SU1553681A1 - Method of safeguarding mine working in excavation of mineral beds at great depths - Google Patents

Method of safeguarding mine working in excavation of mineral beds at great depths Download PDF

Info

Publication number
SU1553681A1
SU1553681A1 SU884431770A SU4431770A SU1553681A1 SU 1553681 A1 SU1553681 A1 SU 1553681A1 SU 884431770 A SU884431770 A SU 884431770A SU 4431770 A SU4431770 A SU 4431770A SU 1553681 A1 SU1553681 A1 SU 1553681A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rock
width
compaction
strip
pressure
Prior art date
Application number
SU884431770A
Other languages
Russian (ru)
Inventor
Владимир Павлович Зубов
Original Assignee
Ленинградский горный институт им.Г.В.Плеханова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский горный институт им.Г.В.Плеханова filed Critical Ленинградский горный институт им.Г.В.Плеханова
Priority to SU884431770A priority Critical patent/SU1553681A1/en
Application granted granted Critical
Publication of SU1553681A1 publication Critical patent/SU1553681A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Изобретение относитс  к горному делу и позвол ет снизить затраты на поддержание горных выработок (ГВ) и повысить их устойчивость за счет уменьшени  вли ни  процесса уплотнени  породной полосы (ПП) горным давлением. В выработанном пространстве вслед за лавой возвод т ПП. После стабилизации процесса уплотнени  ПП горным давлением в средней ее части проход т ГВ. Относительно вмещающих пород ГВ проход т по любой схеме. При разработке пластов с легкообрушающимис  породами кровли ПП формируют шириной, большей ширины ГВ, на величину, равную шестикратной высоте ПП после стабилизации процесса ее уплотнени  горным давлением. При такой ширине ПП наход тс  в состо нии, близком к объемному сжатию, что практически полностью исключает их дальнейшее уплотнение горным давлением. 1 з.п. ф-лы, 1 ил.The invention relates to mining and reduces the cost of maintaining mine workings (HS) and increases their stability by reducing the impact of the compaction process on the rock strip (MF) with mining pressure. In the developed space, following the lava, erection of PP. After stabilization of the process of compaction of PP by mountain pressure, in the middle part of it HW pass. Regarding the host rocks, the HS is carried out in any pattern. When developing seams with light-breaking roof rocks, the PP is formed with a width greater than HW width by an amount equal to six times the PP height after stabilization of the process of its compaction by rock pressure. With such a width, the SP is in a state close to the volume compression, which almost completely excludes their further compaction by rock pressure. 1 hp f-ly, 1 ill.

Description

Изобретение относитс  к горному делу и может быть использовано дл  охраны горных выработок при разработке пластов полезных ископаемых на болыьих глубинах.The invention relates to mining and can be used to protect mine workings in the development of seams of minerals at great depths.

Целью изобретени   вл етс  снижение затрат на поддержание горных выработок и повышение их устойчивости за счет уменьшени  вли ни  процесса уплотнени  породной полосы горным давлением.The aim of the invention is to reduce the cost of maintaining mine workings and increase their stability by reducing the influence of the compaction process of the rock strip with rock pressure.

На чертеже показана схема охраны проводимой горной выработки.The drawing shows the scheme of the ongoing mine workings.

Позици ми на чертеже обозначено: 1 - лава; 2 - горна  выработка 3 -.Positions in the drawing denote: 1 — lava; 2 - mining output 3 -.

породна  полоса; b - ширина породной полосы 3, возводимой вслед за лавой; h г - высота породной полосы после стабилизации процесса уплотнени  ее горным давлением; 1 - ширина породных гполос между подготовительной выработ- кой и выработанным пространством:rock band; b - the width of the rock strip 3, erected after the lava; h g is the height of the rock strip after stabilization of the compaction process by its rock pressure; 1 - width of rocky polos between the preparatory development and the developed space:

Породную полосу формируют параллельно оси горной выработки.The rock strip is formed parallel to the axis of the mine workings.

Породна  полоса 3 шириной b возводитс  в выработанном пространстве вслед за лавой 1. После стабилизации процесса уплотнени  породной полосы горным давлением по ней проход т горную выработку 2. Горную выработкуBreed strip 3 of width b is erected in the mined-out space following lava 1. After the consolidation process of the rock strip has stabilized, mountain excavation passes along it with rock pressure 2. Mining excavation

СПSP

сдsd

ОЭ О 00OO O 00

проход т по породной полосе в средней ее части. При этом подготовительна  выработка может быть пройдена относительно вмещающих пород по любой из известных схем: с подрывкой пород кровли, с подрывкой пород почвы, с подрывкой пород кровли и почвы, без подрывки пород кровли и почвы.pass along the breed strip in its middle part. At the same time, preparatory development can be made relative to the host rocks according to any of the known schemes: with undermining of roof rocks, with undermining soil rocks, with undermining roof rocks and soil, without undermining roof rocks and soil.

При разработке пластов с легкообразующимис  породами кровли максимальный эффект достигаетс  при ширине породной полосы, большей ширины подготовительной выработки на величину , равную шестикратной высоте породной полосы после стабилизации процесса уплотнени  ее горным давлением. При выполнении данного услови  после проведени  подготовительной выработки с обеих сторон от нее остаютс  пород- ные полосы, ширина каждой из которых равна Зпп, где hn - высота породной пелось возводимой вслед за лавой, после стабилизации процесса уплотнени  ее горным давлением. При такой ширине данные полосы наход тс  в состо нии, близком к объемному сжатию что практически полностью исключает их дальнейшее уплотнение горным давлением .When developing layers with light-forming roof rocks, the maximum effect is achieved when the width of the rock strip is greater than the width of the preparatory excavation by an amount equal to six times the height of the rock strip after stabilization of the compaction process by rock pressure. When this condition is fulfilled, after carrying out the preparatory development, rock lanes remain on both sides of it, the width of each of which is equal to RFP, where hn is the height of the rock mass erected after the lava, after stabilization of the compaction process by its rock pressure. With such a width, these bands are in a state close to the volume compression, which almost completely excludes their further compaction by rock pressure.

Дальнейшее увеличение ширины бутовых полос экономически нецелесообразно , так как состо ние подготовиA further increase in the width of the rubble strips is not economically feasible, since the state of preparation

00

Q Q

тельной выработки не улучшаетс , а затраты на возведение полосы возрастают .body output is not improved, and the cost of construction of the strip increases.

Claims (2)

1.Способ охраны горной выработки при разработке пластов полезных ископаемых на больших глубинах, включгЮ- щий проведение горной выработки в выработанном пространстве лавы, формирование породной полосы параллельно оси горной выработки, отличаю5 Щ и и с   тем, что, с целью снижени  затрат на поддержание горных выработок и повышени  их устойчивости за счет уменьшени  вли ни  процесса уплотнени  породной полосы горным давлением , породную полосу формируют вслед за лавой шириной,, большей ширины горной выработки, а горную выработку провод т по породной полосе в средней ее части после стабилизации процесса ее уплотнени  горным давлением .1. A method of guarding mine workings in the development of mineral deposits at great depths, including carrying out the mine workings in the worked-out area of lava, forming the rock strip parallel to the mine work axis, is different from 5 to openings and increase their stability by reducing the influence of the process of compaction of the rock strip by rock pressure, the rock strip is formed after the lava width of a greater width of the mine workings, and the mine workings t for rock band at a middle portion of the process after stabilization of its sealing rock pressure. 2.Способ поп.19 отличающийс  тем, что породную полосу формируют шириной, большей ширины горной выработки на величину, равную шестикратной высоте породной полосы после стабилизации процесса уплотнени  ее горным давлением.2. Method of pop.19, characterized in that the rock strip is formed with a width greater than the width of the mine workings by an amount equal to six times the height of the rock strip after stabilization of the compaction process by its rock pressure. 30thirty
SU884431770A 1988-05-30 1988-05-30 Method of safeguarding mine working in excavation of mineral beds at great depths SU1553681A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884431770A SU1553681A1 (en) 1988-05-30 1988-05-30 Method of safeguarding mine working in excavation of mineral beds at great depths

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884431770A SU1553681A1 (en) 1988-05-30 1988-05-30 Method of safeguarding mine working in excavation of mineral beds at great depths

Publications (1)

Publication Number Publication Date
SU1553681A1 true SU1553681A1 (en) 1990-03-30

Family

ID=21377696

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884431770A SU1553681A1 (en) 1988-05-30 1988-05-30 Method of safeguarding mine working in excavation of mineral beds at great depths

Country Status (1)

Country Link
SU (1) SU1553681A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Зборщик М.П. Охрана выработки глубоких шахт в выработанном пространстве. Киев: Техника, 19785 с.158. Указани по рациональному расположению, охране и поддержанию горных выработок на угольных шахтах СССР. Л., ВНИМИ, 1986, с.77. *

Similar Documents

Publication Publication Date Title
SU1553681A1 (en) Method of safeguarding mine working in excavation of mineral beds at great depths
SU735804A1 (en) Method of protecting preparatory mine working
RU2123109C1 (en) Method for mining of coal series in marginal zones of opencast
SU1469137A1 (en) Roof control method
SU1209870A1 (en) Method of safeguarding side drifts of longwalls
RU2134786C1 (en) Method for saving sections of development workings
SU1661422A1 (en) Method for working inclined ore obstructions
RU1776322C (en) Method for protecting mine working
RU2224890C1 (en) Method for extracting sloping or slanted shock-hazardous layers
SU836364A1 (en) Method of preventing dynamic phenomena at working of coal beds
RU97118038A (en) METHOD FOR PROTECTION OF PLASTIC MINING PRODUCTION
RU2078930C1 (en) Method of preservation of extraction drift
RU1774024C (en) Method of preventing sudden outcrops in preliminary drifts
SU1219806A1 (en) Method of mining thick gently-sloping ore deposits
SU1585516A1 (en) Method of protecting buildings from undermining hazards
SU1479663A1 (en) Method of safeguarding mineral-bed working
RU1800056C (en) Method for prevention of rock bursts and sudden outbursts in seams mined without leaving interface pillars
SU1580006A1 (en) Method of protecting steep outburst-prone coal seams from gas dynamic effects
SU1559156A1 (en) Method of safeguarding bed-type adjoining mine workings
SU1467183A1 (en) Method of safeguarding mine workings
SU1453022A1 (en) Method of driving mine working
SU1102954A1 (en) Method of working coal-bearing formations in complicated geological conditions
SU1460272A1 (en) Method of chamber mining of mineral with filling-up of excavated space
SU1375834A1 (en) Method of driving mine workings through outburst-hazardous areas of rock body
SU1033757A1 (en) Mine working restoring method