SU129994A1 - Arochna dam - Google Patents

Arochna dam

Info

Publication number
SU129994A1
SU129994A1 SU641807A SU641807A SU129994A1 SU 129994 A1 SU129994 A1 SU 129994A1 SU 641807 A SU641807 A SU 641807A SU 641807 A SU641807 A SU 641807A SU 129994 A1 SU129994 A1 SU 129994A1
Authority
SU
USSR - Soviet Union
Prior art keywords
dam
arch
arochna
construction
passage
Prior art date
Application number
SU641807A
Other languages
Russian (ru)
Inventor
К.А. Мальцов
Original Assignee
К.А. Мальцов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by К.А. Мальцов filed Critical К.А. Мальцов
Priority to SU641807A priority Critical patent/SU129994A1/en
Application granted granted Critical
Publication of SU129994A1 publication Critical patent/SU129994A1/en

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

Известные конструкции арочных плотин требуют п.ри нроизводстке работ по их возведению предварительной пробивки строительного тоннел  дл  отвода воды и устройства перемычек, что удорожает стоимость и удлин ет сроки строительства.Known designs of arched dams require the manufacturing of works for their erection of preliminary punching of a construction tunnel for draining water and making jumpers, which increases the cost and lengthens construction time.

В предлагаемой арочной плотине этот недостаток устран етс  тем, что основанием плотины служит подплотинна  арка, включаема  в тело плотины. Отверстие арки используетс  в гУериод строительства длл пропуска воды.In the proposed arched dam, this disadvantage is eliminated by the fact that the base of the dam is a sub-arch, which is incorporated into the body of the dam. The arch hole is used in the construction of the water passage dll.

На фиг. 1 изображена арочна  плотина, вид с нижнего бьефа; на фиг- 2 - то же, в плане; на фиг. 3 - плотина в поперечном разрезе после заделки подплотинного отверсти .FIG. 1 shows an arched dam, view from the downstream; in FIG. 2 - the same in terms of; in fig. 3 - dam in cross section after the seal of the sublap hole.

Арочна  плотина 1 возводитс  на специально устраиваемом основании в виде горизонтальной арки 2, перекрывающей пусло реки. Отверстие 3 арки используетс  дл  пропуска воды в период строительства.The arch dam 1 is erected on a specially arranged base in the form of a horizontal arch 2 spanning the river bed. Hole 3 is used for the passage of water during construction.

Отметка п т подплотинной арки и ее стрела выбираютс  таким образом , чтобы пропуск воды в период строительства проходил под плотиной . Сама арочна  плотина возводитс  насухо на бетонной постели 4, выравнивающей верх подплотинной арки 2 и берегов. Во избежание передачи недопустимых больших горизонтальных нагрузок арочной плотины иа подплотипную арку верхн   плоскость 5 покрываетс  изол ционным слоем, обеспечивающим низкий коэффициент трени  (асфальтобитумные покрыти , графитова  смазка и т. п.).Mark p m of the dam arch and its arrow are chosen so that the passage of water during the construction period takes place under the dam. The arched dam itself is erected dry on a concrete bed 4, leveling the top of the dam arch 2 and the banks. In order to avoid the transfer of unacceptable large horizontal loads of the arch dam and the subplotty arch, the upper plane 5 is covered with an insulating layer providing a low coefficient of friction (asphalt-bitumen coatings, graphite grease, etc.).

По заверщению строительства плотины и дерривации, а также при необходимости водосбросных устройств производитс  перекрытие русла реки иод подплотинной аркой. .В зависимости от характера каньона и пропуска воды осуществление перекрыти  русла может быть различным: с вспомогательными кессонами, сва ми, металлическими затворами и т. д.Upon completion of the dam construction and construction, as well as the need for spillway devices, the iodine arch is blocked. . Depending on the nature of the canyon and the passage of water, the implementation of blocking of the channel may be different: with auxiliary caissons, its own, metal gates, etc.

SU641807A 1959-10-22 1959-10-22 Arochna dam SU129994A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU641807A SU129994A1 (en) 1959-10-22 1959-10-22 Arochna dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU641807A SU129994A1 (en) 1959-10-22 1959-10-22 Arochna dam

Publications (1)

Publication Number Publication Date
SU129994A1 true SU129994A1 (en) 1959-11-30

Family

ID=48401129

Family Applications (1)

Application Number Title Priority Date Filing Date
SU641807A SU129994A1 (en) 1959-10-22 1959-10-22 Arochna dam

Country Status (1)

Country Link
SU (1) SU129994A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2638186C1 (en) * 2017-03-16 2017-12-12 Акционерное общество "Проектно-изыскательский и научно-исследовательский институт "Гидропроект" им. С.Я. Жука" Method of concrete dam construction in river canyon

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2638186C1 (en) * 2017-03-16 2017-12-12 Акционерное общество "Проектно-изыскательский и научно-исследовательский институт "Гидропроект" им. С.Я. Жука" Method of concrete dam construction in river canyon

Similar Documents

Publication Publication Date Title
SU129994A1 (en) Arochna dam
GB191308799A (en) Improvements in Retaining Walls for Preventing Land Slips.
ES434509A1 (en) Improvements in the construction of pools with prefabricated concrete elements. (Machine-translation by Google Translate, not legally binding)
ES229797U (en) Shoring structure for embankments
Harrison Deglaciation and proglacial drainage: North Bay-Mattawa region, Ontario
SU104320A1 (en) Deep Reper
DK132237C (en) PROCEDURE FOR THE LAYING AND FOUNDATION OF A BUILDING CONSTRUCTION UNDER WATER AND THE MEANS OF EXERCISING THIS PROCEDURE
DK139440B (en) Method of forming a foundation for a building component in water.
SU487206A1 (en) Foundation construction method
KURIBAYASHI On the Relation between the Location of Settlements and the Types of Flood Damage in the River Basin of the Kano
SU483483A1 (en) The method of construction of water-pressure ground structures
DK133393B (en) Method for stabilizing quay walls, piers and similar water structure structures.
SU417573A1 (en)
GB364160A (en) Improved method of constructing tunnels under water, together with bridges above said tunnels
SU718533A1 (en) Weir structure
SU394498A1 (en) Footwell
SU64553A1 (en) Mounting device berets
RU99022U1 (en) HIGH GROUND WEIR
Petrov et al. Dam of the Kolyma hydroelectric power plant
SU142209A1 (en) Dam of local materials
ES379035A1 (en) Procedure of construction of a tunnel. (Machine-translation by Google Translate, not legally binding)
Coyne NEW DAM TECHNIQUES.
SU129548A1 (en) Reservoir reinforced concrete dam, mainly from prefabricated elements
DK84902C (en) Procedure for foundation of structures at great water depth.