SU1299873A1 - Ropeway installation - Google Patents

Ropeway installation Download PDF

Info

Publication number
SU1299873A1
SU1299873A1 SU853969854A SU3969854A SU1299873A1 SU 1299873 A1 SU1299873 A1 SU 1299873A1 SU 853969854 A SU853969854 A SU 853969854A SU 3969854 A SU3969854 A SU 3969854A SU 1299873 A1 SU1299873 A1 SU 1299873A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cable
load
hook
carriage
drum
Prior art date
Application number
SU853969854A
Other languages
Russian (ru)
Inventor
Иосиф Степанович Бадера
Михаил Павлович Мартынцив
Владимир Андреевич Петрушка
Original Assignee
Львовский Филиал Проектно-Конструкторского Технологического Института Министерства Лесной Промышленности Усср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Львовский Филиал Проектно-Конструкторского Технологического Института Министерства Лесной Промышленности Усср filed Critical Львовский Филиал Проектно-Конструкторского Технологического Института Министерства Лесной Промышленности Усср
Priority to SU853969854A priority Critical patent/SU1299873A1/en
Application granted granted Critical
Publication of SU1299873A1 publication Critical patent/SU1299873A1/en

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

Изобретение относитс  к канатным трелевочным установкам и может быть использовано в лесной промьш - ленности при .освоении лесов на горных склонах, в равнинных и заболоченных услови х. Цель изобретени  - повышение производительности установки путем механизированной подачи грузового крюка к месту прицепки груЮ за. Канатна  установка содержит самоходное шасси 1, несущее вертикальную мачту 6, с верхней частью которой шарнирно соединена стойка 7, -установленна  с возможностью поворота вертикальной плоскости вдоль самоходного шасси 1. Несущий канат 4 присоединен к тыловой опоре 9 и запасован через блок 10 на конце стойки 7, дополнительный блок 11 каретки 12, блок 13 на конце стойки 7 и наматываетс  на свой барабан. Т говый канат 3 (или возвратный канат) соединен с грузовым крюком 14 каретки 12 и через угловые блоки 15, 16 и 17, через блок 18 на стойке 7 наматываетс  на свой барабан 2. При этом барабан намотки несущего каната 4 расположен в створе с барабаном 2, оси их параллельны и расположены вдоль продольной оси самоходного шасси 1. 1 ил. сл JZ . .л .j-;.The invention relates to cable skidding installations and can be used in forestry in the development of forests on mountain slopes, in lowland and marshy conditions. The purpose of the invention is to increase the productivity of the installation by mechanically feeding a load hook to the attachment point for a rough load. The cable installation contains a self-propelled chassis 1, carrying a vertical mast 6, with the top 7 of which is pivotally connected to the post 7, mounted with the possibility of rotation of the vertical plane along the self-propelled chassis 1. The supporting cable 4 is attached to the rear support 9 and stocked through the block 10 at the end of the rack 7 , the additional block 11 of the carriage 12, the block 13 at the end of the stand 7 and is wound on its drum. The cable 3 (or return rope) is connected to the load hook 14 of the carriage 12 and through the corner blocks 15, 16 and 17, through block 18 on the rack 7, is wound onto its drum 2. In this case, the winding drum of the carrying cable 4 is located in the alignment with the drum 2, their axes are parallel and are located along the longitudinal axis of the self-propelled chassis 1. 1 Il. sl jz. .l .j- ;.

Description

2525

Изобретение относитс  к канатным трелевочным установкам и может быть использовано в лесной промышленности при освоении лесов на горных склонах, в равнинных и заболоченных услови х. 5The invention relates to cable skidders and can be used in the forest industry in the development of forests on mountain slopes, in lowland and marshy conditions. five

Цель изобретени  - повьшение производительности установки путем меха- .низированной подачи грузового крюка к месту прицепки груза.The purpose of the invention is to increase the productivity of the installation by means of a mechanized unloading of the load hook to the place of attachment of the load.

На Чертеже показана принципиальна  О схема канатной установки (штрихпунк- тирной линией I показано транспортное положение поворотной стойки),The drawing shows a schematic diagram of the cable installation (dash-dotted line I shows the transport position of the turntable)

Канатна  установка содержит самоходное шасси 1, например трактор МТЗ-80, от вала отбора мощности которого (через реверсивный редуктор, карданный вал, открытую зубчатую передачу , сцепление - на чертеже условно не показаны) крут щий момент пере- даетс  на барабан 2 намотки т гового каната 3 и барабан намотки несущего каната 4. Барабан намотки несущего каната 4 расположен в створе с барабаном 2, оси их параллельны и распог ложены вдоль продольной оси самоходного шасси 1 о Оба барабана расположены у основани  5 вертикальной части мачты 6. С вертикальной частью мачты 6 шарнирно соединена стойка 7 с возможностью поворота в вертикальной плоскости вдоль самоходного шасси 1 при помощи гидроцилиндра 8. Несущий канат 4 присоединен к тыловой опоре 9 и запасован через блок 10 на конце мачты 6, дополнительньш блок 11 каретки 12, блок 13 на конце мачты 6 и наматываетс  на свой барабан (на чертеже не показан), расположенный вдоль продольной оси самоходного шас си 1. Тчговый канат 3 (или возвратный канат) соединен с грузовым крюком 14 каретки 12 и через угловые блоки 15, 16 и 17, через блок 1В на мачте 6 наматываетс  на свой барабан 2. Пози- ци ми 19 и 20 обозначены раст жки мачты 6 и тыловой опоры 9, а 21 - разгрузочна  площадка, угловые блоки расположены в пор дке подачи грузового крюка 14 к месту прицепки груза.The cable installation contains a self-propelled chassis 1, for example, an MTZ-80 tractor, from whose power take-off shaft (through a reversible gearbox, drive shaft, open gear drive, clutch — conventionally not shown) the torque transmitted to the drum 2 of the winding pulley of the rope 3 and the drum of the winding of the carrier cable 4. The drum of the winding of the carrier rope 4 is located in alignment with the drum 2, their axes are parallel and located along the longitudinal axis of the self-propelled chassis 1 o Both drums are located at the base 5 of the vertical part of the mast 6. From the top in the main part of the mast 6, the rack 7 is pivotally connected in a vertical plane along the self-propelled chassis 1 by means of a hydraulic cylinder 8. The carrier cable 4 is attached to the rear support 9 and stocked through block 10 at the end of the mast 6, additional block 11 of the carriage 12, block 13 on the end of the mast 6 and is wound on its drum (not shown), located along the longitudinal axis of the self-propelled chassis 1. The pivot cable 3 (or return cable) is connected to the load hook 14 of the carriage 12 and through the corner blocks 15, 16 and 17, through block 1B on the mast 6 winding are on a drum 2. Pozi- qi 19 and 20 denote brace the mast 6 and the rear support 9, and 21 - an unloading platform corner blocks are arranged in the order of supplying the load hook 14 to place the load slinging.

Установка работает следующим образом .The installation works as follows.

В транспортном положении канаты 3In the transport position of the ropes 3

тываемую лесосеку. Производ т монтаж и запасовку канатов 3 и 4 (как показано на чертеже), поставив стойку 7 в рабочее вертикальное положение. Став т раст жки 19 и 20 на мачту 6 и тыловую опору 9. Вращением барабана 2 наматывают на него т говый канат 3, а барабан несущего каната 4 при этом подтормаживают и каретка 12 перемещаетс  вверх на лесосеку. Дл  доставки грузового крюка 14 с кареткой 12к месту прицепки груза растормаживают плавно барабан несущего каната 4, а возвратным т говым канатом 3 направ- л ют крюк 14 к Угловому блоку 15 и прицепл ют груз. Далее наматывают несущий канат 4 на свой барабан, а т говый.канат 3 притормаживают, при этом груз приподнимаетс , перемещаетс  и становитс  по линии несущего каната 4. При дальнейшей намотке несущего каната 4 происходит перемещение каретки 12с грузом вниз к разгрузочной площадке 21, где, отпуска  несущий канат 4, груз опускаетс  на разгрузочную площадку 21, где производ т его-отцепку от крюка 14 и каретку 12 вновь перемещают вверх и на лесосеку. После того, как весь груз у углового блока 15 перемещен на разгрузочную площадку 21, снимают угловой блок 15 и теперь грузовой крюк 14 будет подаватьс  к угловому блоку 16.logging area. The ropes 3 and 4 are assembled and stocked (as shown in the drawing) by placing rack 7 in the upright working position. Pull-outs 19 and 20 are placed on the mast 6 and the rear support 9. Rotate the drum 2 to pull the rope 3 onto it, and the drum of the carrier rope 4 is braked and the carriage 12 moves up to the cutting area. To deliver the cargo hook 14 with the carriage 12 to the load attachment point, brake the load-bearing cable 4 smoothly smoothly, and the return cable 3 direct the hook 14 to the Corner unit 15 and hook the load. Next, the carrier cable 4 is wound on its drum, and the traction cable 3 is braked, the load is lifted, moved and becomes along the line of the carrier cable 4. With further winding of the carrier cable 4, the carriage 12c moves downward to the unloading platform 21, where, the load bearing cable 4, the load is lowered onto the unloading platform 21, where it is uncoupled from the hook 14 and the carriage 12 is again moved upwards and to the cutting area. After the entire load at the corner unit 15 has been moved to the unloading platform 21, the corner unit 15 is removed and the load hook 14 will now be supplied to the corner unit 16.

30thirty

Демонтаж установки, происходит следующим образом.Dismantling the installation, as follows.

Каретку 12 перемещают к мачте 6, / отцепл ют т говый канат 3, отцепл ют Q несущий канат 4 от тыловой опоры 9 и наматывают канаты на свои барабаны, снимают раст жки 19 и 20, став т мачту 6 в транспортное положение и перемещают установку на следующую лесосеку ./The carriage 12 is moved to the mast 6, / the tow rope 3 is uncoupled, the Q carrier cable 4 is uncoupled from the rear support 9 and the ropes are wound on their drums, tensioners 19 and 20 are removed, the mast 6 is moved to the transport position and the unit is moved to next cutting area ./

Claims (1)

Формула изобретени Invention Formula Канатна  установка, содержаща  д самоходное шасси, несущее вертикальную мачту, с верхней частью которой шарнирно соединена стойка, установленна  с возможностью поворота в вертикальной плоскости вдоль самоходно- . и 4 намотаны на свои барабаны, а по- гг го шасси, и систему блоков с несущим воротна  стойка 7 находитс  в положе- и т говым канатами, концы которых НИИ I (показано штрихпунктирной ли- запасованы на барабанах, соответству- нией). Мобильна  канатна  установка ющих этим канатам и св занных с при- доставл етс  своим ходом на разраба- водом самоходного шасси, причем осьThe cable installation, comprising a self-propelled chassis, carrying a vertical mast, with the upper part of which a leg is hingedly connected, mounted with the possibility of rotation in a vertical plane along the self-propelled. and 4 are wound on their drums, and the undercarriage of the chassis and the system of blocks with supporting gate post 7 are located in the position of the hauling ropes, the ends of which are SRI I (shown by dash-dotted lines on the drums, corresponding to). The mobile cable installation associated with these ropes and associated with it is delivered under its own power to the development of a self-propelled chassis, with the axis 5five О ABOUT тываемую лесосеку. Производ т монтаж и запасовку канатов 3 и 4 (как показано на чертеже), поставив стойку 7 в рабочее вертикальное положение. Став т раст жки 19 и 20 на мачту 6 и тыловую опору 9. Вращением барабана 2 наматывают на него т говый канат 3, а барабан несущего каната 4 при этом подтормаживают и каретка 12 перемещаетс  вверх на лесосеку. Дл  доставки грузового крюка 14 с кареткой 12к месту прицепки груза растормаживают плавно барабан несущего каната 4, а возвратным т говым канатом 3 направ- л ют крюк 14 к Угловому блоку 15 и прицепл ют груз. Далее наматывают несущий канат 4 на свой барабан, а т говый.канат 3 притормаживают, при этом груз приподнимаетс , перемещаетс  и становитс  по линии несущего каната 4. При дальнейшей намотке несущего каната 4 происходит перемещение каретки 12с грузом вниз к разгрузочной площадке 21, где, отпуска  несущий канат 4, груз опускаетс  на разгрузочную площадку 21, где производ т его-отцепку от крюка 14 и каретку 12 вновь перемещают вверх и на лесосеку. После того, как весь груз у углового блока 15 перемещен на разгрузочную площадку 21, снимают угловой блок 15 и теперь грузовой крюк 14 будет подаватьс  к угловому блоку 16.logging area. The ropes 3 and 4 are assembled and stocked (as shown in the drawing) by placing rack 7 in the upright working position. Pull-outs 19 and 20 are placed on the mast 6 and the rear support 9. Rotate the drum 2 to pull the rope 3 onto it, and the drum of the carrier rope 4 is braked and the carriage 12 moves up to the cutting area. To deliver the cargo hook 14 with the carriage 12 to the load attachment point, brake the load-bearing cable 4 smoothly smoothly, and the return cable 3 direct the hook 14 to the Corner unit 15 and hook the load. Next, the carrier cable 4 is wound on its drum, and the traction cable 3 is braked, the load is lifted, moved and becomes along the line of the carrier cable 4. With further winding of the carrier cable 4, the carriage 12c moves downward to the unloading platform 21, where, the load bearing cable 4, the load is lowered onto the unloading platform 21, where it is uncoupled from the hook 14 and the carriage 12 is again moved upwards and to the cutting area. After the entire load at the corner unit 15 has been moved to the unloading platform 21, the corner unit 15 is removed and the load hook 14 will now be supplied to the corner unit 16. 00 Демонтаж установки, происходит следующим образом.Dismantling the installation, as follows. Каретку 12 перемещают к мачте 6, / отцепл ют т говый канат 3, отцепл ют Q несущий канат 4 от тыловой опоры 9 и наматывают канаты на свои барабаны, снимают раст жки 19 и 20, став т мачту 6 в транспортное положение и перемещают установку на следующую лесосеку ./The carriage 12 is moved to the mast 6, / the tow rope 3 is uncoupled, the Q carrier cable 4 is uncoupled from the rear support 9 and the ropes are wound on their drums, tensioners 19 and 20 are removed, the mast 6 is moved to the transport position and the unit is moved to next cutting area ./ Формула изобретени Invention Formula 312998734312998734 вращени  барабана т гового каната ни  производительности установки пу- расположена параллельно продольной тем механизированной подачи грузового оси самоходного шасси у основани  крюка к месту прицепки груза, карет- мачты, а каретка с грузовым крюком ка и стойка вертикальной мачты снабустаНовлена на несущем канате, при5 жень дополнительными блоками, через этом ее грузовой крюк- св зан с т го- которые запасован несущий канат, при .вым канатом, пропущенным через сие- этом ось вращени  его барабана распо- тему угловых блоков, отличаю- ложена параллельно продольной осиrotation of the drum of the tow rope and the capacity of the installation of the pu- is located parallel to the longitudinal mechanized feed axis of the self-propelled chassis at the base of the hook to the load attachment site, carriage mast, and the carriage with the hook hook and vertical mast stand are equipped with additional cable blocks, through this its load hook is connected to a trunk carrier carrying rope, with a rope passing through this axis of rotation of its drum by the angular blocks arallelno longitudinal axis щ а   с   тем, что, с целью повьше-, самоходного шасси.Shch and the fact that, with the aim of a higher-self-propelled chassis.
SU853969854A 1985-10-29 1985-10-29 Ropeway installation SU1299873A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853969854A SU1299873A1 (en) 1985-10-29 1985-10-29 Ropeway installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853969854A SU1299873A1 (en) 1985-10-29 1985-10-29 Ropeway installation

Publications (1)

Publication Number Publication Date
SU1299873A1 true SU1299873A1 (en) 1987-03-30

Family

ID=21202855

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853969854A SU1299873A1 (en) 1985-10-29 1985-10-29 Ropeway installation

Country Status (1)

Country Link
SU (1) SU1299873A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1214513, кл. В-61 В 7/00, 1984. *

Similar Documents

Publication Publication Date Title
US3083839A (en) Cable logging operation
US2694474A (en) Mobile spar yarder
US3407942A (en) Log yarding system
EP0433941B1 (en) Skyline suspended carriage for heavy load pulling
US4383792A (en) Crane for detachable mounting on a truck bed
SU1299873A1 (en) Ropeway installation
US3033526A (en) Portable logging tower
CN111874010B (en) Bamboo wood collection system that coverage is high
US3712478A (en) Log yarding system and method
US2025284A (en) Hoisting crane
US3531000A (en) Scab line carriage system method and apparatus
JP2585936Y2 (en) Overhead line transport equipment for wood, etc.
US3050285A (en) Metal logging spar
SU1214513A1 (en) Rope installation for logging wood
US3189134A (en) Portable skyline yarder
SU1291471A1 (en) Rope arrangement for hauling timber
US3116838A (en) Cableway for bridge construction
USRE27621E (en) Log yarding system
SU1576381A1 (en) Air-logging unit
SU1158421A1 (en) Ropeway installation
US20170174479A1 (en) Cable logging system
SU1202939A1 (en) Haulage rope arrangement
US3344568A (en) Spar tower erecting and anchoring system
US3410430A (en) Hauling and lifting machine
US3269559A (en) Load-handling spar