SU1687785A1 - A method of preparing flooded rock for mining - Google Patents

A method of preparing flooded rock for mining Download PDF

Info

Publication number
SU1687785A1
SU1687785A1 SU884611036A SU4611036A SU1687785A1 SU 1687785 A1 SU1687785 A1 SU 1687785A1 SU 884611036 A SU884611036 A SU 884611036A SU 4611036 A SU4611036 A SU 4611036A SU 1687785 A1 SU1687785 A1 SU 1687785A1
Authority
SU
USSR - Soviet Union
Prior art keywords
wells
explosive
drilling
horizontal
ledge
Prior art date
Application number
SU884611036A
Other languages
Russian (ru)
Inventor
Николай Николаевич Беляков
Александр Павлович Кононов
Александр Глебович Нецветаев
Original Assignee
Институт горного дела им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела им.А.А.Скочинского filed Critical Институт горного дела им.А.А.Скочинского
Priority to SU884611036A priority Critical patent/SU1687785A1/en
Application granted granted Critical
Publication of SU1687785A1 publication Critical patent/SU1687785A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горной промети . Цель - повышение эффективности проведени  буровзрывных работ за счет уменьшени  обводненности взрываемого массива. Осуществл ют бурение р дов горизонтальных дренажных скважин в откосе нижележащего уступа на всю ширину подготавливаемого уступа. Вертикальные взрывные скважины бур т поперечными р дами. Каждый поперечный р д скважин располо- гают в одной плоскости с горизонтальной дренажной сква-жиной, после чего зар жают и взрывают вертикальные взрывные скважины, экскавируют и транспортируют взорванные горные породы на транспортной площадке уступа. Дл  исключени  действи  грунтовых вод во взрывном массиве, что позволило бы заменить дорогосто щие водоустойчивые взрывные вещества значительно более дешевыми неводоустойчивыми , предварительно осушают взрывной блок. Кол-во скважин определ етс  уровнем грунтовых вод в осушаемом массиве. Интенсивность дренажа может быть увеличена путем бурени  дополнительного кол-ва горизонтальных скважин 1. ил. соThis invention relates to mining promet. The goal is to increase the efficiency of drilling and blasting operations by reducing the water content of the exploded array. A series of horizontal drainage wells is drilled in the slope of the underlying ledge over the full width of the prepared step. Vertical blastholes are drilled in transverse rows. Each transverse row of wells is located in the same plane as the horizontal drainage well, after which vertical explosive wells are charged and blown up, excavated and transported blasted rocks on the scarp transport platform. To eliminate the effect of groundwater in an explosive array, which would allow replacing expensive waterproof explosives with much cheaper non-resistant materials, they pre-dry the explosive block. The number of wells is determined by the groundwater level in the drained massif. The intensity of the drainage can be increased by drilling an additional number of horizontal wells 1. Il. with

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке обводненных пород.The invention relates to the mining industry and can be used in the development of watered rocks.

Цель изобретени  - повышение эффективности подготовки к буровзрывным работам за счет уменьшени  обводненности взрываемого массива.The purpose of the invention is to increase the efficiency of preparation for drilling and blasting operations by reducing the water content of the exploding array.

Способ осуществл етс  следующим образом .The method is carried out as follows.

Уступы 1,нарезанные в массиве обводненных горных пород, отрабатываютс  последовательно сверху вниз взрывными блоками 2. Скальные обводненные горныеThe ledges 1, cut into an array of flooded rocks, are worked out successively from top to bottom by explosive blocks 2. Rocky flooded mountain

породы составл ют значительную долю горных пород, отрабатываемых открытым способом. В св зи с увеличением глубины карьеров их дол  посто нно возрастает. Обу ивание взрывного блока 2 осуществл ют продольными 3 и поперечными 4 р дами скважин согласно намеченной сетке взрывных скважин, параметры которой устанавливаютс  на основе предварительного расчета. Взрывные скважины проход т сверху вниз с верхней площадки разрабатываемого уступа. После этого зар жают и взрывают вертикальные взрывные скважиоrocks constitute a significant proportion of the rocks being mined by the open method. In connection with the increase in the depth of the quarries, their long-term growth is constantly increasing. The training of the explosive unit 2 is carried out by longitudinal 3 and transverse 4 rows of wells according to the intended grid of explosive wells, the parameters of which are established on the basis of a preliminary calculation. Explosive wells pass from the top down from the top of the ledge under development. After that, the vertical explosive wells are charged and blown up.

00 vj XI 0000 vj XI 00

елate

мы. экскар.ируюг и транспортируют ппор ванные горные породы по транспортной площадке уступа. С целью исключени  действи  грунтовых вод во взрываемом массиве , что позволило бы заменить дорогосто щие водоустойчивые взрывчатые вещества значительно более дешевыми неводоустойчивыми предварительно осушают взрывной блок2. Дл  этого обуривают нижележащий уступ 5 со стороны его откоса 6. Обуривание осуществл етс  горизонтальными скважинами 7 в один р д 8 парэ- лельного нижней бровке откоса нижнего уступа 9 выше уровн  его нижней площадки 10. Обуривание нижележащего уступа про- извод т перед проведением с верхней площаки разрабатываемого уступа вертикальных скважин. Горизонтальные скважины служат дл  осуществлени  водоотвода из массива отрабатываемых горных пород. Через гори- зонтальные скважины грунтовые воды вытекают на нижнюю площадку нижележащего уступа, при этом образуетс  депрессионна  воронка, захватывающа  разрабатывамый блок. Дл  того, чтобы наиболее эффективно использовать сеть горизонтальных скважин , горизонтальные скважины проход т в границах вертикальной проекции взрывного блока 2 на нижележащий горизонт 5. Каждый р д поперечных вертикальных скважин 4, проводимых с верхней площадке уступа в границах взрывного блока, располагают с совмещением в одной плоскости (вертикальной ) с горизонтальной скважиной 7. Это обеспечивает наиболее выгодное рас- положение взрывного блока 2 относительно депрессионной воронки, образующейс we. Excar.yug and transport ppor bath rocks on the transport platform of the ledge. In order to eliminate the effect of groundwater in the exploding massif, which would make it possible to replace expensive waterproof explosives with much cheaper non-resistant pre-dried explosive unit2. For this purpose, the lower ledge 5 is loaded from the side of its slope 6. The drilling is carried out by horizontal wells 7 in one row 8 of the parallel side lower edge of the slope of the lower ledge 9 above the level of its lower platform 10. The smoking of the lower ledge is carried out before carrying out plots of the developed ledge of vertical wells. Horizontal wells serve to drain water from the rock mass produced. Through horizontal wells, groundwater flows into the lower platform of the underlying ledge, and a depression funnel forms, which captures the development block. In order to make the most efficient use of a network of horizontal wells, horizontal wells are located within the boundaries of the vertical projection of the explosive block 2 onto the underlying horizon 5. Each row of transverse vertical wells 4, which are led from the top of the ledge within the boundaries of the explosive block, planes (vertical) with a horizontal well 7. This provides the most advantageous location of the explosive block 2 relative to the depression funnel formed

нлд р дом горизонтгнп.ных г.м лжии 8, кроме того, оптимизируетс  расположение поперечных рчдон взрывных скпажин 4 относительно депросионных поронок каждой соответствующей горизонтальной скважины 7. Расположение горизонтальных скважин 7 на нижележащем уступе вызвано необходимостью создани  депресионной воронки, полностью захватывающей все взрывные скважины отрабатываемого блока 2 на их полную длину.In addition, the layout of cross-sectional rhdon blasting cleats 4 relative to the deprotection porons of each corresponding horizontal well 7 is optimized. The location of horizontal wells 7 on the lower ledge is caused by the need to create a depression funnel that completely captures all the explosive wells worked out block 2 at their full length.

Количество скважин определ етс  уровнем грунтовых вод в осушаемом массиве (чем он ниже, тем скважин меньше). Интенсивность дренажа может быть увеличена путем бурени  дополнительного количества горизонтальных скважин.The number of wells is determined by the level of groundwater in the dry massif (the lower it is, the smaller the number of wells). The intensity of drainage can be increased by drilling an additional number of horizontal wells.

Claims (1)

Формула изобретени Invention Formula Способ подготовки обводненных горных пород к разработке, включающий бурение р дов горизонтальных дренажных скважин в откосе уступа и вертикальных взрывных скважин г, верхней площадки уступа и отвод воды, отличающийс  тем, что, с целью повышени  эффективности проведени  буровзрывных работ за счет уменьшени  обводненности взрываемого массива, горизонтальные дренажные скважины бур т в откосе нижележащего уступа на всю ширину подготавливаемого уступа, а буренио вертикальных взрывных скважин осуществл ют поперечными р дами, причем каждый поперечный р дскважин располагают в одной плоскости с горизонтальной дренажной скпажиной.A method of preparing flooded rocks for development, including drilling a series of horizontal drainage wells in the escarpment slope and vertical blastholes r, the upper platform of the ledge and draining water, characterized in that, in order to increase the efficiency of drilling and blasting operations by reducing the water content of the exploded array, horizontal drainage wells are drilled in the slope of the underlying ledge for the entire width of the prepared ledge, and drilling of vertical blastholes are carried out in transverse rows, and Each transverse wellbore row is positioned in the same plane as the horizontal drain bar.
SU884611036A 1988-11-30 1988-11-30 A method of preparing flooded rock for mining SU1687785A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884611036A SU1687785A1 (en) 1988-11-30 1988-11-30 A method of preparing flooded rock for mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884611036A SU1687785A1 (en) 1988-11-30 1988-11-30 A method of preparing flooded rock for mining

Publications (1)

Publication Number Publication Date
SU1687785A1 true SU1687785A1 (en) 1991-10-30

Family

ID=21411861

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884611036A SU1687785A1 (en) 1988-11-30 1988-11-30 A method of preparing flooded rock for mining

Country Status (1)

Country Link
SU (1) SU1687785A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2452859C1 (en) * 2010-10-26 2012-06-10 Виктор Сергеевич Федотенко Drying method of block to be exploded during direct coal extraction technology
RU2465405C2 (en) * 2010-10-07 2012-10-27 Ирина Юрьевна Мачехина Drainage method of open pit edges by means of systems of combined drainage devices
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Резников Л.М.Совершенствование буровзрывных работ на разрезах Кузбасса.- Уголь, 1985, Ms 1, с.23. Авторское свидетельство СССР № 1241731, кл. Е02 D 19/00, Е21 С 41/00, 1984. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465405C2 (en) * 2010-10-07 2012-10-27 Ирина Юрьевна Мачехина Drainage method of open pit edges by means of systems of combined drainage devices
RU2452859C1 (en) * 2010-10-26 2012-06-10 Виктор Сергеевич Федотенко Drying method of block to be exploded during direct coal extraction technology
CN106988746A (en) * 2017-05-04 2017-07-28 云南华联锌铟股份有限公司 A kind of outdoor mining methods that become more meticulous of slight slope and thin ore body

Similar Documents

Publication Publication Date Title
SU1687785A1 (en) A method of preparing flooded rock for mining
RU2044998C1 (en) Method for rock blasting in open pit
SU1077591A1 (en) Method of recultivation of slopes
SU934009A1 (en) Method of working thick gently-sloping ore deposits
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
SU867106A1 (en) Method for working benches
SU968356A1 (en) Method of preparing ore to subterranean leaching
SU1481406A1 (en) Method of mining thick steep mineral deposits
SU1120749A1 (en) Method of underground leaching of minerals
RU2081324C1 (en) Method for hydraulic bore-hole mining of minerals
RU2685722C1 (en) Method of water reduction at explosive preparation to extraction of watered massif
RU2118459C1 (en) Method for burying toxic waste in mine workings
SU1576626A1 (en) Method of errecting dam by explosion for caving
SU1461930A1 (en) Method of combined mining of mineral deposits
SU1680987A1 (en) Method for exposing and preparing gently sloping coal seams
SU1461931A1 (en) Method of mining a field of sloping coal seams extending under alluvia
SU1089261A1 (en) Open-cast mining method
SU1687782A1 (en) A method of extracting natural soil
SU1129354A1 (en) Method of underground working of mineral deposits
SU1615366A1 (en) Method of controlling the process of rock shift under protected objects
RU2454541C1 (en) Drying method of rock-coal massif
SU1239335A1 (en) Method of working mineral deposits
SU898069A1 (en) Method of opening-up and preparing the mine field of gently sloping coal beds
SU1162988A1 (en) Method of relieving amine working
Kucharska et al. Evolution of the hydrographic network in the middle Wieprz River Basin (E Poland)