SU152300A1 - The method of installation of tower cranes - Google Patents

The method of installation of tower cranes

Info

Publication number
SU152300A1
SU152300A1 SU727825A SU727825A SU152300A1 SU 152300 A1 SU152300 A1 SU 152300A1 SU 727825 A SU727825 A SU 727825A SU 727825 A SU727825 A SU 727825A SU 152300 A1 SU152300 A1 SU 152300A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mounting
boom
tower
crane
winch
Prior art date
Application number
SU727825A
Other languages
Russian (ru)
Inventor
А.И. Альперович
Original Assignee
А.И. Альперович
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.И. Альперович filed Critical А.И. Альперович
Priority to SU727825A priority Critical patent/SU152300A1/en
Application granted granted Critical
Publication of SU152300A1 publication Critical patent/SU152300A1/en

Links

Landscapes

  • Jib Cranes (AREA)

Description

Известные способы монтажа башенных кранов заключаютс  в соединении всех частей крана на уровне земли и затем подъеме его посредством монтажной стрелы, лебедки и полиспаста.The known methods of mounting tower cranes consist in connecting all parts of the crane at ground level and then lifting it by means of a boom, a winch and a polyspast.

Особенность описываемого способа состоит в том, что стрелу крана одним концом креп т к головке башни, а другим при помощи монтажной петли к верхнему концу монтажной стрелы, котора  через полиспаст соедин етс  с монтажной лебедкой. Башню вместе с противовесом , загруженным балластом, поднимают в вертикальное положение . После сн ти  монгажной петли со свисающего свободного конца стрелы последнюю при помощи стреловой лебедки поднимают в рабочее положение. Предлагаемый способ исключает верхолазные работы при загрузке противовеса балластом и сн тие монтажной петли с головки башни после ее подъема.The peculiarity of the described method is that the boom of the crane is fixed at one end to the head of the tower, and the other with the help of a mounting loop to the upper end of the mounting boom, which is connected to the mounting winch through a chain hoist. The tower, together with a counterweight loaded with ballast, is raised to a vertical position. After removing the thrust loop from the hanging free end of the boom, the latter is lifted to the working position with the help of a boom winch. The proposed method eliminates climbing works when loading the counterweight with ballast and removing the mounting loop from the tower head after it is lifted.

На чертеже схематически изображен башенный кран, монтируемый по описываемому способу.The drawing shows schematically a tower crane mounted according to the described method.

Башенный кран полностью собираетс  в рабочее состо ние на земле . К нему присоедин ют противовес / с балластом и стрелу 2 со стреловым полиспастом 3, навешивают и запасовывают рабочий 4 и стреловой 5 тросы, закрепл ют грузовую обойму 6, устанавливают электроаппаратуру и выполн ют электромонтаж.The tower crane is fully assembled on the ground. A counterweight / with ballast and an arrow 2 with a jib pulley 3 are attached to it, the worker 4 and the boom 5 are hooked and stocked, the load case 6 is fixed, electrical equipment is installed and electrical installation is performed.

Башн  7 крепитс  к одной стороне портала (рамы ходовой тележки ) 8, а на другой его стороне устанавливают в монтажные проушины монтажную стрелу 9.The tower 7 is attached to one side of the portal (frame of the undercarriage) 8, and on the other side of it the mounting boom 9 is installed into the mounting lugs.

Верхний конец монтажной стрелы 9 соедин ют монтажной петлей 10 со стрелой 2 крана.The upper end of the mounting boom 9 is connected by mounting loop 10 to the boom 2 of the crane.

№ 162300- 2, -No. 162300-2, -

На рассто нии, немного превышающем длину монтажной стрелы Я устанавливают черв чную монтажную лебедку 11, на раму которой укладывают балласт 12  кор  (балластом  кор  служит балласт портала монтируемого крана). В передней части рамы лебедки // устанавливают сошник 13, который, вреза сь в грунт, преп тствует сдвигу рамы во врем  работы. На пружины рамы монтажной лебедки навешивают неподвижную обойму 14 монтажного полиспаста, а на верхний конец монтажной стрелы - подвижную обойму 15. В блоки обеих обойм запасовывают монтажный канат 16.At a distance slightly greater than the length of the mounting boom I install a worm-mounted mounting winch 11, on the frame of which the ballast is laid 12 core (the ballast of the core is the portal ballast of the mounted crane). At the front of the winch frame, a coulter 13 is installed, which, crashing into the ground, prevents the frame from shifting during operation. On the frame springs of the mounting winch, the fixed holder 14 of the mounting pulley is hung, and the movable holder 15 is fixed to the upper end of the mounting boom 15. Assembly 16 is stocked in the blocks of both holders.

При включении монтажной лебедки // монтажный полиспаст начинает сокраш;атьс , стрела 9 наклон етс  и через монтажную петлю 10 т нет за стрелу 2 весь кран до зан ти  им вертикального положени . Башню крана креп т болтами к порталу. Затем снимают со стрелы крана монтажную петлю, после чего включением стреловой лебедки 17 производ т подъем стрелы крана. Монтаж крана заканчиваетс  перекладыванием балласта с  кор  на портал. Демонтаж осуш,ествл етс  в обратной последовательности.When the mounting winch // is turned on, the mounting tackle starts cutting; the boom 9 tilts and through the mounting loop 10 t is not present for the boom 2 the whole crane until it occupies a vertical position. The crane tower was bolted to the portal. Then a mounting loop is removed from the jib of the crane, after which the jib winch 17 is turned on by lifting the jib boom. The installation of the crane ends by shifting the ballast from the core to the portal. Dismantling is dried in reverse order.

Предмет изобретени Subject invention

Способ монтажа башенных кранов, состо щий в соединении на уровне земли всех его частей и подъеме его с помош,ью монтажной стрелы , полиспаста и лебедки, отличающийс  тем, что, с целью исключени  верхолазных работ при загрузке противовеса балластом и сн ти  монтажной петли с головки башни после ее подъема, стрелу крана прикрепл ют одним концом к головке башни, а другим концом св зывают монтажной петлей с верхним концом монтажной стрелы, которую с помощью полиспаста соедин ют с монтажной лебедкой, и башню вместе с загруженным балластом противовесом поднимают в вертикальное положение, а стрелу крана после сн ти  с ее свисающего свободного конца монтажной петли поднимают в рабочее положение при помощи стреловой лебедки.The method of installation of tower cranes, consisting in connecting at the ground level of all its parts and raising it with the help of an installation boom, a polyspast and a winch, characterized in that, in order to avoid climbs when loading the counterweight with ballast and removing the mounting loop from the head the towers after its lifting, the boom of the crane is attached at one end to the head of the tower, and the other end is connected with the mounting loop to the upper end of the mounting boom, which is connected to the mounting winch with a chain hoist, and the tower with the loaded ballast vovesom raised to a vertical position, and the boom of the crane after removal of hanging with its free end in a mounting loop raised operating position by means jib winch.

SU727825A 1961-04-24 1961-04-24 The method of installation of tower cranes SU152300A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU727825A SU152300A1 (en) 1961-04-24 1961-04-24 The method of installation of tower cranes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU727825A SU152300A1 (en) 1961-04-24 1961-04-24 The method of installation of tower cranes

Publications (1)

Publication Number Publication Date
SU152300A1 true SU152300A1 (en) 1961-11-30

Family

ID=48306822

Family Applications (1)

Application Number Title Priority Date Filing Date
SU727825A SU152300A1 (en) 1961-04-24 1961-04-24 The method of installation of tower cranes

Country Status (1)

Country Link
SU (1) SU152300A1 (en)

Similar Documents

Publication Publication Date Title
CN103863972B (en) Forklift truck lifting equipment holding tool and hanging method thereof
SU152300A1 (en) The method of installation of tower cranes
CN113264458A (en) Tower crane system and method for removing attachment rod thereof
SU497384A1 (en) Working equipment for dragline excavator
CN211971577U (en) Tower crane system
SU422679A1 (en) SELF LIFT Crane
SU421614A1 (en) METHOD OF INSTALLATION OF TOWER CRANES
CN203947461U (en) Dynamic compaction machinery is from hooking device and dynamic compaction machinery
CN211470529U (en) South Pole car hoisting accessory
SU850560A1 (en) Device for erecting equipment with aid of boom crane
CN210915035U (en) Simple hoisting equipment for overhauling compound fertilizer production line equipment
SU99886A1 (en) Two-jib electric cantilever crane on rail
SU958304A1 (en) Method of mounting tower crane units
CN216235650U (en) Lifting equipment for maintenance of diesel generator in gas station
SU825450A1 (en) Arrangement for delivering into mine,hanging and replacing the ropes of hoists
RU2063375C1 (en) Load-lifting crane
SU125362A1 (en) Construction tower crane
SU1498698A1 (en) Self-erecting tower crane
SU1291535A1 (en) Method of changing cargo tackle block multiplicity factor from even to odd
CN108821089B (en) Hoist cable support that equilibrium is high for machine
SU1054264A1 (en) Method of erecting the mast of construction hoist
SU1035176A1 (en) Method of erecting upper sections of vertical structures
SU650960A1 (en) Cargo crane
SU817185A1 (en) Tower erecting method
SU72565A1 (en) Method of lifting a construction crane with a boom of variable departure