SU1532666A1 - Method of working soil by suction dredger - Google Patents
Method of working soil by suction dredger Download PDFInfo
- Publication number
- SU1532666A1 SU1532666A1 SU874349301A SU4349301A SU1532666A1 SU 1532666 A1 SU1532666 A1 SU 1532666A1 SU 874349301 A SU874349301 A SU 874349301A SU 4349301 A SU4349301 A SU 4349301A SU 1532666 A1 SU1532666 A1 SU 1532666A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- dredger
- slurry
- slurry line
- quarry
- section
- Prior art date
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Изобретение относитс к гидромеханизации и предназначено дл подводной разработки грунта. Цель - повышение эффективности работы земснар да за счет уменьшени гидросмеси по карьерному пульповоду (ПВ). Участки 1, 2 карьерного ПВ с шарнирным соединением 3 между ними укладывают в карьере на понтонах. Участок 1 подключают шарниром 4 к земснар ду 5. Участок 2 шарниром 6 соедин ют с магистральным ПВ 7. Шарнирное соединение 3 фиксируют от перемещени в горизонтальной плоскости. Выемку грунта земснар да 5 осуществл ют возвратно-поступательными проходками 12, причем перемещают земснар д 5 по дуге окружности, радиусом которой вл етс участок 1, расположенный между земснар дом 5 и шарнирным соединением 3. В конце каждой проходки 12 земснар д 5 поворачивают на 180°. Разработку грунта в зимний период ведут в направлении к месту соединени карьерного ПВ с магистральным ПВ 7 путем сокращени длины карьерного ПВ. 1 з.п. ф-лы, 1 ил.This invention relates to hydromechanization and is intended for underwater excavation. The goal is to increase the efficiency of the operation of the dredger by reducing the slurry along the open-pit slurry line (PT). Sections 1, 2 career PV with a swivel 3 between them laid in a career on the pontoons. Section 1 is connected by a hinge 4 to the dredger 5. Section 2 is connected by a hinge 6 to the main hoops 7. The hinged connection 3 is fixed from movement in the horizontal plane. The excavation of the dredge 5 is carried out by reciprocating penetrations 12, and the dredge 5 is moved along an arc of a circle whose radius is section 1 located between the dredge 5 and the hinge connection 3. At the end of each penetration 12 the dredge 5 is turned 180 ° The development of the soil in the winter period is carried out in the direction to the junction of the quarry MF with the main MF 7 by reducing the length of the MF. 1 hp f-ly, 1 ill.
Description
-«Изобретение относитс к гидромеханизации и предназначено дл подводной {разработки грунта. - "The invention relates to hydromechanization and is intended for underwater {development of soil.
Цель изобретени - повышение эй- фективности работы земснар да за счет уменьшени гидравлических сопротивлений при движении гидросмеси по карьерному пульповоду.The purpose of the invention is to increase the efficiency of the dredge operation by reducing the hydraulic resistance during the movement of the slurry along the quarry slurry line.
На чертеже изображена схема обра- ботки грунта земснар дом.The drawing shows the scheme of soil treatment of a dredger house.
Способ осуществл ют следующим образом .The method is carried out as follows.
Жесткие участки 1 и 2 карьерного пульповода с шарнирным соединением 3 между ними укладывают на понтонах на поверхности воды в карьере. Участок 1 карьерного пульповода подключают шарниром А к земснар ду 5. Участок 2 шарниром 6 соедин ют с шарнирным пульповодом 7. Шарнирное соединение 3 фиксируют от перемещени в горизонтальной плоскости лебедками 8 и 9 с т говыми тросами 10 и П. Выемку грунта земснар дом 5 осуществп ют возвратно-поступательными проходками 12, причем земснар д 5 перемещают по дуге окружности, радиусом которой вл етс участок 1 карьерного пульповода , расположенный между земснар дом 5 и шарнирным соединением 3. В конце каждой проходки 12 земснар д 5 поворачивают на 180 ., Разработку грунта в зимний период ведут в направлении к месту средине- ни карьерного пульповода с магистральным пульповодом 7 путем сокращени длины карьерного пульповода. При этом участки 1 и 2 карьерного пульповода размещают на лед ном покррве карьера без понтонов. Майну поддерживают путем периодической вырезки лед ного покрова перед земснар дом 5 на величину его подачи.The hard sections 1 and 2 of the quarry slurry line with a swivel 3 between them are placed on pontoons on the surface of the water in the quarry. Section 1 of the slurry pit is connected by hinge A to the dredger 5. Section 2 by the hinge 6 is connected to the hinged slurry line 7. The hinged connection 3 is fixed from horizontal movement by means of winches 8 and 9 with traction cables 10 and P. There are reciprocating penetrations 12, and the dredger 5 is moved along an arc of a circle whose radius is section 1 of the open-pit slurry line located between the dredger 5 and the hinged joint 3. At the end of each penetration 12 the dredge 5 turns at 180., The development of soil in the winter period is carried out in the direction to the place of the middle of the quarry slurry line with the main slurry line 7 by reducing the length of the quarry slurry line. At the same time, sections 1 and 2 of the quarry pulpovod are placed on the ice of the open pit without pontoons. Maina is supported by periodic cutting of the ice cover in front of the dredger house 5 by the amount of its supply.
В летний период разработку грунта производ т в направлении от шарнираIn the summer, excavation is carried out from the hinge.
6 к дальней границе карьера. Дл этого последовательно наращивают карьерный пульповод.6 to the far edge of the career. For this purpose, the career pulpovod is consistently increased.
Дл обеспечени полной отработки карьера шарнирное соединение 3 перемещают лебедками 8 и 9, после чего его фиксируют и производ т дальнейшуюIn order to ensure complete mining of the quarry, the swivel 3 is moved by winches 8 and 9, after which it is fixed and further
разработку грунта.ground development.
Выемку грунта осуществл ют перемещением грунтозаборного органа земснар да 5 по замкнутому контуру 13.The excavation is carried out by moving the dredging body 5 of the dredge 5 along a closed loop 13.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874349301A SU1532666A1 (en) | 1987-12-28 | 1987-12-28 | Method of working soil by suction dredger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874349301A SU1532666A1 (en) | 1987-12-28 | 1987-12-28 | Method of working soil by suction dredger |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1532666A1 true SU1532666A1 (en) | 1989-12-30 |
Family
ID=21344594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874349301A SU1532666A1 (en) | 1987-12-28 | 1987-12-28 | Method of working soil by suction dredger |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1532666A1 (en) |
-
1987
- 1987-12-28 SU SU874349301A patent/SU1532666A1/en active
Non-Patent Citations (1)
Title |
---|
Нурок Г.А. Процессы и технологи гидромеханизации открытых горных работ. М.: Недра, 1985, с.259-261, рис. 18.5.а. ( СПОСОБ РАЗРАБОТКИ ГРУНТА ЗЕМСНАРЯДОМ * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110029696A (en) | A kind of double work pattern submarine cable ditchers | |
CN111255001A (en) | Ditching machine for water supply and drainage pipeline engineering construction | |
CA1043361A (en) | Dredging system and methods of dredging | |
SU1532666A1 (en) | Method of working soil by suction dredger | |
US4314414A (en) | Trench digging apparatus and bearing therefor | |
US3777375A (en) | Suction dredge with brush cutting attachment | |
CN110671538A (en) | Underwater laying device and method for ocean oil and gas pipeline | |
US4470720A (en) | Underwater trenching & pipelaying apparatus | |
CN210890364U (en) | Underwater laying device for ocean oil and gas pipeline | |
CN112575834A (en) | Self-walking cable burying machine under shallow sea water | |
RU2100529C1 (en) | Pipeline laying device | |
US4643613A (en) | Underwater trenching and pipe-laying devices | |
JPH02256792A (en) | Underwater mining machine | |
US4710059A (en) | Method and apparatus for simultaneous trenching and pipe laying in an arctic environment | |
EP0034857A1 (en) | Movable dredging device | |
US3867772A (en) | Method of excavating to form or enlarge a waterway | |
RU187634U1 (en) | Universal trench drill | |
CN216586731U (en) | Full-automatic super wide side ditch excavator for expressway | |
SU1452898A2 (en) | Working member of rotary trencher | |
SU941481A1 (en) | Apparatus for working flooded surface mines | |
SU1116122A1 (en) | Arrangement for forming a trench | |
SU1439182A1 (en) | Suction dredger for bottom working | |
SU118772A1 (en) | Suction Pump | |
SU546718A1 (en) | Device for underwater development of trenches under the pipeline lying on the ground | |
RU94019616A (en) | METHOD FOR DEVELOPING UNDERWATER TRANSCHEAVES AND BOTTOM-DEEPENING AND DEVICE FOR ITS IMPLEMENTATION |