1461930A1 (en) Method of combined mining of mineral deposits
SU1372045A1 (en) Method of recovering materials from thick underground formations
RU1828921C (en) Method for working pillars in room-and-pillar mining system
SU1344906A1 (en) Method of driving reserved-dome mine workings