SU1567779A1 - Method of vertical shaft sinking - Google Patents

Method of vertical shaft sinking Download PDF

Info

Publication number
SU1567779A1
SU1567779A1 SU884470457A SU4470457A SU1567779A1 SU 1567779 A1 SU1567779 A1 SU 1567779A1 SU 884470457 A SU884470457 A SU 884470457A SU 4470457 A SU4470457 A SU 4470457A SU 1567779 A1 SU1567779 A1 SU 1567779A1
Authority
SU
USSR - Soviet Union
Prior art keywords
blasting
drilling
sinking
drilled
advanced
Prior art date
Application number
SU884470457A
Other languages
Russian (ru)
Inventor
Игорь Викторович Федотов
Original Assignee
Днепропетровский Государственный Проектный Институт "Днепрогипрошахт"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Днепропетровский Государственный Проектный Институт "Днепрогипрошахт" filed Critical Днепропетровский Государственный Проектный Институт "Днепрогипрошахт"
Priority to SU884470457A priority Critical patent/SU1567779A1/en
Application granted granted Critical
Publication of SU1567779A1 publication Critical patent/SU1567779A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к горному делу и может быть использовано дл  проходки стволов шахт снизу вверх. Цель - повышение безопасности буровзрывных работ. Способ проходки вертикального ствола включает проходку передовой выработки (ПВ) 4. Из нее бур т горизонтальные взрывные скважины до достижени  ими контура ствола в основном забое. По мере проходки ПВ 4 возвод т временную перегородку 7. При этом бурение скважин и взрывание зар дов в них производ т по мере проходки ПВ 4 с выпуском породы за временную перегородку. Работы по проходке ствола 1 снизу вверх свод тс  к чередованию работ проходческого цикла по бурению, зар жанию и взрыванию вертикальных шпуров 2, проветриванию, возведению временной крепи 3 и наращиванию перегородки из опережающего забо  ПВ 4. Затем производ тс  работы по бурению, зар жанию и взрыванию горизонтальных скважин в основной забой 6. 4 ил.The invention relates to mining and can be used to drill shafts from the bottom up. The goal is to improve the safety of blasting. The method of sinking a vertical wellbore includes the sinking of an advanced production (CW) 4. Horizontal blast holes are drilled from it until they reach the trunk contour of the main bottomhole. As PI 4 is drilled, a temporary partition 7 is erected. At the same time, drilling of wells and blasting of charges in them is carried out as PI 4 is drilled with rock being released beyond the temporary partition. Bottom-up works on sinking the shaft 1 are reduced to alternating the work of the tunnel cycle for drilling, loading and blasting vertical holes 2, airing, erecting temporary lining 3 and increasing the partition from the advanced hole 4. Then, drilling, loading and the blasting of horizontal wells in the main face 6. 4 Il.

Description

этом бурение скважин и взрывание зар дов в них производ т по мере проходки ПВ 4 с выпуском породы за временную перегородку. Работы-по проходке ствола 1 снизу вверх свод тс  к чередованию работ проходческого цикла по бурению, зар жанию и в рыванию вертикальных шпуров 2, проветриванию , возведению временной крепи 3 и наращиванию перегородки из опережающего забо  ПВ 4. Татем производ тс  работы по бурению, зар жанию и взрыванию горизонтальных скважин в основной забой 6. А ил.Thereby, drilling of wells and blasting of charges in them are carried out as PV 4 is drilled with rock being released beyond the temporary partition. The works on the penetration of the shaft 1 from the bottom up are reduced to the alternation of the work of the tunnel cycle for drilling, loading and digging vertical holes 2, airing, erecting temporary lining 3 and increasing the partition from advanced PV 4. Tatem works on drilling, charging zhaniyu and blasting horizontal wells in the main face 6. And Il.

Изобретение относитс  к горному делу и может быть использовано дл  проходки стволов шахт снизу вверх.The invention relates to mining and can be used to drill shafts from the bottom up.

Целью изобретени   вл етс  повышение безодасности буровзрывных работ .The aim of the invention is to increase the safety of blasting operations.

На фиг. 1 показан ствол после бу- рени  и зар жани  вертикальных шпуров при проходке опережающей выработки, общий вид; на фиг. 2 - ствол после бурени  и зар жани  горизонтальных шпуров в основном забое, общий вид; на фиг. 3 - сечение А-А на фиг. 2; на фиг. 4 - сечение Б-Б на фиг. 2.FIG. Figure 1 shows the trunk after drilling and charging vertical boreholes when penetrating an advance production, general view; in fig. 2 - stem after drilling and charging horizontal holes, mainly in the bottomhole, general view; in fig. 3 is a section A-A in FIG. 2; in fig. 4 is a section BB in FIG. 2

Способ проходки вертикального ствла 1 включает проходку касательно к KOH туру ствола 1, например, взрывателем зар дов в вертикальных шпурах 2 с возведением временной крепи 3 опережающей выработки 4, бурение и зар жение из нее горизонтальных взрывных скважин 5 до достижени  ими контура ствола 1 в основном забое 6. По мере проходки выработки 4 возвод т перегородку 7. При этом бурение взрывных скважин 5 и взрывание зар дов в них производ т по мере проходки выработки 4 с выпуском породы в невскрытую часть ствола 1.The method of drilling vertical shaft 1 includes driving the trunk 1 with respect to KOH, for example, with a charge fuse in vertical bore-holes 2 with erecting a temporary support 3 of the advance production 4, drilling and charging horizontal wells 5 from it until they reach the contour of the trunk 1 mainly bottomhole 6. As production 4 is drilled, a partition 7 is erected. At the same time, drilling of explosive wells 5 and blasting of charges into them is carried out as production 4 is penetrated with release of rock into the non-opened part of the trunk 1.

Выполнение временной перегородки исключает попадание разработанной породы 8 в рабочий раздел 9, в котором движетс , например, комплекс 10 дл  проходки восстающих выработок. Рабочий раздел 9 может быть защищен сверху откосным полком 11, исключающим попадание в рабочий раздел 9 разработанной породы 8 непосредственно во врем  взрывани  вертикальных шпуров 2 и горизонтальных скважин 5.The implementation of a temporary partition prevents the developed rock 8 from getting into working section 9, in which, for example, complex 10 is moving for excavation of raised workings. The working section 9 can be protected from above by a side shelf 11, which prevents the developed section 8 from entering the working section 9 directly during the blasting of vertical holes 2 and horizontal wells 5.

Способ проходки осуществл етс  следующим образом.The method of penetration is as follows.

На нижележащем горизонте из выработки , имеющей подход к будущему ствлу 1 снизу, сооружают технологичесOn the lower horizon, from the mine, which has an approach to the future trunk 1 below, builds a technological

5five

00

5five

00

5five

кий отход, например, на величину 5-10 м. Затем производ т монтаж комплекса 10 дл  проходки восстающих выработок и устраивают временную перегородку 7, например, из дерев нных брусьев. При этом временна  перегородка раздел ет ствол 1 на два раздела: большой - породный, в котором на весь период проходки будет аккумулироватьс  разработанна  порода 8, и меньиий. - рабочий, в котором будет двигатьс  комплекс 10 и будут вестись работы проходческого цикла.The waste is removed, for example, by 5–10 m. Then, installation of complex 10 is made for the excavation of raised workings and a temporary partition 7 is arranged, for example, from wooden beams. At the same time, a temporary partition divides stem 1 into two sections: a large one - a pedigree, in which the developed breed 8 will accumulate for the entire period of penetration, and a minority. - a worker in which complex 10 will move and the driving cycle will be operated.

После выполнени  подготовительных работ приступают к собственной проходке ствола 1 в направлении снизу вверх. Дл  этого комплекс 10 поднимают к забойной части ствола 1 и производ т бурение и зар жание вертикальных шпуров 2 на первую заходку. При этом площадь обуривани  не превышает площади рабочего раздела. Затем комплекс 10 опускают на нижележащий горизонт , рабочий раздел перекрывают откосным полком 11 и производ т взрывание. Разработанную породу 8 по полку 11 пересыпают в породный раздел, где ее аккумулируют.After the preparatory work is done, they start their own penetration of the barrel 1 in the upward direction. For this purpose, the complex 10 is raised to the bottom hole section of the barrel 1 and the vertical holes 2 are drilled and charged at the first stop. At the same time, the area of drilling does not exceed the area of the working section. Then the complex 10 is lowered onto the lower horizon, the working section is overlapped with a railing regiment 11 and blasting is performed. The developed breed 8 along regiment 11 is poured into the breed section, where it is accumulated.

После взрывани  вертикальных шпуров 2 с продвижени  передовой выработки 4 на первой заходке забойную часть ствола раздел ют на два забо : первый - опережающий забой выработки 4 и второй - основной забой 6.After blasting vertical boreholes 2 from advancing the advanced production 4 at the first inlet, the bottomhole section of the trunk is divided into two ends: the first is the leading bottom of the output 4 and the second is the main bottom 6.

- } С окончанием работ по проветриванию-} With the end of the airing

всей забойной части ствола 1 комплекс 10 поднимают в опережающий забой выработ- ки 4.Откосной полок 11 отбрасывают и подъезжают комплексом 10 к самому забою, где производ т его оборку от нависших кусков породы, возведе- ,нию временной крепи 3 рабочего раздела 9 и наращивание перегородки 7, после чего приступают к бурению, зар жанию и взрыванию вертикальныхthe entire downhole part of the barrel 1, the complex 10 is raised to the advanced bottom of the excavation 4. The retractable shelves 11 are thrown away and approached by the complex 10 to the very bottom, where it is frayed from the hanging pieces of rock, erecting a temporary lining 3 of the working section 9 and building partitions 7, then proceed to the drilling, loading and blasting of vertical

шпуров 2 в опережающем забое выработки 4. При этом работы на второй заходке аналогичны работам проходческого цикла на первой заходке.bore-holes 2 in the advanced bottom hole 4. At the same time, the work on the second stop is similar to the work of the driving cycle on the first stop.

После проветривани  всей забойно части ствола 1 комплекс 10 вновь поднимают в опережающий забой выработки 4, проезжают через откосной полок 11, обирают опережающий забой от нависших кусков породы, позвол т временную крепь 3 рабочего раздела и приступают к бурению горизонтальных скважин 5 веером в основной забой 6 на первую заходку. С окончанием бурени  горизонтальных скважин их зар жают и опускают комплекс 10 на нижележащий горизонт, перекрыв при этом рабочий раздел 9 откосным полком 11, после чего производ т взрыв. Разработанна  порода 8, пада  аккумулируетс  в породном разделе, выполн   роль временной крепи в этом разделе ствола 1. IAfter airing all the downhole parts of the barrel 1, the complex 10 again lifts into the advanced bottom of the mine 4, passes through the sloping shelves 11, picks up the advanced bottom from the overhanging rock pieces, allows temporary lining of 3 working sections and proceeds to drilling the horizontal wells 5 with a fan to the main face 6 on the first stop. With the end of the drilling of horizontal wells, they are charged and lowered the complex 10 to the underlying horizon, blocking the working section 9 with a sloping regiment 11, after which an explosion takes place. The developed breed 8, the pads accumulates in the breed section, performs the role of temporary support in this section of the trunk 1. I

Дальнейшие работы по проходке ствола 1 снизу вверх свод тс  к чередованию работ проходческого цикла по бурению, зар жанию и взрываниюFurther work on the penetration of the barrel 1 from the bottom up is reduced to the alternation of the work of the tunnel cycle on drilling, charging and blasting.

вертикальных шпуров 2, проветриванию , возведению временной крепи 3 и наращиванию перегородки 7 из опере- жающего забо  выработки 4 и работ по бурению, зар жанию и взрыванию горизонтальных шпуров 5 в основной забой 6.vertical bore-holes 2, airing, erecting temporary support 3 and building up the partition 7 from the propelling hole 4 and drilling, loading and blasting of horizontal holes 5 in the main face 6.

Claims (1)

Формула изобретени Invention Formula Способ проходки вертикального ствола, включающий проходку передовой выработки, б -рение из нее взрывных скважин и расширение передовой выработки взрыванием в них зар дов с выпуском породы вниз, отличающийс  тем, что, с целью повышени  безопасности буровзрывных работ, проходку передовой выработки производ т касательно к контуру ствола, по мере проходки производ т временную перегородку, а взрывные/скважины бур т горизонтально до достижени  контура ствола, при этом бурение взрывных скважин и взрывание зар дов производ т по мере проходки передовой выработки с выпуском породы за временную перегородку.A method of penetrating a vertical well, including sinking advanced production, blasting wells from it and expanding advanced production by blasting charges into them with rock production down, characterized in that, in order to increase the safety of blasting, advanced development the wellbore contour, as it penetrates, a temporary partition is produced, and the blast / wells are drilled horizontally until the borehole contour is reached, while drilling the blastholes and blasting charges as they pass ki advanced production with the release of the breed for a temporary partition. 5five 00 5five Фие.2Fie.2 Риг.зRig.z 5 -Б5 B /l-/f/ l- / f
SU884470457A 1988-08-05 1988-08-05 Method of vertical shaft sinking SU1567779A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884470457A SU1567779A1 (en) 1988-08-05 1988-08-05 Method of vertical shaft sinking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884470457A SU1567779A1 (en) 1988-08-05 1988-08-05 Method of vertical shaft sinking

Publications (1)

Publication Number Publication Date
SU1567779A1 true SU1567779A1 (en) 1990-05-30

Family

ID=21394002

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884470457A SU1567779A1 (en) 1988-08-05 1988-08-05 Method of vertical shaft sinking

Country Status (1)

Country Link
SU (1) SU1567779A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 847749, кл. Е 21 I) 1/03, 1979. Чупрунов Г.Д. Проведение и крепление горных выработок. П.: Госгор - техиздат, 1960, с. 316-317. ///У.1 *

Similar Documents

Publication Publication Date Title
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN101302933B (en) Method for developing rock lane comprehensive mechanization developing operation
SU1567779A1 (en) Method of vertical shaft sinking
RU2215147C2 (en) Method of mining of inclined ore deposits
SU1344906A1 (en) Method of driving reserved-dome mine workings
RU2295037C1 (en) Method for extracting thick inclined coal formation by column-chambers
SU1682568A1 (en) Method for working thick steep and inclined fire hazardous coal seams
SU1701916A1 (en) Method of mining inclined ore deposits
SU1710763A1 (en) Method of sinking vertical shaft siding
RU2166631C2 (en) Method of opening of mine horizons from deep openpits in mining of kimberlite deposits
RU2094612C1 (en) Method for opening steep thin ore deposits
SU1384755A1 (en) Method of mining gently-sloping and sloping ore bodies
SU1564348A1 (en) Method of excavating pillars on neighbouring ore deposits
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
SU1634784A1 (en) Method for sealing off mine workings
RU1828921C (en) Method for working pillars in room-and-pillar mining system
SU1739030A1 (en) Method for working thick steep coal seams
SU1666710A1 (en) Method for development of mineral deposits
SU1665038A1 (en) Method of driving narrow-face workings with separate coal and rock extraction
RU2231642C1 (en) Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness
SU1337517A1 (en) Method of combined underground/open mining of coal beds
UA32583U (en) Method for development of steep shallow ore deposits in contour zone of pits
SU1671866A1 (en) Shaft tunneling method with pre-shaft drifting
RU1788256C (en) Method for mining and inclined coal seams of medium thickness
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals