Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Специализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект"filedCriticalСпециализированный Проектно-Изыскательский И Экспериментально-Конструкторский Институт "Гидроспецпроект"
Priority to SU4630033/23ApriorityCriticalpatent/SU1633924A1/en
Application grantedgrantedCritical
Publication of SU1633924A1publicationCriticalpatent/SU1633924A1/en
FIELD: construction. SUBSTANCE: made in chimney stack 1 are two antishearing ports 3. Fixed hinge supports 5 are made at the level of blast cut, on its both sides to prevent spreading of share. To lessen moment of forces of resistance to chimney stack fall in needed direction, reinforcement in uncovered and cut along line 6. Drilled within cut are blast holes 8. These holes are charged with explosives and blasted. EFFECT: higher accuracy of directed demolition due to reduced resistance to fall of structure on the side opposite to direction of demolition. 2 dwg
SU4630033/23A1989-01-031989-01-03Method for directed demolition of high-rise reinforced concrete structure