SU1557330A1 - Shield for mining thick steep beds - Google Patents

Shield for mining thick steep beds Download PDF

Info

Publication number
SU1557330A1
SU1557330A1 SU874204491A SU4204491A SU1557330A1 SU 1557330 A1 SU1557330 A1 SU 1557330A1 SU 874204491 A SU874204491 A SU 874204491A SU 4204491 A SU4204491 A SU 4204491A SU 1557330 A1 SU1557330 A1 SU 1557330A1
Authority
SU
USSR - Soviet Union
Prior art keywords
shield
metal
beams
tip
prestressed
Prior art date
Application number
SU874204491A
Other languages
Russian (ru)
Inventor
Николай Сергеевич Арсенов
Вениамин Иванович Черемнов
Николай Иосифович Яковлев
Юрий Яковлевич Мосунов
Степан Николаевич Суховольский
Валерий Григорьевич Ефремов
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ"
Priority to SU874204491A priority Critical patent/SU1557330A1/en
Application granted granted Critical
Publication of SU1557330A1 publication Critical patent/SU1557330A1/en

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Изобретение относитс  к горной промышленности и предназначено дл  разработки мощных крутых пластов щитовой системой. Цель - повышение несущей способности щита за счет создани  предварительного напр жени . Щит включает шпренгельные балки (Б) 1, соединенные между собой по простиранию пласта продольными металлическими по сами (МП) 2 и ст жными болтами 3. При этом Б выполнены предварительно напр женными. Кажда  Б 1 выполнена из дерев нной Б 4 (накатины) с металлическими оголовками 5, установленными на торцах. К оголовкам 5 прикреплен МП 6. Последний  вл етс  преднапр женной ст жкой и выполнен из полосовой стали, стальных канатов и т.п. и нат нут с усилием, соответствующим прогибу Б 1. Между дерев нной Б 4 и МП 6 установлены жесткие распорные стойки 7. Металлические оголовки 5 выполнены в виде открытых сверху коробов, которые нижней частью соединены с преднапр женными ст жками. Дл  фиксации оголовка 5 на Б 4 в верхних част х боковых стенок имеютс  проушины под палец 9. Между стенкой оголовка 5 и торцом Б 4 установлены металлические вкладыши 10. Очистные работы под щитом ведутс  буровзрывным способом. 3 ил.The invention relates to the mining industry and is intended to develop thick steep seams with a shield system. The goal is to increase the carrying capacity of the shield by creating prestressing. The shield includes truss beams (B) 1, interconnected along the strike of the formation by longitudinal metal along (MP) 2 and clamp bolts 3. At the same time, B is prestressed. Each B 1 is made of wooden B 4 (nakatina) with metal tips 5 installed on the ends. The MP 6 is attached to the tips 5. The latter is a prestressed tie rod and is made of flat steel, steel ropes, etc. and tensioned with a force corresponding to deflection B 1. Between the wooden B 4 and MP 6 rigid spacing posts 7 are installed. The metal heads 5 are made in the form of open-top boxes, which are connected to the lower part with pre-tension straps. For fixing the tip 5 on B 4, there are eyelets under the finger 9 in the upper parts of the side walls. Metal inserts 10 are installed between the wall of the tip 5 and the end B 4. The cleaning work under the shield is carried out by drilling and blasting. 3 il.

Description

Фие.1Phie.1

Изобретение относитс  к горной промышленности и предназначено дл  разработки мощных крутых пластов щитовой системой оThe invention relates to the mining industry and is intended to develop thick steep seams with a shield system of

Целью изобретени   вл етс  повышение несущей способности щита за счет создани  предварительного напр жени „The aim of the invention is to increase the carrying capacity of the shield by creating a preliminary voltage "

На фигс 1 приведена конструкци  дерев нной шпренгельной балки, вид сбоку; на фиг 2 - сечение А-А на фиг„ 1; на фиг о 3 - сечение Б-Б на фиг о 1„ .Fig. 1 shows the construction of a wooden truss beam, side view; Fig 2 - section A-A in Fig „1; FIG. 3 shows a section BB in FIG. 1 a.

Щит дл  разработки мощных крутых пластов состоит из mnpeHrejfbHbix ба- лок 1, соединенных между собой по простиранию пласта металлическимиThe shield for the development of thick steep seams consists of mnpeHrejfbHbix bars 1, interconnected along the metal strike

продольными по сами 2 и хомутами (ст жными болтами) 3„ Кажда  шпрен- гельна  балка выполнена из дерев нной балки (накатины) 4 с металлическими оголовками 5, установленными на торцах; к оголовкам 5 закреплен металлический по с 6, выполненный из полосовой стали, стальных канатов или пучков высокопрочной холоднот нутой стальной проволоки о Между дерев нной балкой 4 и металлическим по сом 6 установлены жесткие распорные стойки 7 Металлические оголовки 5 изготовлены в виде коробов с двум  открытыми стенками: с верхней стороны и дл  установки оголовка на дерев нную балку 4U Дл  фиксации оголовка на дерев нной балке в верхних част х боковых стенок имеютс  проушины 8 под палец 9„ Между стен кой оголовка 5 и торцом дерев нной балки 4 установлены металлические вкладыши 10о Ыпрегнельные балки выполнены предварительно напр женными: дерев нна  балка 4 имеет прогиб (50 - 70 мм) в противоположную сторону от металлического по са 6, который в свою очередь нат нут с усилием, соответствующим этому прогибуlongitudinal on the 2 themselves and clamps (tension bolts) 3 “Each transom beam is made of a wooden beam (nakatina) 4 with metal tips 5 installed on the ends; Metallic 6, made of flat steel, steel ropes or bundles of high-strength cold-drawn steel wire, is fixed to the tips 5. A rigid strut 7 is installed between the wooden beam 4 and the metal pole 6. The metal tips 5 are made in the form of ducts with two open walls : From the top side and to install the head on the wooden beam 4U To fix the head on the wooden beam in the upper parts of the side walls there are eyelets 8 for finger 9 "Between the wall head 5 and the end of the tree beams 4 are fitted with metal inserts 10 o The pre-beam beams are prestressed: the wooden beam 4 has a deflection (50 - 70 mm) in the opposite direction from the metal belt 6, which in turn is pulled with a force corresponding to this deflection

Очистные работы под щитом из шпрен гельных балок ведутс  буровзрывным способом, как под бессекционными эластичными щитами оCleaning work under the shield of the spars of the gel beams is carried out by drilling and blasting, as under non-sectional elastic shields of

Claims (1)

Формула изобретени Invention Formula Щит дл  разработки мощных крутых пластов, включающий дерев нный накат- |ник из шпренгельных балок, которые |объединены между собой металлическими продольными по сами, преднапр женные ст жки, распорные элементы, расположенные под накатником в средней его части между балками и ст жками, отличающийс  тем, что, с цель повышени  несущей способности щита за счет создани  предварительного напр жени  балок, щит снабжен установленными на торцах балок оголовками, выполненными в виде открытых сверху коробов, которые нижней частью соединены с преднапр женными ст жками и закреплены с каждой из балок посредством съемных фиксирующих элементов, расположенных с верхней стороны короба , и металлических вкладышей, установленных между торцами оголовка и накатника, причем распорные элементы выполнены в виде жестких стоек, а преднапр женные ст жки - в виде жестких металлических по сов.Shield for the development of powerful steep seams, including a wooden knurled-out nack of girder beams, which are interconnected by metal longitudinal ones themselves, prestressed straps, spacers located under the nakatnik in its middle part between the beams and straps, differing In order to increase the bearing capacity of the shield by creating prestressing of the beams, the shield is equipped with tip-shaped beams installed at the ends, made in the form of open-top boxes, which are connected to the bottom with with each of the beams by means of removable fixing elements located on the upper side of the box, and metal liners installed between the ends of the tip and the knurling, and the spacer elements are made in the form of rigid posts, and the prestressed straps are in the form of rigid metal on owls. А-АAa 6-56-5 8eight Фиг.ЗFig.Z
SU874204491A 1987-01-07 1987-01-07 Shield for mining thick steep beds SU1557330A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874204491A SU1557330A1 (en) 1987-01-07 1987-01-07 Shield for mining thick steep beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874204491A SU1557330A1 (en) 1987-01-07 1987-01-07 Shield for mining thick steep beds

Publications (1)

Publication Number Publication Date
SU1557330A1 true SU1557330A1 (en) 1990-04-15

Family

ID=21288679

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874204491A SU1557330A1 (en) 1987-01-07 1987-01-07 Shield for mining thick steep beds

Country Status (1)

Country Link
SU (1) SU1557330A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120167504A1 (en) * 2011-01-04 2012-07-05 Mckinney John Precast insulated concrete wall assembly
CN105672577A (en) * 2014-11-19 2016-06-15 东北林业大学 New pre-stress bamboo and wood beam end anchorage device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельс э СССР № 968434, кло Е 21 D 1Q/0-, 48 Авторское свидетельство ГССР № 1219813, кл„ Е 21 D 19/04 1984. *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120167504A1 (en) * 2011-01-04 2012-07-05 Mckinney John Precast insulated concrete wall assembly
CN105672577A (en) * 2014-11-19 2016-06-15 东北林业大学 New pre-stress bamboo and wood beam end anchorage device

Similar Documents

Publication Publication Date Title
US3140764A (en) Prestressed girder member
US4144686A (en) Metallic beams reinforced by higher strength metals
SU1557330A1 (en) Shield for mining thick steep beds
US3070845A (en) Pretensioned multiple span beam system
HU182953B (en) Supporting frame for drifts, tunnels or similars
SU896212A1 (en) Method of prestraining a girder
US3438336A (en) Overhead crane runway structures
SU1434062A1 (en) Arrangement for reinforcing operated reinforced concrete beam
SU977630A1 (en) Device for securing wooden post to reinforced concrete base
SU1799944A1 (en) Reinforced beam of ferroconcrete bridge span structure
SU870565A1 (en) Device for damping oscillations of bridge structure
JP2688613B2 (en) Stringed beam floor structure
SU1465178A1 (en) Boring bar
RU12141U1 (en) WOODEN CONCRETE SPAN STRUCTURE OF THE BRIDGE
SU916722A1 (en) Device for reiforcing columns
SU687162A1 (en) Assembly of adjusting stay to box-type sectional of blocks reinforced concrete beam of rigidity of stay bridge
GB2150199A (en) A device for prestressing steel support constructions
SU1654483A1 (en) Rest unit for solid wooden girder
RU2002913C1 (en) Detachable joint for high strength steel wire bandle
SU1252455A1 (en) Prestrained multispan beam structure
SU702096A1 (en) Method of prestressing a continuous span structure of a bridge
SU139800A1 (en) Joints for connecting assembly and working packages of high-strength wire
SU1094966A1 (en) Movable metal forms
SU1071678A1 (en) Stationary pier part of a bridge