SU1454974A1 - Walking forms for constructing mine working supports - Google Patents

Walking forms for constructing mine working supports Download PDF

Info

Publication number
SU1454974A1
SU1454974A1 SU853841974A SU3841974A SU1454974A1 SU 1454974 A1 SU1454974 A1 SU 1454974A1 SU 853841974 A SU853841974 A SU 853841974A SU 3841974 A SU3841974 A SU 3841974A SU 1454974 A1 SU1454974 A1 SU 1454974A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pallet
formwork
concrete
ring
brackets
Prior art date
Application number
SU853841974A
Other languages
Russian (ru)
Inventor
Геннадий Семенович Бузов
Павел Павлович Бессолов
Юрий Яковлевич Афанасенко
Владимир Валентинович Зотов
Original Assignee
Центральный научно-исследовательский и проектно-конструкторский институт проходческих машин и комплексов для угольной, горной промышленности и подземного строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Центральный научно-исследовательский и проектно-конструкторский институт проходческих машин и комплексов для угольной, горной промышленности и подземного строительства filed Critical Центральный научно-исследовательский и проектно-конструкторский институт проходческих машин и комплексов для угольной, горной промышленности и подземного строительства
Priority to SU853841974A priority Critical patent/SU1454974A1/en
Application granted granted Critical
Publication of SU1454974A1 publication Critical patent/SU1454974A1/en

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

Изобретение относитс  к горному делу. Цель - повышение качества возведенной крепи, а также увеличение темпов проходки. Шагакмца  опалубка включает св занные одна с другой секции 1, механизм 2 отрыва секций 1 от бетона, гидродомкраты (ГД) 3 перемещени  и поддон 4. На поддоне 4 жестко смонтировано формующее кольцо 5, шарнирно соединенное посредством кронштейнов 6 со штоками ГД 3. Рабоча  поверхность кольца 5 выполнена в виде усеченного конуса, обращенного вершиной к забою. По достижении бетоном проектной прочности штоки ГД 3 вьщвигаютг. с , перемеща  поддон 4 с кольцом 5, которое срезает оставленную берму 7 и оконтуривает стенки проходимого ствола. 1 ил. (ЛThe invention relates to mining. The goal is to improve the quality of the erected lining, as well as an increase in the rate of penetration. Shakaktsa formwork includes interconnected section 1, mechanism 2 for separating sections 1 from concrete, hydraulic jacks (HD) 3 displacements and pallet 4. On the drain pan 4 is fixedly mounted a forming ring 5 pivotally connected by means of brackets 6 to the stems of the HD 3. Working surface ring 5 is made in the form of a truncated cone, facing apex to the bottom. When the concrete reaches the design strength, the rods of the DG 3 push out. c, moving the pallet 4 with the ring 5, which cuts off the left berm 7 and contours the walls of the passable trunk. 1 il. (L

Description

Изобретение относится к горному делу и может быть использовано при возведении крепи горных выработок, например наклонных и вертикальных. $The invention relates to mining and can be used in the construction of lining of mine workings, for example, inclined and vertical. $

Цель изобретения - повышение качества возводимой крепи, а также увеличение темпов проходки.The purpose of the invention is improving the quality of the constructed lining, as well as increasing the rate of penetration.

На чертеже показана предлагаемая опалубка, вертикальный разрез. эд Шагающая опалубка для возведения крепи горных выработок содержит секции 1, механизм 2 отрыва секций от бетона, гидродомкраты 3 перемещения и поддон 4, на котором жестко эд смонтировано формующее кольцо 5, снабженное кронштейнами 6, шарнирно связанными со штоками гидродомкратов 3 перемещения, причем рабочей поверхности формующего кольца 5 при- 2θ дана форма усеченного конуса, обращенного вершиной к забою.The drawing shows the proposed formwork, a vertical section. ed Walking formwork for erecting supports for mine workings contains sections 1, a mechanism 2 for tearing the sections from concrete, hydraulic rams 3 for moving and a pallet 4 on which the forming ring 5 is rigidly mounted, equipped with brackets 6 pivotally connected to the rods of hydraulic rams 3 for moving, and the working surface the forming ring 5 at - 2 θ is given the shape of a truncated cone, with its vertex facing the bottom.

Работают с опалубкой следующим образом.Work with formwork as follows.

После.образования котлована глу- 25 биной, равной высоте опалубки, последнюю монтируют на забое. Для этого собирают поддон 4 с кронштейнамиAfter the foundation pit is formed with a depth equal to the formwork height, the latter is mounted on the bottom. To do this, collect pallet 4 with brackets

6. На поддон 4 устанавливают отдель ные секции 1 и соединяют их между jq собой. Далее монтируют на опалубке гидродомкраты 3 перемещения, штоки которых шарнирно соединяются с кронштейнами 6. После этого бетонируют воротник ствола, По окончании укладки бетона производят выемку по- 35 роды известными.средствами на полную заходку, при этом по периметру ствола оставляется берма 7 шириной 200300 мм, воспринимающую через поддон вес опалубки,. По достижении бето- 40 ном проектной прочности подается под давлением масло в гидродомкраты 3 перемещения, их штоки выдвигаются, перемещая поддон 4 с формующим кольцом 5, которое срезает берму 7 и оконтуривает стенки проходимого ство ла. После перемещения поддона 4 на высоту опалубки секции 1.открывают от бетона при помощи механизма 2, и опалубка при этом зависает на гидродомкратах 3 перемещения. При снятии давления в последних опалубка под действием собственного веса опускается на поддон 4 и центрируется, после чего производится укладка бетона.6. Separate sections 1 are installed on the pallet 4 and connect them between jq. Then, hydraulic displacements 3 are mounted on the formwork, the rods of which are pivotally connected to the brackets 6. After that, the barrel collar is concreted. At the end of the concrete laying, 35 rocks are excavated using known tools for full penetration, while a berma 7 of 200,000 mm width is left along the perimeter of the barrel. perceiving through the pallet the weight of the formwork. Upon reaching concrete design strength, oil is supplied under pressure to hydraulic displacement jacks 3 under pressure, their rods are extended, moving the sump 4 with the forming ring 5, which cuts the berm 7 and outlines the walls of the passageway. After moving the pallet 4 to the height of the formwork, the sections 1. are opened from concrete using the mechanism 2, and the formwork hangs on the hydraulic jacks 3 of the movement. When relieving pressure in the latter, the formwork, under the influence of its own weight, is lowered onto the pallet 4 and centered, after which concrete is laid.

Далее цикл повторяется.Next, the cycle repeats.

Технико-экономические преимущества изобретения заключаются в том, что, сокращая ручные операции по разработке бермы и оконтуриванию стен ствола, шагающая опалубка по-, зволяет увеличить темпы проходки до 1,5 м в смену, вместо 1 м известными опалубками,.т.е, при средней глубине ствола.40 м в год известными опалубками можно пройти около 256 м, а новой опалубкой - 384 м или 148 м больше. При стоимости проходки 1 м ствола диаметром 5,5 в свету 400 руб это составит 400 х х 128 = 51200 руб.The technical and economic advantages of the invention are that, by reducing the manual operations for developing a berm and contouring the barrel walls, the walking formwork allows to increase the rate of penetration up to 1.5 m per shift, instead of 1 m known formwork, i.e. with an average trunk depth of 40 m per year, well-known formwork can cover about 256 m, and a new formwork - 384 m or 148 m more. With the cost of driving 1 m of a trunk with a diameter of 5.5 in the light of 400 rubles, this will be 400 x x 128 = 51200 rubles.

Claims (1)

Формула изобретения·:Claim·: Шагающая опалубка для возведения крепи горных выработок, включающая связанные одна с другой секции, механизм отрыва секций от бетона, гидродомкраты перемещения и поддон, отличающаяся тем, что, с целью повышения качества возводимой крепи, а также увеличения темпов проходки, поддон снабжен жестко смонтированным на нем формующим кольцом, которое посредством кронштейнов шарнирно соединено' со штоками гидродомкратов перемещения, причем рабочая поверхность, формующего кольца выполнена в виде усеченного конуса, обращенного вершиной к забою.Walking formwork for erecting lining of mine workings, including sections connected to one another, a mechanism for tearing sections from concrete, hydraulic rams and a pallet, characterized in that, in order to improve the quality of the erected lining, as well as to increase the rate of penetration, the pallet is equipped with a rigidly mounted one a forming ring, which is pivotally connected by means of brackets' to the rods of the hydraulic rams, the working surface of the forming ring being made in the form of a truncated cone with its apex facing the bottom.
SU853841974A 1985-01-14 1985-01-14 Walking forms for constructing mine working supports SU1454974A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853841974A SU1454974A1 (en) 1985-01-14 1985-01-14 Walking forms for constructing mine working supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853841974A SU1454974A1 (en) 1985-01-14 1985-01-14 Walking forms for constructing mine working supports

Publications (1)

Publication Number Publication Date
SU1454974A1 true SU1454974A1 (en) 1989-01-30

Family

ID=21157919

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853841974A SU1454974A1 (en) 1985-01-14 1985-01-14 Walking forms for constructing mine working supports

Country Status (1)

Country Link
SU (1) SU1454974A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Булычев Н.С. и др. Крепь вертикальных .стволов шахт. К.: Недра, 1977. с.77-80. *

Similar Documents

Publication Publication Date Title
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
CN107059877A (en) Basis and its construction method of the bottom with chain knife during a kind of construction
US4929123A (en) Method for building large span tunnels by means of a cellular arch
CN106760620A (en) A kind of utilization open caisson increases the construction method for building the underground space under existing building
CN117721840A (en) Full-mechanized construction assembly type subway station and construction method
CN114164861A (en) Construction method for underground building composed of wall-sinking foundation
CN105862897A (en) Original-groove casting construction method for shallow foundation of sandy mudstone foundation
SU1454974A1 (en) Walking forms for constructing mine working supports
CN217630086U (en) Enclosure system shared by cast-in-place pipe gallery and box type tunnel
US4422798A (en) Process for construction of an underground structure and the structure thus obtained
CN1046784C (en) Reverse sinking construction method for mine vertical shaft
CN205591230U (en) Prefabricated assembly underground continuous wall construction equipment and construction assembly
CN105672354B (en) Cast-in-place ground-connecting-wall and cast-in-place metro station construction integral method
CN112942377A (en) Novel support shear-resistant structure and construction method thereof
CN105735349A (en) Cast-in-situ bored pile and cast-in-situ subway station integrated construction method
CN105756090B (en) Cast-in-situ bored pile and assembled metro station construction integral method
SU958600A1 (en) Foundation for buildings erected in earthquake-prone areas
SU1654585A2 (en) Walking sheathing for lining of workings
US2164003A (en) Method of building subterranean structures
SU1064006A1 (en) Method of preparing mine working to its traversing by mine machinery set
RU1809082C (en) Method of construction vertical openings
SU1689521A1 (en) Method for construction of open caisson
SU417575A1 (en)
SU670682A1 (en) Drainage curtain erecting method
SU1564275A1 (en) Method of constructing deep laid underground station on its operative line