SU1677309A1 - Method of combination mining of steep ore bodies - Google Patents

Method of combination mining of steep ore bodies Download PDF

Info

Publication number
SU1677309A1
SU1677309A1 SU874315126A SU4315126A SU1677309A1 SU 1677309 A1 SU1677309 A1 SU 1677309A1 SU 874315126 A SU874315126 A SU 874315126A SU 4315126 A SU4315126 A SU 4315126A SU 1677309 A1 SU1677309 A1 SU 1677309A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
mining
ore bodies
open
section
Prior art date
Application number
SU874315126A
Other languages
Russian (ru)
Inventor
Шаукат Алтаевич Алтаев
Талгат Максумович Мухтаров
Данке Чонжибаевич Тышканбаев
Абылгазы Даутович Бектыбаев
Гульнара Мейрамовна Юсупова
Original Assignee
Институт Горного Дела Ан Казсср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт Горного Дела Ан Казсср filed Critical Институт Горного Дела Ан Казсср
Priority to SU874315126A priority Critical patent/SU1677309A1/en
Application granted granted Critical
Publication of SU1677309A1 publication Critical patent/SU1677309A1/en

Links

Description

дл  образовани  системы трещин 6 в качестве подушки из отбитой руды. На разрыхленной почве размещают по всей площади подземного участка на дне карьера первой очереди гибкое раздел ющее перекрытие 5, один конец которого заглубл ют в отрезную щель 7, пройденную к этому времени в горце второго участка, удаленном от открытых горных работ. Длина отрезной щели 7 равна мощности рудного тела 2. После монтажа гибкого перекрыти  5 вскрышные породы 4 при добыче на участке I складируют во внутренний отвал 8, образованный на гибком перекрытии 5, одновременно при этом подготавливают к добычным работам участок II. Рудный массив 9 участка И, наход щегос  под гибким раздел ющим перекрытием 5, разделен на два подэтажа 10 и 11.to form a crack system 6 as a pad of broken ore. In the loosened soil, a flexible dividing overlap 5 is placed over the entire area of the underground section at the bottom of the open pit, one end of which is buried in the cutting slot 7, which by this time passed in the mountaineer of the second section remote from the open-pit mining. The length of the cutting gap 7 is equal to the thickness of the ore body 2. After installation of the flexible overlap 5, the overburden 4 during mining at section I is stored in an internal blade 8 formed on flexible overlap 5, and at the same time section II is prepared for mining. The ore massif of the section I, located under the flexible dividing overlap 5, is divided into two sub-floors 10 and 11.

Верхний подэтаж 10 рудного массива 9, участка II. наход щегос  под гибким разде- л ющим перекрытием 5, с любой высотой отбивают с опережением по отношению к нижележащему подэтажу 11. Дл  этого на уровне нижележащего подэтажа 11 проход т буровые выработки 12, Затем образуют буровые камеры 13, откуда бур т и взрывают комплект веерных скважин 14. Попутную добычу при проходке буровых выработок 12 и буровых камер 13 доставл ют через орт 15 в восстающий 16, пройденный на контакте рудного тела 2 и боковых пород 17. Из восстающего 16 руду транспортируют далее по квершлагу 18, пройденному на горизонте 19, откуда выдают ее на поверхность по стволу 20.Upper level 10 ore massif 9, section II. located under a flexible partitioning overlap 5, with any height they are beaten out ahead of the underlying sub-floor 11. For this, drilling workings 12 are held at the level of the sub-floor 11, then drill chambers 13 are formed, from where the set of fan holes is blown and blown up wells 14. Associated mining, when penetrating drilling workings 12 and drilling chambers 13, is delivered through stage 15 to rising 16, passed through the contact of ore body 2 and lateral rocks 17. From rising 16, ore is transported further along square 18, passed through horizon 19, give it to the surface of the trunk 20.

Отбита  руда 21 верхнего подэтажа 10 магазинируетс  и постепенно выпускаетс The ore 21 of the upper sub-floor 10 is repaired and is gradually mined.

вомстно с отбитой рудой 22 нижележащего подэтажа 11.In addition, with broken ore 22 of the underlying sub-floor 11.

Нижележащий подэтаж 11 высотой 5-7 м в зависимости от прочности целика отбивают секционно веерными скважинами.23, пробуренными из доставочных выработок 24, между собой параллельно пройденных на горизонте 19.The underlying subsurface 11, 5–7 m high, depending on the strength of the pillar, is beaten off by sectional fan-like boreholes. 23 drilled from the delivery workings 24, parallel to each other, passed on horizon 19.

При достижении горизонта 19 опережающей разработанной открытыми работами выемки (участок I) отбитую руду 21 с верхнего и нижележащего подэтажа 10 и 11 выдают по выработкам 24 на дно 25 выработанного открытыми горными работами пространства.When reaching the horizon 19 ahead of the excavation developed by the open works (section I), the broken ore 21 from the upper and lower sub-floors 10 and 11 is discharged in openings 24 to the bottom 25 of the space developed by open-pit mining.

В последней стадии отработки рудного массива 9 при отступающем пор дке от отрезной щели 7 осуществл ют отбойку остав- шегос  целика 26 рудного массива 9 посекционно, начина  от вис чего бока 27 к лежащему боку 17. При этом образуют предварительно буровые камеры 28, откуда разбуривают скважины 29 и взрывают поочередно.In the last stage of mining the ore massif 9, with the retreating order from the cutting slit 7, the remaining pillar 26 of the ore massif 9 is sectioned off, section by section, starting from hanging side 27 to the lying side 17. Preliminary drilling chambers 28 are formed from where wells are drilled 29 and blow up alternately.

Нижележащий подэтаж 11 также отбивают скважинами 30, разбуренными из доставочных выработок без создани  предварительных буровых камер.The underlying subsurface 11 is also beaten off by wells 30 drilled from the delivery workings without the creation of preliminary drilling chambers.

После полной отбойки оставшегос  целика 26 наращивают гибкое раздел ющее перекрытие 5 на отбитой руде 31 с охватом всей площади образованного совместными горными работами выработанного пространства .After complete cutting of the remaining pillar 26, a flexible dividing overlap 5 on the broken ore 31 is enlarged to cover the entire area of the developed space formed by joint mining.

Затем под защитой гибкого раздел ющего перекрыти  5 нижележащий этаж 32 отрабатывают системой этажного принудительного обрушени .Then, under the protection of the flexible dividing ceiling 5, the lower floor 32 is processed by the system of the floor forced collapse.

АBUT

ТT

фиг.,1fig. 1

АBUT

ГR

«М"M

«О"ABOUT

ЈJ

2626

&&%&&&% &

. °- W,iO . ° - W, iO

-- f& 0&$ %$Ј$- f & 0 & $% $ Ј $

:o-Lb-.o °. л: О-о У ои.о.-о : o-Lb-.o °. l: oh oh ooh

. 1.1...   . 1.1 ...

Фиг.55

Редактор Л. Лежит пEditor L. Lies p

Составитель С. Титова Техред М МоргенталCompiled by S. Titova Tehred M. Morgenthal

ЛL

2828

&&%&&&% &

. °- W,iO . ° - W, iO

&$ %$Ј$& $% $ Ј $

Корректор Э, ЛончаковаProofreader E, Lonchakova

Claims (1)

СПОСОБ КОМБИНИРОВАННОЙ РАЗРАБОТКИ КРУТОПАДАЮЩИХ РУДНЫХ ТЕЛ, включающий выемку руды карьером первой очереди до проектной глубины, совместную выемку руды ниже проектной глубины открытыми и подземными горными работами на соответствующих участках в едином выработанном пространстве,. размещение в выработанном пространстве гибкого разделяющего перекрытия, формирование отрезной щели, отбойку руды на подземном участке в отсутствующем порядке в направлении отMETHOD OF COMBINED DEVELOPMENT OF LARGE-FALLING ORE BODIES, including ore extraction by a first-stage open-pit mine to the design depth, joint ore mining below the design depth by open and underground mining at relevant sites in a single developed space ,. placement in the developed space of a flexible separating overlap, the formation of a cutting gap, ore blasting in the underground area in the missing order in the direction from
SU874315126A 1987-10-12 1987-10-12 Method of combination mining of steep ore bodies SU1677309A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874315126A SU1677309A1 (en) 1987-10-12 1987-10-12 Method of combination mining of steep ore bodies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874315126A SU1677309A1 (en) 1987-10-12 1987-10-12 Method of combination mining of steep ore bodies

Publications (1)

Publication Number Publication Date
SU1677309A1 true SU1677309A1 (en) 1991-09-15

Family

ID=21331275

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874315126A SU1677309A1 (en) 1987-10-12 1987-10-12 Method of combination mining of steep ore bodies

Country Status (1)

Country Link
SU (1) SU1677309A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР №607018, кл. Е21 С 41/00, 1976. Авторское свидетельство СССР № 1150368, кл. Е21 С 41/06, 1983. *

Similar Documents

Publication Publication Date Title
RU2333363C1 (en) Method of monitoring gas emission during mining operations in series of highly gaseous coal seams
US3917346A (en) Method of blasting a subterranean deposit
RU2502872C1 (en) Development method of thick steeply dipping ore bodies
RU95106332A (en) Method for degassing partially extracted guiding bed
SU1677309A1 (en) Method of combination mining of steep ore bodies
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
RU2115803C1 (en) Method for mining thick steep coal seams in upgrade
RU2123109C1 (en) Method for mining of coal series in marginal zones of opencast
RU2030581C1 (en) Method for combined mining of thick ore bodies
RU2790648C1 (en) Method for underground development of steeping ore bodies in descenting order with chamber system
SU1492055A1 (en) Method of mining thick gently-sloping ore bodies
RU2094612C1 (en) Method for opening steep thin ore deposits
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
RU2013549C1 (en) Method for artificial interhorizontal pillar building by mining steep and inclined formations
SU1439240A1 (en) Method of combined exploitation of mineral deposits
RU2038476C1 (en) Coal deposit exploitation method
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
RU2205954C1 (en) Method of mining of thick steep mineral beds
SU714012A1 (en) Ore deposit mining method
RU2039257C1 (en) Combined method for mining of coal seamseries
RU2229600C1 (en) Method for excavation of steep-falling ore deposits
RU2126484C1 (en) Method for protection of underground workings and surface soil from fouling with mine water
SU1666725A1 (en) Method for construction of protective wall made of ore blocks
RU2011823C1 (en) Method for mining of thick steep fire-hazardous coal seams
RU2081320C1 (en) Method for mining ore bodies