SU1337454A1 - Method of joining the sections of floated-on structures - Google Patents

Method of joining the sections of floated-on structures Download PDF

Info

Publication number
SU1337454A1
SU1337454A1 SU853987448A SU3987448A SU1337454A1 SU 1337454 A1 SU1337454 A1 SU 1337454A1 SU 853987448 A SU853987448 A SU 853987448A SU 3987448 A SU3987448 A SU 3987448A SU 1337454 A1 SU1337454 A1 SU 1337454A1
Authority
SU
USSR - Soviet Union
Prior art keywords
sections
docking
hooks
space
embedded
Prior art date
Application number
SU853987448A
Other languages
Russian (ru)
Inventor
Василий Иванович Дробков
Original Assignee
Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука filed Critical Ленинградское отделение Всесоюзного проектно-изыскательского и научно-исследовательского института "Гидропроект" им.С.Я.Жука
Priority to SU853987448A priority Critical patent/SU1337454A1/en
Application granted granted Critical
Publication of SU1337454A1 publication Critical patent/SU1337454A1/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Revetment (AREA)

Abstract

Изобретение относитс  к области гидротехнического строительства.Целью изобретени   вл етс  удешевление и повышение надежности стыковки при работе на просадочных грунтах. При изготовлении секций 1 и 2 наплавной конструкции в стенах закладывают крюки 3. После установки наплавной конструкции на дно на крюки 3 навешивают битумматы 4 в два сло  и соединительную плиту 5. Соединительную плиту 5 подвешивают на паз 6, который позвол ет свободное движение крюка подвеса при пере- меш,ении секций 1 и 2 относительно друг друга. Соединительные плиты 5 навешивают с зазором, необходимым дл  перемещени  в вертикальном направлении плит 5. Пространство между секци ми 1 и 2 залито водой , засыпают в воду по кра м щебень, затем песок и в середине засыпают глинобетоном . При такой засыпке образуют обратный фильтр, который обеспечивает герметичность стыка и его подвижность. 5 ил. 9 (Л оо со N ел N фи5.4The invention relates to the field of hydraulic engineering construction. The purpose of the invention is to reduce the cost and increase the reliability of the docking when working on subsiding soils. In the manufacture of sections 1 and 2 of the floating structure, hooks 3 are laid in the walls. After installing the floating structure, hooks 3 are hung on the bottom of the bitumen 4 in two layers and the connecting plate 5. The connecting plate 5 is suspended on the groove 6, which allows the free movement of the hook when mixing, sections 1 and 2 relative to each other. The connecting plates 5 are hung with a gap necessary to move the plates 5 in the vertical direction. The space between sections 1 and 2 is filled with water, poured into the water along the edges of the rubble, then the sand and in the middle is covered with earthen concrete. With this backfill form a reverse filter, which provides the tightness of the joint and its mobility. 5 il. 9 (L oo with N ate N ph5

Description

Изобретение относитс  к гидротехническому строительству, а именно к технологии стыковки наплавных конструкций камер шлюзов или любых других многосекционных гидротехнических сооружений нанлавного исполнени .The invention relates to hydraulic engineering, in particular, to the technology of joining the floating structures of lock chambers or any other multi-section hydraulic structures of nlavlnoy execution.

Целью изобретени   вл етс  удешевление и повышение надежности стыковки при работе на посадочных грунтах.The aim of the invention is to reduce the cost and increase the reliability of the docking when working on planting soils.

мешении секций 1 и 2 относительно друг друга.mixing of sections 1 and 2 relative to each other.

Соединительные плиты 5 навешивают с зазором 7, необходимым дл  перемеш,ени  в вертикальном направлении плит 5. Пространство между секци ми 1 и 2 залито водой, засыпают в воду по кра м щебень, затем песок и в середине - глинобетон. При такой засыпке образуетс  обратный фильтр.The connecting plates 5 are hung with a gap of 7, which is necessary for mixing, in the vertical direction of the plates 5. The space between sections 1 and 2 is filled with water, poured into the water along the edges of the gravel, then sand and in the middle - clay concrete. With such a backfill, a reverse filter is formed.

который обеспечивает герметичность стыка иwhich ensures the tightness of the joint and

На фиг. 1 показан план стыка двух Ю его подвижность, секций наплавных конструкций; на фиг. 2 - соединительна  плита, план; на фиг. 3 - разрез А-А на фиг. 2; на фиг. 4 - узел 1 на фиг. 1; на фиг. 5 - разрез Б - Б на фиг. 1.FIG. 1 shows the plan of the junction of two Yu its mobility, sections of floating structures; in fig. 2 - connecting plate, plan; in fig. 3 shows section A-A in FIG. 2; in fig. 4 — node 1 in FIG. one; in fig. 5 - section B - B in FIG. one.

Предлагаемый способ осушествл ют следующим образом.The proposed method is carried out as follows.

1515

Claims (1)

Формула изобретени  Способ стыковки секций наплавных конструкций , включающий заделку в секции закладных соединительных элементов и заполнение пространства между секци ми, отличающийс  тем, что, с целью удешевлени  и повышени  надежности стыковки при работе на просадочных грунтах, на закладные соединительные элементы, которые выФормула изобретени  Способ стыковки секций наплавных конструкций , включающий заделку в секции закладных соединительных элементов и заполнение пространства между секци ми, отличающийс  тем, что, с целью удешевлени  и повышени  надежности стыковки при работе на просадочных грунтах, на закладные соединительные элементы, которые выПри изготовлении секций 1 и 2 наплавной конструкции в их стенах закладывают крюки 3. После установки наплавной кон- 20 полн ютс  в виде крюков, навешивают поClaims method of docking sections of floating structures, including embedding in the sections embedded mortars and filling the space between sections, characterized in that, in order to reduce the cost and improve the reliability of the dock when working on subsurface soils, mortgaged connecting elements that the Formula of the Inner Docking Method sections of floating structures, including embedding in sections of embedded fasteners and filling the space between sections, characterized in that lowering and improving the reliability of the docking when working on subsiding soils, hooks 3 are laid on the embedded fitting elements that, when producing sections 1 and 2 of the floating structure, in their walls are filled in the form of hooks, струкции на дно на крюки 3 навешиваютвертикали, череду  битумматы и железобебитумматы 4 в два сло  и соединитель-тонные плиты с зазором относительно другStructures on the bottom of the hooks 3 hang verticals, a series of bitumen and ferro-bitumenate 4 in two layers and connector-ton plates with a gap relative to each other ную плиту 5. Соединительную плиту 5 под-друга, после чего заполнение пространстваslab 5. Connecting plate 5 sub-friend, then filling the space вешивают за паз 6, который позвол етмежду секци ми производ т последовательноhanged over groove 6, which allows the sections to be made in series свободно перемещать крюк подвеса при перещебнем, песком и глинобетоном.free to move the suspension hook when crushed, sand and clay concrete. мешении секций 1 и 2 относительно друг друга.mixing of sections 1 and 2 relative to each other. Соединительные плиты 5 навешивают с зазором 7, необходимым дл  перемеш,ени  в вертикальном направлении плит 5. Пространство между секци ми 1 и 2 залито водой, засыпают в воду по кра м щебень, затем песок и в середине - глинобетон. При такой засыпке образуетс  обратный фильтр.The connecting plates 5 are hung with a gap of 7, which is necessary for mixing, in the vertical direction of the plates 5. The space between sections 1 and 2 is filled with water, poured into the water along the edges of the gravel, then sand and in the middle - clay concrete. With such a backfill, a reverse filter is formed. его подвижность, his mobility Формула изобретени  Способ стыковки секций наплавных конструкций , включающий заделку в секции закладных соединительных элементов и заполнение пространства между секци ми, отличающийс  тем, что, с целью удешевлени  и повышени  надежности стыковки при работе на просадочных грунтах, на закладные соединительные элементы, которые выполн ютс  в виде крюков, навешивают поClaims The method of docking sections of floating structures, including embedding in the sections embedded mortars and filling the space between the sections, characterized in that, in order to reduce the cost and improve the reliability of the docking when working on subsurface soils, embedded mortars that are in the form hooks, hang on сриг.1srig.1 А -АA-A фигЗfigs сриеsrie Составитель В. КазаковCompiled by V. Kazakov Редактор Н Швыдка Техред И. ВересКорректор Е. РошкоEditor N Shvydka Tehred I. VeresKorrektor E. Roshko Заказ 4100/25Тираж 606ПодписноеOrder 4100/25 Circulation 606 Subscription ВНИИПИ Государственного комитета СССР по делам изобретении и открытииVNIIPI USSR State Committee for Invention and Discovery 113035, Москва, Ж-35, Раушска  наб., д. 4/5 Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4113035, Moscow, Zh-35, Raushsk nab. 4/5 Production and printing company, Uzhgorod, ul. Project, 4
SU853987448A 1985-12-04 1985-12-04 Method of joining the sections of floated-on structures SU1337454A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853987448A SU1337454A1 (en) 1985-12-04 1985-12-04 Method of joining the sections of floated-on structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853987448A SU1337454A1 (en) 1985-12-04 1985-12-04 Method of joining the sections of floated-on structures

Publications (1)

Publication Number Publication Date
SU1337454A1 true SU1337454A1 (en) 1987-09-15

Family

ID=21209124

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853987448A SU1337454A1 (en) 1985-12-04 1985-12-04 Method of joining the sections of floated-on structures

Country Status (1)

Country Link
SU (1) SU1337454A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Защита Ленинграда от наводнений. Технический проект. М.: Гидропроект. 1982, Чертеж № 1189-11-2. *

Similar Documents

Publication Publication Date Title
SU1337454A1 (en) Method of joining the sections of floated-on structures
RU2496943C1 (en) Combined frame-raft foundation for low height construction on soft soil
JP4410572B2 (en) Construction method of revetment for landfill
JPS63233120A (en) Foundation work for wooden building
US5189855A (en) Foundation raft for supporting a structure
JPH045331A (en) Method for constructing foundation
SU1303665A1 (en) Arrangement for consolidating soil of plain earth structure
RU2036286C1 (en) Method for erecting a wall
SU1337459A1 (en) Method of producing blocks for hydraulic structures
SU1465472A1 (en) Method of working water-saturated weak loose materials
SU1052625A1 (en) Method of constructing a cast-in-place injector pile
SU386068A1 (en)
RU1805168C (en) Foundation
CN217950387U (en) Assembled tunnel bottom structure capable of replacing inverted arch for filling water-rich stratum
KR200242401Y1 (en) Grounding stone
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU749977A1 (en) Method of erecting prefabricated ferroconcrete multilevel wall in earth
SU1689521A1 (en) Method for construction of open caisson
SU1027312A1 (en) Method of erecting cellular retaining structures on hard rock beds
SU1645532A1 (en) Method of sinking dropshaft into stratified soil
SU1707155A1 (en) Building block
SU1527369A1 (en) Prefabricated dam
SU1308700A1 (en) Ship lock
SU1052609A1 (en) Made-up boom
SU1213126A1 (en) Method of hydraulic insulation of test site for investigating salt transfer parameters