SU1052609A1 - Made-up boom - Google Patents
Made-up boom Download PDFInfo
- Publication number
- SU1052609A1 SU1052609A1 SU823461308A SU3461308A SU1052609A1 SU 1052609 A1 SU1052609 A1 SU 1052609A1 SU 823461308 A SU823461308 A SU 823461308A SU 3461308 A SU3461308 A SU 3461308A SU 1052609 A1 SU1052609 A1 SU 1052609A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- block
- consumption
- materials
- concrete slabs
- plate
- Prior art date
Links
Landscapes
- Revetment (AREA)
Abstract
СБОРНАЯ 1ЮРСКАЯ БУНА, содержаща объемные блоки с заполненными грунтом внутренними полост ми, о тличающа с тем, что, с целью упрощени технологии возведени и сокращени расхода материалов, .каждый блок выполнен с угловыми стойками , между которыми по внутреннему контуру прикреплены с возможностью вертикального перемещени подвижные элементы в виде тонкостенных железобетонных плит.The 1YUR BUNNE TEAM, containing volumetric blocks with soil filled with internal cavities, is different from the fact that, in order to simplify the erection technology and reduce the consumption of materials, each block is made with corner posts, between which, along the inner contour, movable elements in the form of thin-walled reinforced concrete slabs.
Description
mmm 1 I Н || 11« 1| I mmm 1 I H || 11 «1 | I
гg
./ Г/1 i/if г| I ч ,: И ||liII и ии1| II 11и1| л Jiи1 Изобретение отн- ситс к 1идроте ническому строительству, а именно к строительству морских берегозащитных сооружений. Известна конструкци бун из ма сивов на каменной постели, из мас вов на колоннах-оболочках, из же лезобетонных плит между свайными опорами Г 1. Недостатком конструкций данных бун вл етс большой расход цемен та и необходимость устройства каменной постели, а также необходимость погружени колонн-оболочек и свайных опор и планировка грунта под основание буны, что весьма затруднительно особенно в местах, где дно состоит из крупнообломочных грунтов с включeни 1И валунов, (например. Южный берег Крыма ). Наиболее близкой к предлагаемой по технической сущности вл етс сборна морска буна, включаюгца объемные блоки с заполненными грун том внутренними полост ми. Объемные блоки устанавливают на постель из твердеющих материалов t2 J Недостатком прототипа вл етс необходимость устройства постели и, кроме того, дополнительный расход цемента дл этих целей. Цель изобретени - упрощение технологии возведени сокращени расхода материалов. Указанна цель достигаетс тем что каждый блок выполнен с угловыми стойками, между которыми по внутреннму контуру прикреплены с возможностью вертикального переме щени подвижные элементы в виде тонкостенных железобетонных плит. На фиг. 1 изображен блок, вид спереди на фиг. 2 - то же, вид в плане; на фиг. 3 - узел I на фиг. 2j на фиг. 4 - блок, подготов ленный к обратной засыпке. Объемный блок 1, выполненный полым, имеет в углах нижней части четыре стойки 2, По контуру нижней части блока 1 к каждой из его внут ренних сторон прикреплены подвижные элементы 3, например, из тонко CTBHHtix железобетонных плит. Креп тс они известными способами; с помощью двух русных направл ющих, или с помоиозю Т-образных закладных деталей 4, размещенных по две штук в прорези 5 плиты 3 (фиг. З) и сос то щих из двух отрезков арматуры или любого другого профильного металла. Пор док установки плиты 3 и Тобразной закладной детали 4 следую щий. К закладной детали, имеющейс втеле блока 1, привариваетс отрезок арматуры или любого другого профильного металла (по два на каждую плиту ), устанавливают плиту 3, совмеща прорезь 5 в плите 3 с приваренными отрезками, после чего к первому отрезку перпендикул рно приваривают еще один отрезок арматуры. Таким образом, получаетс Т-образна деталь, а так как их две,, то плита 3, имеюща прорезь 5, получает возможность перемещени только в вертикальной плоскости. Длина прорези 5 ирассто ние между Т-образными закладными по вертикали подбираетс , исход из величин неровностей дна. Перед монтажом блока 1 плиты 3 фиксируютс с помощью Т-образных закладных деталей 4 и любого отрезка металла и капронового конца, прикрепленного к верху плиты 3 и верху блока 1, в крайнее верхнее положение {фиг. 1 /. Все эти операции производ т на берегу. Морскую буну собирают следующим образом. Блок 1 устанавливают в сооружение (буну), дл чего предварительно планируют морское дно только под стойки 2, а не под весь блок 1. Под остальной частью блока 1 остаютс естественные неровности дна (фиг.4/. Затем освобождают фиксаторы, выполненные из отрезка металла или капронового конца, и плита 3, перемеща сь под действием своей массы в верти- кальной плоскости, чему способствует наличие в ней прорези 5 и Т-образных закладных деталей 4, прикрепленных к блоку 1, опускаетс до ближайшего выступа дна (фиг; 4). После опускани всех плит 3, производ т заполнение внутренней полости блока местным каменным материалом. В случае, если наместе строительства имеетс песчаный грунт, то подвижные элементы с внутренней стороны прикрывают по контуру блока подводным бетоном. Предлагаема конструкци буны позвол ет сократить объем работ по планировке под основание буны и устройству каменной поехали, так как S этом случае планировку нужно будет сделать только под угловые стойки блока, а также (по сравнению с прототипом } сократить расход твердеющего материала на устройство постели , т.е„ сократит объем подволно-технических работ по устройству буны и расход материалов. ,./ Г / 1 i / if г | I h: And || liII and ii1 | II 11 and 1 | l Ji1 The invention relates to 1 hydrotechnical construction, namely to the construction of marine shore protection structures. The known structure of the bun from the masses on the stone bed, from the masses on the shell columns, from the concrete slabs between the pile supports D 1. The disadvantage of the bun data designs is the high cement consumption and the need to build a stone bed, and the need to immerse the columns shells and pile supports and ground leveling under the base of the groins, which is very difficult especially in places where the bottom consists of coarse-grained soils from 1 and boulders (for example, the southern coast of Crimea). Closest to the proposed technical entity is a group of sea buna, including large blocks with soil filled with internal cavities. Volumetric blocks are placed on a bed of hardening materials t2 J The disadvantage of the prototype is the need for a bedding device and, in addition, additional cement consumption for these purposes. The purpose of the invention is to simplify the construction technology of reducing the consumption of materials. This goal is achieved by the fact that each block is made with corner posts between which the moving parts in the form of thin-walled reinforced concrete slabs are attached with the possibility of vertical movement. FIG. 1 shows a block, front view in FIG. 2 - the same plan view; in fig. 3 shows the node I in FIG. 2j in FIG. 4 - block prepared for backfilling. Volumetric block 1, made hollow, has four pillars 2 in the corners of the lower part. Movable elements 3, for example, from thinly CTBHHtix reinforced concrete slabs, are attached to each of its inner sides. Crepe ts they are known methods; with the help of two brown guides, or with the help of T-shaped inserts 4, placed two in slot 5 of plate 3 (Fig. 3) and constituting from two segments of reinforcement or any other profile metal. The order of installation of the plate 3 and T-shaped embedded part 4 is as follows. A section of reinforcement or any other profile metal (two for each plate) is welded to the embedded part in block 1, set plate 3, aligning slot 5 in plate 3 with welded pieces, then another segment is perpendicular to the first segment fittings. Thus, a T-shaped part is obtained, and since there are two of them, the plate 3, having a slot 5, can only be moved in a vertical plane. The length of the slot 5 and the distance between the T-shaped mortgages vertically are selected, based on the values of the unevenness of the bottom. Before mounting the block 1, the plate 3 is fixed with the help of T-shaped inserts 4 and any metal segment and a nylon end attached to the top of the plate 3 and the top of block 1 to the extreme upper position {FIG. one /. All these operations are carried out on shore. Marine bun collected as follows. Block 1 is installed in the structure (bun), for which the seabed is pre-planned only under rack 2, and not under the whole block 1. Under the rest of block 1, there are natural bottom irregularities (Fig. 4 /. Then release clamps made of a piece of metal or the nylon end, and the plate 3, moving under the action of its mass in the vertical plane, which is facilitated by the presence of a slot 5 and T-shaped inserts 4 attached to the block 1, is lowered to the nearest bottom protrusion (Fig; 4) After all plates 3 are lowered, filling the internal cavity of the block with local stone material. In the event that there is sandy soil on the site, the movable elements on the inner side cover the block contour with underwater concrete. The proposed construction of the groins reduces the amount of planning work under the base of the groins and the stone unit goes like this as S, in this case, the planning will need to be done only under the corner posts of the block, as well as (compared to the prototype) to reduce the consumption of hardening material for the bed device, i.e. Atit volume of the sub-technical works on the device of the bane and consumption of materials. ,
//
гg
(put. г(put. g
Фш.ЗFZH
tlrrimnhtlrrimnh
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823461308A SU1052609A1 (en) | 1982-05-13 | 1982-05-13 | Made-up boom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823461308A SU1052609A1 (en) | 1982-05-13 | 1982-05-13 | Made-up boom |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1052609A1 true SU1052609A1 (en) | 1983-11-07 |
Family
ID=21019436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823461308A SU1052609A1 (en) | 1982-05-13 | 1982-05-13 | Made-up boom |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1052609A1 (en) |
-
1982
- 1982-05-13 SU SU823461308A patent/SU1052609A1/en active
Non-Patent Citations (1)
Title |
---|
1. Порты и портовые сооружени . Под ред. Т.Н.Смирнова. М., Стройиздат, 1979, с. 553, рис XXtV, а,б,в. 2. Авторское свидетельство СССР 791828, кл. Е 02 В 3/06, 1977 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140154012A1 (en) | Assembled mud-rock flow debris dam and construction method thereof | |
US3802205A (en) | Sea wall construction | |
JPH0756140B2 (en) | Retaining wall structure construction method and retaining wall structure | |
US4015379A (en) | In-ground swimming pool and apparatus and method for constructing same | |
US3613382A (en) | Sea wall construction | |
US4232491A (en) | Swimming pool deck | |
SU1052609A1 (en) | Made-up boom | |
JPH06146305A (en) | Underwater foundation and installation method thereof | |
US5189855A (en) | Foundation raft for supporting a structure | |
JP4410572B2 (en) | Construction method of revetment for landfill | |
JPS59150810A (en) | Coastal structure with caisson and its construction | |
CN208472649U (en) | A kind of Gravity Type Casisson Berth structure setting friction pile in foundation | |
JPH03247801A (en) | Method for road construction | |
JPS6062327A (en) | Construction of underwater continuous wall | |
SU1788151A1 (en) | Method of erecting retaining wall | |
RU2711973C1 (en) | Hydraulic structure on vertical pile base of modular structure | |
JPH11350505A (en) | Stone retaining wall | |
US2338110A (en) | Graving dry dock and method of construction | |
RU2032789C1 (en) | Mooring quay and method for its construction | |
JPH0649824A (en) | Breakwater | |
KR100543284B1 (en) | The method of constructing support wall to use as pillar and slab | |
SU1689521A1 (en) | Method for construction of open caisson | |
RU2049190C1 (en) | Method for construction of wharf embankment from spatial blocks | |
RU18718U1 (en) | VERTICAL TAPE BASE | |
SU727766A1 (en) | Retaining wall and method of erecting same |