SU1502813A1 - Method of constructing survey and regime wells in uncohesive soil - Google Patents

Method of constructing survey and regime wells in uncohesive soil Download PDF

Info

Publication number
SU1502813A1
SU1502813A1 SU874250069A SU4250069A SU1502813A1 SU 1502813 A1 SU1502813 A1 SU 1502813A1 SU 874250069 A SU874250069 A SU 874250069A SU 4250069 A SU4250069 A SU 4250069A SU 1502813 A1 SU1502813 A1 SU 1502813A1
Authority
SU
USSR - Soviet Union
Prior art keywords
casing
wells
height
space
well
Prior art date
Application number
SU874250069A
Other languages
Russian (ru)
Inventor
Валентин Христофорович Мавроди
Александр Иванович Суходубов
Виктор Николаевич Щербина
Юрий Сергеевич Солодовников
Сергей Николаевич Черников
Original Assignee
Восточно-Украинский Государственный Институт Инженерно-Технических Изысканий
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Восточно-Украинский Государственный Институт Инженерно-Технических Изысканий filed Critical Восточно-Украинский Государственный Институт Инженерно-Технических Изысканий
Priority to SU874250069A priority Critical patent/SU1502813A1/en
Application granted granted Critical
Publication of SU1502813A1 publication Critical patent/SU1502813A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к горной промышленности и может быть использовано при инженерно-геологических изыскани х. Цель - снижение песковани  скважин и исключение необходимости устранени  песчаной пробки. Бурение ведут ударно-канатным способом до опробуемого интервала с одновременным креплением выбуренного пространства обсадными трубами. После восстановлени  в скважине естественного уровн  подготавливают забой скважины путем установки щебенистой подушки высотой 0,15-0,25 м в обсадных трубах в интервале опробовани . Затем фильтровую колонну в виде глухой трубы устанавливают открытым дном на предварительно подготовленный забой скважины. Пространство между обсадной трубой и фильтровой колонной засыпают гравием на высоту 0,2-0,5 м от верха щебенистой подушки. Затем обсадную колонну извлекают или поднимают до нужной глубины и в результате обнажаетс  подушка и обсыпка. Прокачка такой скважины может быть выполнена желонированием. 1 ил.The invention relates to the mining industry and can be used in engineering geological surveys. The goal is to reduce the sanding of wells and eliminate the need to remove the sand plug. Drilling is carried out by the shock-cable method to the test interval with simultaneous fastening of the drilled space with casing pipes. After the natural level has been restored in the well, downhole is prepared by installing a gravelly cushion with a height of 0.15-0.25 m in the casing in the sampling interval. Then the filter column in the form of a blind pipe is installed with an open bottom on a previously prepared bottom hole. The space between the casing and the filter column is covered with gravel to a height of 0.2-0.5 m from the top of the gravelly pillow. The casing is then removed or raised to the desired depth, and as a result, the pad and dusting are exposed. The pumping of such a well can be done by zoning. 1 il.

Description

Изобретение относитс  к области горной промышленности и может быть использовано при инженерно-геологических изыскани х, в частности при оборудовании наблюдательных и режимных скважин.The invention relates to the field of the mining industry and can be used in engineering geological surveys, in particular in the equipment of observation and regime wells.

Цель изобретени  - снижение пес- ковани  скважин и исключение необходимости устранени  песчаной пробки.The purpose of the invention is to reduce sanding of wells and eliminate the need to remove the sand plug.

На чертеже изображен технологический разрез наблюдательной скважины.The drawing shows a technological section of the observation well.

Способ заключаетс  в следующем.The method is as follows.

Скважина в несв зных грунта проводитс  ударно-:;а11атным способом с одновременным креплением выбуренного пространства обсадными трубами 1. Бурение продолжаетс  до опробуемого интервала , расположенного ниже уровн A well in non-contiguous soil is conducted in a percussive -:; method in a simultaneous manner with simultaneous fastening of the drilled-out space by casing 1. Drilling continues up to the test interval located below the level

грунтовых вод (УГВ). При этом забой скважины находитс , как правило, внутри обсадных труб в интервале опробовани  .groundwater (GWL). In this case, the bottom hole is, as a rule, inside the casing in the sampling interval.

315315

После восстановлени  в скважине естественного уровн  воды производ т подготовку забо  путем чистки забо  и установки щебенистой подушки 2, дл  чего в обсадную трубу засьшают щебень (можно гравий) дл  оборудовани  равномерного сло  высотой О,15- 0,25 м. После этого подушку трамбуют ударной штангой. При наличии в обсад ной колонне песчаной пробки обсадные трубы 1 поддерживают до подошвы подушки. За тем производ т сборку и спуск на направл ющих фонар х фильтровой колонны 3, котора  состоит из глухой трубы, и устанавливают ее открытым дном 4 на предварительно подготовленный забо11. Пространство между обсадной трубой и фильтровой КОЛОМНОЙ засыпают гравием или щебнем 5 на высоту 0,2-0,5 м от верха щебенистой подушки 2. После этого обсадную колонну извлекают или подымают до нужной глубины, в результате чего обнажаетс  подушка и обсыпка. Прокач ка такой скважины может быть выполнена желонированием, т.е. без применени  дополнительного оборудовани  ввиду низкого значени  величины фильAfter the natural water level is restored in the well, the bottom is prepared by cleaning the bottom and installing a gravelly pad 2, for which rubble is crushed (gravel possible) to equip an even layer with a height O, 15-0.25 m. After that, the pad is tamped with a shock barbell. In the presence of a sand plug in the casing string, the casing 1 is supported to the bottom of the cushion. Then, they are assembled and lowered on the guide lamps of the filter string 3, which consists of a blind pipe, and are installed with an open bottom 4 on a previously prepared bottom. The space between the casing and the filter KOLOMNAYA is covered with gravel or gravel 5 to a height of 0.2-0.5 m from the top of the rubble cushion 2. Thereafter, the casing is extracted or raised to the desired depth, resulting in a pad and spraying. Bleeding such a well can be done by zoning, i.e. without the use of additional equipment due to the low value of fil

3.43.4

трационного сопротивлени  по характеру вскрыти  пласта.formation resistance of the formation.

Q 5 Q 5

Claims (1)

с Формула изобретени with formula of invention Q 5 Q 5 Способ оборудовани  наблюдательных и режимных скважин в несв зных грунтах, включающий бурение ударно- канатным способом с однов ременным креплением выбуренного пространства обсадными трубами и установку фильтровой колонны, отличающий- с   тем, что, с целью снижени  пес- кова  скважин и исключени  необходимости устранени  песчаной пробки, бурение ведут до опробуемого интервала и после восстановлени  в скважине естественного уровн  подготавливают забой скважины путем установки щебенистой подушки высотой 0,15-0,25 м в обсадных трубах в интервале опробовани , после чего фильтровую колонну в виде глухой трубы устанавливают открытым дном на предварительно подготовленный забой скважины, а пространство между обсадной трубой и фильтровой колонной засыпают гравием на высоту 0,2-0,5 м.A method of equipping observation and modular wells in non-interconnected soils, including drilling by a shock-cable method with simultaneous fastening of the drilled space with casing pipes and installing a filter string, in order to reduce the sand wells and eliminate the need to remove the sand plug , drilling is carried out to the interval being tested, and after the natural level has been restored in the well, the bottom hole is prepared by installing a rubble cushion with a height of 0.15-0.25 m in the casing in and sampling interval, then The filter column as a hollow tube mounted on the open bottom preformed hole bottom, and the space between the casing string and a filter gravel is filled to a height of 0.2-0.5 m. 5five 00 УГВGWL угвugw
SU874250069A 1987-04-13 1987-04-13 Method of constructing survey and regime wells in uncohesive soil SU1502813A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874250069A SU1502813A1 (en) 1987-04-13 1987-04-13 Method of constructing survey and regime wells in uncohesive soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874250069A SU1502813A1 (en) 1987-04-13 1987-04-13 Method of constructing survey and regime wells in uncohesive soil

Publications (1)

Publication Number Publication Date
SU1502813A1 true SU1502813A1 (en) 1989-08-23

Family

ID=21306285

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874250069A SU1502813A1 (en) 1987-04-13 1987-04-13 Method of constructing survey and regime wells in uncohesive soil

Country Status (1)

Country Link
SU (1) SU1502813A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторбкое свидетельство СССР № 874991, кл. Е 21 В 43/08, 1979. Лебедев А.В. Методы изучени баланса грунтовых вод.-М.: Недра, 1976. *

Similar Documents

Publication Publication Date Title
US6719051B2 (en) Sand control screen assembly and treatment method using the same
US5197543A (en) Horizontal well treatment method
CA2522035A1 (en) Multi seam coal bed/methane dewatering and depressurizing production system
EP1461510A1 (en) A drilling method for maintaining productivity while eliminating perforating and gravel packing
US9879401B2 (en) Oil and gas well and field integrity protection system
RU2393320C1 (en) Slim hole well construction method
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
SU1502813A1 (en) Method of constructing survey and regime wells in uncohesive soil
Strauss et al. Applications of dual‐wall reverse‐circulation drilling in ground water exploration and monitoring
RU2743478C1 (en) Difficult turonian gas production method
Yare The Use of a Specialized Drilling and Ground‐Water Sampling Technique for Delineation of Hexavalent Chromium Contamination in an Unconfined Aquifer, Southern New Jersey Coastal Plain a
Storey et al. The Eakring Dukeswood oil field: an unconventional technique to describe a field’s geology
SU1701883A1 (en) Method of hole construction in gragmental inundated incoherent rocks
SU1574805A1 (en) Method of preparing borehole for testing rocks
SU1716080A1 (en) Cluster drilling method
SU1745894A1 (en) Method for cementing flow tubing
Barton Bore hole sampling of saturated uncemented sands and gravels
US4003441A (en) Method of opening carbon-bearing beds with production wells for underground gasification
SU1352061A1 (en) Method of recovering materials from underground formations
Rejepovich FEATURES OF DRILLING WELLS FOR DUAL COMPLETION
RU2165518C1 (en) Process of completion of wells
WO2023063995A1 (en) Sequestration chamber and method of construction
Graves et al. Multiple zone coal degasification potential in the Warrior coal field of Alabama
SU1550116A1 (en) Method of investigating formation in multiple-bore wells with no overflow
Deryaev DEVELOPMENT OF WELL DESIGNS FOR THEIR DUAL COMPLETION