SU138877A1 - Method of laying reinforced concrete pillars on a railway platform - Google Patents
Method of laying reinforced concrete pillars on a railway platformInfo
- Publication number
- SU138877A1 SU138877A1 SU689496A SU689496A SU138877A1 SU 138877 A1 SU138877 A1 SU 138877A1 SU 689496 A SU689496 A SU 689496A SU 689496 A SU689496 A SU 689496A SU 138877 A1 SU138877 A1 SU 138877A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- reinforced concrete
- railway platform
- laying
- concrete pillars
- laying reinforced
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
Известны способы укладки железобетонных опор на железнодорожную платформу, при которых на каждую опору надевают бандажи и при штабелировании опор бандажи верхних р дов кладут на бандажи нижележащих р дов. Однако нрн применении таких способов затруднена строповка.There are known methods for laying reinforced concrete piers on a railway platform, in which bandages are put on each pillar and, when stacking pillars, the upper rows are put on the bandages of the lower rows. However, the use of such methods is difficult for srn.
В описываемом способе дл возможности строповки, увеличени количества р дов в штабеле и сохранности опор при перевозке на них надевают разъемные бандажи, полукольца которых ст гивают на опоре болтами, а в зазор между внутренней поверхностью бандажа и опорой вставл ют клинь .In the described method, in order to be able to sling, increase the number of rows in the stack and the safety of the supports, they are put on detachable bands, the half rings of which are bolted on the support, and a wedge is inserted into the gap between the inner surface of the bandage and the support.
На фиг. 1 изображен бандаж; на фиг. 2 - схема укладки опор на железнодорожную платформу.FIG. 1 shows a bandage; in fig. 2 - scheme of laying the supports on the railway platform.
Способ укладки железобетонных опор на железнодорожную платформу состоит в том. что на опору / непосредственно после ее расформовки надевают бандажи 2, состо щие из двух полуколец 3 и 4, ст гиваемых на опоре / болтами 5, с последующим расклиниванием. Укладку опор на платформу 6 ведут таким образом, чтобы бандажи верхних р дов легли на бандажи нижних р дов, причем выступы 7 бандажей вошли в соответствующие впадины 8. После этого производ т крепление бандажей 2 между собой болтами 9 и Н1табел 10 опор от продольного V: поперечного с.мещени .The method of laying reinforced concrete pillars on a railway platform is. that on the support / directly after its unforming they wear bandages 2, consisting of two half-rings 3 and 4, which are attached to the support / bolts 5, followed by wedging. Laying the supports on the platform 6 is carried out in such a way that the upper rows of tires lie on the lower rows of tires, and the projections 7 of the tires enter the corresponding depressions 8. Thereafter, the tires 2 are fixed to each other with bolts 9 and H1 of the 10 supports from the longitudinal V: transverse displacement.
Описываемый способ укладки опор позвол ет улучшить организацию погрузки и выгрузки их за счет упрощени строповки и повысить технику безопасности, обеспечить сохранность опор при транспортировке и хранении, а также более полно загружать железнодорожные платформы. Так, например, вместо 12 опор длиной 22 м кажда , которые раньше перевозились сцепом из двух шестидес титонных платформ , при применении этого способа можно транспортировать 18, т. е. на одну треть больше.The described method of laying the supports improves the organization of loading and unloading them by simplifying slinging and enhancing safety, ensuring the safety of supports during transportation and storage, as well as more fully load railway platforms. So, for example, instead of 12 pillars 22 m long each, which were previously transported by a clutch of two six hundred titon platforms, 18 can be transported using this method, i.e. one third more.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU689496A SU138877A1 (en) | 1960-12-17 | 1960-12-17 | Method of laying reinforced concrete pillars on a railway platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU689496A SU138877A1 (en) | 1960-12-17 | 1960-12-17 | Method of laying reinforced concrete pillars on a railway platform |
Publications (1)
Publication Number | Publication Date |
---|---|
SU138877A1 true SU138877A1 (en) | 1961-11-30 |
Family
ID=48295001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU689496A SU138877A1 (en) | 1960-12-17 | 1960-12-17 | Method of laying reinforced concrete pillars on a railway platform |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU138877A1 (en) |
-
1960
- 1960-12-17 SU SU689496A patent/SU138877A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES164208Y (en) | DETACHABLE ARMOR FOR STORING LOADS ARRANGED ON PALLETS OR SIMILAR PLATFORMS. | |
US3032851A (en) | Apparatus for making and stacking concrete blocks | |
SU138877A1 (en) | Method of laying reinforced concrete pillars on a railway platform | |
GB265549A (en) | Improvements in or connected with the loading of rod-like objects | |
GB1343042A (en) | Vessel transportation lift truck | |
SE7606390L (en) | SHIPS FOR TRANSPORT OF CONTAINERS EL DYL | |
GB804743A (en) | Improvements in or relating to guide rails for elevators, hoists, lifts and the like | |
ES401703A1 (en) | Collapsible bridge game | |
US2355931A (en) | Unit loq handling equipment | |
SU117314A1 (en) | Device for transporting seaplanes from the water to the shore and back | |
SU139246A1 (en) | Crushing device | |
SU64667A1 (en) | Self-unloading trolley with tilting platform | |
JPS5247289A (en) | Steel block handling method for steel block carrier ships | |
FR2242869A5 (en) | Crane transport chassis for a truck - plates with cut-outs form outrigger guides on U-beam chassis | |
SU141595A1 (en) | Lightweight cast iron carrier with a 50 t bucket | |
SU76271A1 (en) | Trolley for tractor skidding | |
SU138176A1 (en) | Self propelled forklift | |
SU106392A1 (en) | The method of mixed laying of round wood on timber trucks, dump trucks with side racks | |
SU134196A1 (en) | Grid for transporting piece goods | |
FR1506805A (en) | System and equipment for transporting and launching prefabricated beams for bridges, viaducts and other structures | |
GB537560A (en) | Improvements in and relating to reinforced concrete piled piers | |
FR2247418A1 (en) | Single or multi-section boat lifting platform - has torsion girder member solidly secured between cross-members to spread load | |
SU44488A1 (en) | Pitfall | |
SU64291A1 (en) | Device berths, bridges, etc. structures | |
SU111569A1 (en) | Collapsible pier |