SU1696701A1 - Method of mining flat seams - Google Patents

Method of mining flat seams Download PDF

Info

Publication number
SU1696701A1
SU1696701A1 SU884603075A SU4603075A SU1696701A1 SU 1696701 A1 SU1696701 A1 SU 1696701A1 SU 884603075 A SU884603075 A SU 884603075A SU 4603075 A SU4603075 A SU 4603075A SU 1696701 A1 SU1696701 A1 SU 1696701A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pillars
combine
formation
excavation
group
Prior art date
Application number
SU884603075A
Other languages
Russian (ru)
Inventor
Владимир Анатольевич Бабиков
Владимир Яковлевич Ковтун
Борис Федорович Панасюк
Вячеслав Сергеевич Полошкин
Original Assignee
Горный институт Уральского отделения АН СССР
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Горный институт Уральского отделения АН СССР filed Critical Горный институт Уральского отделения АН СССР
Priority to SU884603075A priority Critical patent/SU1696701A1/en
Application granted granted Critical
Publication of SU1696701A1 publication Critical patent/SU1696701A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Изобретение относитс  к разработке пластов с неустойчивой кровлей комбайнами . Цель - снижение технологических потерь полезного ископаемого при проведении комбайновых ходов в группе не менее четырех. Проход т выемочные и панельные штреки с формированием междуштрековых целиков, нарезают заездные просеки с формированием околоштрековых целиков, выемку полезного ископаемого осуществл ют камерами комбайновыми ходами с оформлением междукамерных целиков , проведение комбайновых ходов производ т группами из одного заездного просека. После выемки каждой группы комбайновых ходов параллельно заездному просеку проход т разрезную выработку до пересечени  с проектным контуром комбайнового хода в следующей смежной группе. Заездные просеки нарезают под углом к выемочному штреку, определ емому по расчетной формуле. Кроме того, осуществл ют формирование уменьшенных целиков несущей способностью, равной несущей способности междукамерных целиков, частичной отработкой междуштрекового целика, которую чередуют с нарезкой заездных просеков и разрезных выработок. 1 з.п, ф-лы, 1 ил.The invention relates to the development of layers with unstable roofing combines. The goal is to reduce the technological losses of the mineral during the combine moves in a group of at least four. Excavation and panel drifts with the formation of inter-track pillars pass, incision slopes are cut to form obshtrachtkovki pillars, mineral extraction is carried out by combining passages with inter-chamber pillars; After the excavation of each group of combine moves, a split production is carried out parallel to the drive clearing to the intersection with the design contour of the combine move in the next adjacent group. The driveways are cut at an angle to the excavation drift, which is determined by the calculation formula. In addition, the formation of reduced pillars with a carrying capacity equal to the carrying capacity of interchamber pillars, partial refinement of the intertrip track pillar, which alternate with cutting of driveways and cutting openings, is carried out. 1 z.p, f-ly, 1 ill.

Description

Изобретение относитс  к горной промышленности и может быть использовано при камерной системе разработки пологих пластов, преимущественно с неустойчивой кровлей, отрабатываемых, например, комплексами с комбайнами фронтального действи .The invention relates to the mining industry and can be used with a chamber system for developing flat seams, mainly with an unstable roof, worked out, for example, with complexes with frontal combines.

Цель изобретени  - снижение технологических потерь полезного ископаемого при проведении комбайновых ходов в группе не менее трех.The purpose of the invention is to reduce the technological losses of minerals when conducting combine moves in a group of at least three.

На чертеже показана часть отрабатываемой панели, вид сверху.The drawing shows a portion of the panel being worked, top view.

Способ осуществл ют следующим образом .The method is carried out as follows.

Проход т выемочные и панельные штреки с формированием междуштрековых целиков. Нарезают заездные просеки (. Выемку запасов панели ведут, например , камерами с оформлением междукамерных целиков по п ть комбайновых ходов в группе, прводимых из одного заездного просека 2, который про/ход т под Digging and panel drifts pass with the formation of inter-track pillars. The driveways are cut (. The panel is dredged, for example, by cameras with inter-chamber pillars in five combine moves in a group made from one driveway 2, which is under / under

углом « arcsin m /д , в к выемочному штреку 3, где п - количество разрезных выработок в околоштрековом целике; m - количество комбайновых ходов в камере; А,э - соответственно ширина комбайнового хода и разрезной выработки; В,Ь -соответственно ширина междукамерного целика иangle “arcsin m / d, in to the excavation drift 3, where n is the number of split openings in the near-trail rear sight; m is the number of combine moves in the chamber; A, e - respectively, the width of the combine course and split production; B, L - respectively, the width of the inter-chamber pillar and

ОABOUT

юYu

ONON

33

частей разрезанного околоштрекового целика .parts of the cut around the rear pillar.

Добычу ведут комбайнами 4 с доставкой руды самоходными.вагонами 5 через выемочный штрек 3 на конвейерный штрек 6 к рудоспускам 7. После выемки каждой группы комбайновых1 ходов в пределах проектного контура следующего околоштрекового целика 8 до пересечени  с контуром комбайнового хода в следующей смежной группе параллельно заездному просеку проход т две разрезные выработки 9,The mining operations are carried out by combines 4 with delivery of ore by self-propelled wagons 5 through excavation drift 3 to conveyor drift 6 to the ore passes 7. After each group of combine harvesters moves within the design contour of the next near-sight rear sight 8, it crosses the contour of the combine progress in the next adjacent group parallel to the driving prospect two cutting openings 9 are made,

Таким образом, при отработке первого комбайнового хода следующей камеры околоштрековый целик 8 получаетс  разделен выработками 9 на три части, причем ширина каждой из них (по широкой части) равна ширине междукамерного целика 10с эквивалентной несущей способностью этого целика. По окончании отработки каждой камеры или проведени  разрезной выработки комбайн отвод т на выемочный штрек и частично отрабатывают междуштрековый целик 11 на длину, равную рассто нию между заездным просеком и смежной разрезной выработкой , При такой работе комбайна, когда на- резку заездных просеков, отработку камер и проходку разрезных выработок чередуют с частичной выемкой междуштрекового целика на вышеуказанную длину, забой выработки по междуштрековому целику не попадает в зону опорного давлени , что повышает устойчивость выемочного штрека. Кроме того, исключаютс  какие-либо дополнительные маневровые операции комбайна. Оставшуюс  часть междуштрековогй целика формируют с несущей способностью, равной несущей способности междукамерных целиков.Thus, during the development of the first combine stroke of the next chamber, the near-rifle sight 8 is divided into openings 9 into three parts, and the width of each of them (on the wide part) is equal to the width of the inter-chamber sight 10c with the equivalent carrying capacity of this part. Upon completion of working out each chamber or conducting a split development, the combine is retracted to the excavation drift and partly working out the middle track rear sight 11 for a length equal to the distance between the drive clearance and the adjacent split output. In such a combine, when cutting drive tracks, working out the chambers and the excavation of the split workings alternate with a partial excavation of the inter-track pillar to the aforementioned length; the bottom of the excavation along the inter-track track does not fall into the reference pressure zone, which increases the stability of the excavation new roadway. In addition, any additional shunting operations of the combine are excluded. The remainder of the interdisciplinary pillar is formed with a bearing capacity equal to the carrying capacity of interchamber pillars.

Claims (2)

Формула изобретени  1. Способ разработки пологих пластов, включающий проведение выемочных панельных штреков с формированием междуштрековых целиков, нарезку заездных просеков с формированием околоштрековых целиков, очистную выемку полезного ископаемого камерами комбайновыми ходами сClaim 1. Method of developing flat seams, including carrying out excavation panel drifts with the formation of intertrib track pillars, cutting of drive gaps with the formation of near-track pillars, clearing the minerals from the cameras with combine moves with оформлением междукамерных целиков, проведение комбайновых ходов группами из одного заездного просека и частичную. отработку целиков с формированием системы уменьшенных целиков с несущейthe design of interchamber pillars, the combination of one passing driveway and partial. working out the pillars with the formation of a system of reduced pillars with a carrier способностью, равной несущей способности междукамерных целиков, отличающийс  тем, что, с целью снижени  технологических потерь полезного ископаемого при проведении комбайновых ходов вability equal to the carrying capacity of interchamber pillars, characterized in that, in order to reduce the technological losses of the mineral during the combine moves in группе не менее четырех, после выемки каждой группы комбайновых ходов параллельно заездному просеку проход т разрезную выработку (выработки) до пересечени  с проектным контуром комбайнового хода вa group of at least four, after each group of combine moves is excavated, a split production (development) is carried out parallel to the drive clearing until it intersects with the design contour of the combine stroke in следующей смежной группе, при этом заез- дные просеки нарезают под углом а к выемочному штреку, определ емому из выражени :next contiguous group, in this case the regular glades are cut at an angle a to the excavation drift, determined from the expression: g-3rccin(n + 1)(a + b)g-3rccin (n + 1) (a + b) а arcsm m(A + B) and arcsm m (A + B) где п - количество разрезных выработок в околоштрековом целике;where p is the number of split workings in the near-frame sight; m - количество комбайновых ходов в камере;m is the number of combine moves in the chamber; А и а - соответственно ширина комбайнового хода и разрезной выработки;And and a - respectively, the width of the combine course and split production; В и b - соответственно ширина междукамерных и разрезанных частей около- штрековых целиков.B and b are, respectively, the width of interchamber and cut parts of near-drift pillars. 2. Способ по п.1,отличающийс  тем, что формирование уменьшенных целиков с несущей способностью, равной несущей способности междукамерных целиков. осуществл ют частичной отработкой междуштрекового целика, которую чередуют с нарезкой заездных просеков и разрезных выработок.2. The method according to claim 1, characterized in that the formation of reduced pillars with a carrying capacity equal to the carrying capacity of interchamber pillars. Carry out a partial development of the middle track pillar, which alternate with cutting of drive gaps and split openings. ww
SU884603075A 1988-11-09 1988-11-09 Method of mining flat seams SU1696701A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884603075A SU1696701A1 (en) 1988-11-09 1988-11-09 Method of mining flat seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884603075A SU1696701A1 (en) 1988-11-09 1988-11-09 Method of mining flat seams

Publications (1)

Publication Number Publication Date
SU1696701A1 true SU1696701A1 (en) 1991-12-07

Family

ID=21408359

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884603075A SU1696701A1 (en) 1988-11-09 1988-11-09 Method of mining flat seams

Country Status (1)

Country Link
SU (1) SU1696701A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2442895C1 (en) * 2010-05-31 2012-02-20 Учреждение Российской академии наук Институт угля и углехимии Сибирского отделения РАН (ИУУ СО РАН) Method for development of thick flat coal seam with stable top

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Перм ков Р.С. и др. Технологи добычи солей. - М.: Недра, 1981, с.120-123. Авторское свидетельство СССР Мг 1234628. кл. Е 21 С 41/16, 1984. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2442895C1 (en) * 2010-05-31 2012-02-20 Учреждение Российской академии наук Институт угля и углехимии Сибирского отделения РАН (ИУУ СО РАН) Method for development of thick flat coal seam with stable top

Similar Documents

Publication Publication Date Title
CN109252860A (en) A kind of girdle continuous milling machine high mechanization recovery method
US4799738A (en) Mining method for working large-scale mineral deposits by the caving system
SU1696701A1 (en) Method of mining flat seams
US2778622A (en) Mining method providing for continuous progression of mining machinery
RU2123109C1 (en) Method for mining of coal series in marginal zones of opencast
SU1756567A1 (en) Method for mineral opencast mining
SU1675557A1 (en) Method for opencast mining of minerals
CN111022054A (en) Adjacent equidirectional asynchronous mining open pit and mining method thereof
CA1220231A (en) Method of exposing minerals in open-cut mining
SU827789A1 (en) Method of working thick sloping coal seams
SU1011861A1 (en) Method of working rich deposits of minerals
RU2017961C1 (en) Method for mining of mineral gently sloping beds
SU1726768A1 (en) Method of working horizontal and low-dip mineral bed deposits
RU2052118C1 (en) Method for opencast mining of horizontal and gently sloping mineral beds
SU785488A1 (en) Method of mining minerals in the contour-adjoining areas of a quarry
SU1458574A1 (en) Method of mining ore bodies
RU1810542C (en) Method for mining of flat and inclined mineral beds
SU912933A1 (en) Method of strip mining of deposits of complex structure
SU732532A1 (en) Method for mining gently sloping mineral seams
SU825953A1 (en) Method of open working of mountaineous mineral deposits
SU848645A1 (en) Method of working adjacent gentry-sloping beds
SU1578335A1 (en) Method of mining seams of useful mineral with poorly caving roof
SU1730452A1 (en) Method of mineral opencast mining
SU1705574A1 (en) Method of opencast mining of steep deposits
SU1134716A1 (en) Method of mining gently-sloping coal seams