SU1257140A1 - Working equipment of dragline - Google Patents

Working equipment of dragline Download PDF

Info

Publication number
SU1257140A1
SU1257140A1 SU843836945A SU3836945A SU1257140A1 SU 1257140 A1 SU1257140 A1 SU 1257140A1 SU 843836945 A SU843836945 A SU 843836945A SU 3836945 A SU3836945 A SU 3836945A SU 1257140 A1 SU1257140 A1 SU 1257140A1
Authority
SU
USSR - Soviet Union
Prior art keywords
bucket
rope
winch
traction
lifting
Prior art date
Application number
SU843836945A
Other languages
Russian (ru)
Inventor
Михаил Александрович Кузьмичев
Original Assignee
Kuzmichev Mikhail A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kuzmichev Mikhail A filed Critical Kuzmichev Mikhail A
Priority to SU843836945A priority Critical patent/SU1257140A1/en
Application granted granted Critical
Publication of SU1257140A1 publication Critical patent/SU1257140A1/en

Links

Description

1 one

Изобретение относитс  к землеройным машинам, а конкретно к рабочему оборудованию экскаватора-драглайна.The invention relates to earthmoving machines, and specifically to the working equipment of a dragline excavator.

Цель изобретени  - повышение производительности и улучшение разгрузк под стрелой.The purpose of the invention is to increase productivity and improve unloading under the boom.

На фиг.1 изображен экскаватор, вид сбоку; на фиг.2 - ковш; на фиг.З ковщ с упр жью, вид сбоку; на фиг 4, 5 - то же; на фиг.6 - дополнительна  арка, вид спереди; на фиг.7 - то же, вид сбоку; на фиг.8 - то же, вид сверху; на фиг.9 - сечение А-А иа фиг.8; на фиг.10 - схема установки дополнительной лебедки; на фиг.11 - то же, удердивающей лебедки; на фиг.12 - 15 - моменты опрокидывани  ковша на зубь ; на фиг.16 - кинематическа  схема т говой и подъемной лебедок; на фиг.17 - то же, опрокидывающей лебедки; на фиг.18 - то же, удерживающей лебедки; на фиг.19 - кабина машиниста; на фиг.20 - электрическа  схема удерживающей и опрокидывающей лебедок.Figure 1 shows the excavator, side view; figure 2 - bucket; in Fig. 3, a corkscrew, side view; Fig 4, 5 - the same; figure 6 is an additional arch, front view; 7 - the same, side view; on Fig the same, top view; figure 9 is a section aa and ia of figure 8; figure 10 is a diagram of the installation of an additional winch; figure 11 - the same, relying winch; 12 to 15 show the moments of tipping the bucket onto a tooth; Fig. 16 is a kinematic scheme for traction and lifting winches; on Fig - the same, tipping winch; on Fig - the same holding winches; on Fig - cab driver; Fig. 20 is an electrical diagram of a holding and tilting winches.

Рабочее оборудование содержит стрелу 1, ковш 2, т говые канаты 3, подъемные канаты 4, удерживающий канат 5, опрокидывающий канат 6 (фиг.1Working equipment contains boom 1, bucket 2, hauling ropes 3, hoisting ropes 4, holding rope 5, tipping rope 6 (figure 1

В нижней части стрелы 1 установлены два ролика 7 и 8, которые предупреждают удары и трение опрокидывающего каната 6 о детали стрелы 1. На поворотной платформе экскаватора , кроме т говой и подъемной лебедки , установлены опрокидывающа  9 и удерживающа  10 лебедки. At the bottom of the boom 1 there are two rollers 7 and 8, which prevent shocks and friction of the tilting rope 6 about the details of the boom 1. On the rotary platform of the excavator, besides the thrust and lifting winch, there are tilting 9 and holding 10 winches.

На надстройке дополнительно установлены два блока, блок 11 дл  опрокидывающего каната 6 и блок 12 дл  удерживающего каната 5.Two blocks are additionally installed on the superstructure, block 11 for the tilting rope 6 and block 12 for the retaining rope 5.

Ковш с упр жью (фиг.2 - 5) содержит т говые цепи 13, дополнительные цепи 14, распорную балку т говых цепей . 15, дополнительную арку 16, площадку 17, установленную на дополнительной арке 16, подъемные цепи 18, распорную балку подъемных цепей 19. Дл  удерживающего каната 5 на траверсе креплени  подъемных канатов 4 установлены ролик 20 и блок 21 на балке .трубчатого сечени , котора   вл етс  верхней частью основной аркиThe bucket with the harness (Figures 2–5) contains the traction chains 13, the additional chains 14, the expansion beam of the traction chains. 15, an additional arch 16, a platform 17 mounted on the additional arch 16, lifting chains 18, a spreading beam of the lifting chains 19. For the retaining rope 5 on the yoke for fastening the lifting ropes 4, the roller 20 is installed and the block 21 on the beam of the tubular section, which is the top of the main arch

ковша, и блок 22.bucket, and block 22.

На площадке 17 установлены направл ющие стойки и опорный ролик 23 дл  опрокидывающего каната 6 и четыре ролика ,24 дл  ветвей удерживающегоThe platform 17 is equipped with guide posts and an anvil roller 23 for the tilting rope 6 and four rollers, 24 for the arms

57140Д57140D

каната 5, идущих с блока 22 на блок 21 и ролик 20 (фиг.6 - 8).rope 5, going from block 22 to block 21 and roller 20 (Fig.6 - 8).

Сечение дополнительной арки 16 коробчатое (фиг.9) На задней стенкеThe cross section of the additional arch box 16 (Fig.9) On the rear wall

5 ковша закреплен рычаг 25(фиг.10).К рычагу 25 шарнирно с помощью круша 26 присоединен конец опрокидьшающего каната 6, второй конец этого каната закреплен на барабане опрокидывающей5 bucket fixed lever 25 (figure 10). To the lever 25 pivotally with the help of crushing 26 attached to the end of the tipping rope 6, the second end of this rope is fixed to the tipping drum

0 лебедки 9..0 winch 9 ..

Конец удерживак це го каната 5 с помощью клинового зажима 27 крепитс  к обойме блока 22, второй конец закреп лен на барабане-удерживающей лебедкиThe end of the rope 5 is fastened to the block 22 by means of a wedge clamp 27, the second end is secured to the drum-holding winch

5 to (фиг.11). В верхней части стрелы5 to (FIG. 11). At the top of the boom

1между головных блоков подъемных канатов установлен блок 28 дл  удер м- вающего каната 5. В промежутке от балансира подъемных канатов до верх0 ней части арки ковша удерживакиций канат 5 проходит через систему блоков 21 и 22, образующих трехкратный полиспаст, где блок 21,  вл етс , условно, неподвижным, а блок 22 25 подвижным.1, between the head blocks of the hoisting ropes, a block 28 is installed for the holding back cable 5. In the interval from the hoisting ropes balancer to the upper part of the arch of the bucket, the rope 5 passes through the system of blocks 21 and 22, which form a three-time polyspast, where block 21 is conditionally, fixed, and the block 22 25 moving.

На задней стенке ковша установлены ролики 29, которые предупреждают трение ветвей удерживающего каната 5 о заднюю стенку ковша (фиг.15).Rollers 29 are installed on the back wall of the bucket, which prevent friction of the branches of the retaining rope 5 against the back wall of the bucket (Fig. 15).

30 Концы подъемных цепей 18 и т говых цепей 13 с помощью серьг 30 шарнирно креп тс  к одним и тем же пальцам - цапфам, которые  вл ютс  полуос ми (фиг.2 - 4). Опорами полуосей  вл ютс  боковые стенки ковша и проушины , закрепленные на боковых стенках . Такое соединение ковша с цеп ми и наличие распорных балок на цеп х обеспечивает вращательное движение30 The ends of the lifting chains 18 and the pull chains 13 with the help of the earrings 30 are hingedly attached to the same fingers, the trunnions, which are semi-axes (Figures 2-4). The axle supports are side walls of the bucket and eyelets fixed to the side walls. Such a combination of a bucket with chains and the presence of expansion beams on chains ensures rotational movement.

ди ковша в вертикальной плоскости при нат нутых подъемных 18 и т говых 13diy bucket in a vertical plane with tensioned lifting 18 and traction 13

оabout

цеп х в пределах 70...75 .chains in the range of 70 ... 75.

Канат 5 удерживает ковш 2 от опрокидывани  на зубь  во врем  копани  45 (фиг.11 - 13).Rope 5 keeps bucket 2 from tipping over the teeth during digging 45 (Figures 11 - 13).

IfeifeT 6 опрокидывает ковш 2 на зубь  во врем  его выгрузки (фиг.10, 14, 15).IfeifeT 6 overturns the bucket 2 on the teeth during its unloading (figure 10, 14, 15).

Длина дополнительных цепей 14 ус- 5 танавливаетс  такой, чтобы при нат нутых т говых цап х.13 днище ковщаThe length of the additional chains 14 is set so that, with the tensioned thrust pins x 13, the bottom of the scoop

2было параллельно оси т говых канатов 3 или имело наклон в пределах 5... 8 в сторону задней стенки ковша 2.2 was parallel to the axis of the tow rope 3 or had a slope of 5 ... 8 towards the rear wall of the bucket 2.

55 Окружное усилие на барабане лебедки 9 при копании и перемещении ковша 2 от забо  до места выгрузки и обратно - минимальное, равное весу55 The circumferential force on the drum of the winch 9 when digging and moving the bucket 2 from the bottom to the place of unloading and back is the minimum equal to the weight

5five

распущенного каната 6, чтобы не допустить ослаблени  и запутывани  каната 6 на барабане лебедки 9.loose rope 6 to prevent the rope 6 from loosening and tangling on the winch drum 9.

При опрокидывании груженного ковша 2 на зубь  эти усили  равны при- $ мерно 1/4 веса груженного ковша.When tipping the loaded bucket 2 onto the teeth, these forces are equal to approximately 1/4 of the weight of the loaded bucket.

Окружное усилие на барабане удерживающей лебедки 10 мен етс . Во врем  опрокидывани  ковща на зубь  с помощью опрокидывающего каната 6 ок- Ю ружное усилие на барабане удерживающей лебедки 10 равно нулю, так как направлени  сил на ветв х полиспаста каната 5 преп тствуют вращательному движению ковша 2 от опрокидывающего t5 каната 6 ( - 15). При свободной подвеске ковша 2 во врем  переме- щени  его от забо  до места выгрузки и обратно усили  на удерживающем канате 5 минимальны - равны весу распу-20 щенного каната 5. Во врем  копани  усили  на удерживающем канате 5 пропорциональны усили м, возникающим на т говом канате 3. При работе т говой лебедки на намотку между электродви- 25 гател ми т говой лебедки и удерживающей лебедки 10 имеетс  пр ма  жестка  св зь по току, котора  обеспечивает устойчивое положение ковша 2 от опрокидывани  его на зубь  при копании, зоThe circumferential force on the drum of the holding winch 10 varies. During the overturning of the bucket on the teeth with the help of the tilting rope 6, the circumferential force on the drum of the holding winch 10 is zero, since the directions of forces on the branches of the chain pulley of the rope 5 prevent the rotational movement of the bucket 2 from the tilting rope 5 of rope 6 (- 15). When the bucket 2 is loosely suspended, when you move it from the bottom to the point of unloading and back, the forces on the holding cable 5 are minimal — equal to the weight of the loose 20 cable 5. While digging, the forces on the holding cable 5 are proportional to the forces that occur on the traction 3. When the winch is operated, the current is rigidly connected to the winding between the electric winch winder and the holding winch 10, which provides a stable position of the bucket 2 from tipping it over the tooth when digging,

С помощью т гового каната 3 ковш 2 перемещаетс  по уступу снизу вверх, среза  при этом стружку горной массы 150-300 мм. Толщина срезаемой стружковш 2 устанавливаетс  над желаемым местом выгрузки или транспортным средством.With the help of a rope 3, the bucket 2 is moved along the ledge from bottom to top, while cutting off the chips of the rock mass 150-300 mm. The thickness of the cutting chip 2 is set above the desired unloading point or vehicle.

После того, когда ковш 2 установлен над местом выгрузки, кнопкой 44 увеличиваетс  сила тока в цепи электродвигател  35 опрокидывающей лебедки 9 и уменьшаетс  до нул  сила тока в цепи электродвигател  38 удерживающей лебедки 10, и ковш 2 под воздействием силы Р (фиг.14 - 15) повернетс  Б серьгах 30 и горна  масса высыпаетс  из ковша 2. After the bucket 2 is installed above the unloading point, the button 44 increases the current in the circuit of the tilting winch motor 35 and decreases the current in the motor 38 of the holding winch 10 to zero and the bucket 2 under the influence of force P (Fig.14 - 15 ) turns B earrings 30 and the forge mass is poured out of the bucket 2.

Во врем  выгрузки с помощью подъемного каната 4 и т гового 3 ковш 2 можно перемещать в плоскости стрелы 1, ас помощью поворота поворотной платфорьи) в горизонтальной плоскости, что позвол ет без просыпей равномерно размещать грунт при погрузке в транспортные средства или площадки, сокраща  тем самым планировочные работы бульдозером.During unloading using hoisting rope 4 and pulling 3, the bucket 2 can be moved in the plane of the boom 1, as well as by turning the turntable) in the horizontal plane, which allows the soil to be evenly distributed when loaded in vehicles or platforms, without spilling, thereby reducing bulldozer planning work.

По окончании выгрузки ковша 2 кнопка 44 отпускаетс  и ковш 2 под действием силы т жести возвращаетс  в положение, которое фиксируетс  дополнительными цеп ми 14. Ускорить возвращение ковша 2 из вертикального положени .в горизонтальное можно удерживающим канатом 5 с помощью кнопки 43.When the bucket 2 is unloaded, the button 44 is released and the bucket 2 returns to the position fixed by additional chains 14. Under the force of gravity, the return of the bucket 2 from the vertical position can be accelerated. A button 43 can be horizontal.

Управление ковшом 2 осуществл етс  посредством электропривода. Крут - ки регулируетс  подъемным канатом 4. «. m,« .. 35 щии момент от двух электродвигателейBucket 2 is controlled by an electric drive. The twists are adjusted by the hoisting rope 4. ". m, ".. 35 moment from two electric motors

31 передаетс  через упругие муфты 32 и через редуктор 33 на барабаны 34, которые через канаты 3 передают усилие на ковщ 2.31 is transmitted through the elastic sleeves 32 and through the reducer 33 to the drums 34, which, through the ropes 3, transmit force to the mat 2.

От электродвигател  35 крут пргй момент передаетс  через упругую муф-:: ту 36 и редуктор 37 на барабан лебед- ,ки 9, который через канат 6 передает усилие на заднюю стенку ковша 2.From the electric motor 35, a cool moment is transmitted through the elastic coupling- :: that 36 and the reduction gear 37 to the drum of the winch 9, which through the cable 6 transfers the force to the back wall of the bucket 2.

Крут щий момент от электродвигател  38 передаетс  через упругую муфту 39,.редуктор 40, муфту 41 наThe torque from the electric motor 38 is transmitted through the elastic coupling 39, the gear 40, the coupling 41 to

Наиболее т желое положение дл  экскавации ,- когда глубина копани  максимальна , ковщ 2 находитс  на подошве и подъемные канаты 4 занимают вертикальное положение (фиг.12). Дл  это- дд го положени  предусмотрена кнопка 43 удержани  ковша 2 от опрокидывани .The most difficult position is for excavation, when the digging depth is maximum, the bucket 2 is on the sole and the hoisting ropes 4 are upright (Fig. 12). For this and the second position, a button 43 for keeping the bucket 2 from tipping is provided.

Движение ковша по уступу осуществл етс  силой F, котора  через канаты 3 передаетс  на ковш 2. Удерживает ковш 2 от опрокидывани  на зубь  сила Q т жести ковша и суммарна  силаThe movement of the bucket along the ledge is carried out by the force F, which through the ropes 3 is transferred to the bucket 2. Keeps the bucket 2 from tipping to the teeth the force Q t of the bucket's hardness and the total force

F от ветвей удерживакнцего каната 5, котора  передаетс  на верхнюю часть основной арки ковша 2 (фиг.12 - 13).F from the branches of the holding rope 5, which is transmitted to the upper part of the main arch of the bucket 2 (Figures 12-13).

Вывод ковша 2 из забо  производитс  подъемным канатом 4.The removal of the bucket 2 from the bottom is made by a lifting rope 4.

Одновременно с подъемом ковша 2 вверх включаетс  поворот. Поворотна  платформа вместе со стрелой 1 перемещаетс  в зону выгрузки (фиг.1). С помощью подъемного 4, т гового 3 канатов и поворота поворотной платформыSimultaneously with the lifting of the bucket 2 upward turn turns. The turntable with the boom 1 is moved to the discharge area (Fig. 1). With the help of lifting 4, t 3 ropes and turning the turntable

барабан лебедки 10, который через канат 5 и блок 22 передает т говое . 50 усилие на основную арку ковша 2.the winch drum 10, which, through the rope 5 and block 22, transmits traction. 50 force on the main arch of the bucket 2.

Один из барабанов т говой и подъе- мной лебедок имеет муфту 42, посредством которой обеспечиваетс  выравнивание нат жени  канатов при их 55 замене.One of the drums of the pull and hoist winch has a sleeve 42, by means of which the tension of the ropes is equalized during their replacement.

В кабине машиниста (фиг.19) на рычаге командоконтроллера управлени  т говой лебедкой расположена кнопкаIn the driver's cab (Fig. 19), a button is located on the lever of the controller for controlling the traction winch.

ковш 2 устанавливаетс  над желаемым местом выгрузки или транспортным средством.bucket 2 is installed above the desired unloading point or vehicle.

После того, когда ковш 2 установлен над местом выгрузки, кнопкой 44 увеличиваетс  сила тока в цепи электродвигател  35 опрокидывающей лебедки 9 и уменьшаетс  до нул  сила тока в цепи электродвигател  38 удерживающей лебедки 10, и ковш 2 под воздействием силы Р (фиг.14 - 15) повернетс  Б серьгах 30 и горна  масса высыпаетс  из ковша 2. After the bucket 2 is installed above the unloading point, the button 44 increases the current in the circuit of the tilting winch motor 35 and decreases the current in the motor 38 of the holding winch 10 to zero and the bucket 2 under the influence of force P (Fig.14 - 15 ) turns B earrings 30 and the forge mass is poured out of the bucket 2.

Во врем  выгрузки с помощью подъемного каната 4 и т гового 3 ковш 2 можно перемещать в плоскости стрелы 1, ас помощью поворота поворотно платфорьи) в горизонтальной плоскости что позвол ет без просыпей равномерно размещать грунт при погрузке в транспортные средства или площадки, сокраща  тем самым планировочные работы бульдозером.During unloading using hoisting rope 4 and traction 3, the bucket 2 can be moved in the plane of the boom 1, as well as by rotating the tilting platform) in the horizontal plane, which allows the soil to be evenly distributed without being spilled when loaded into vehicles or platforms, thereby reducing planning bulldozer work.

По окончании выгрузки ковша 2 кнопка 44 отпускаетс  и ковш 2 под действием силы т жести возвращаетс  в положение, которое фиксируетс  дополнительными цеп ми 14. Ускорить возвращение ковша 2 из вертикального положени .в горизонтальное можно удерживающим канатом 5 с помощью кнопки 43.When the bucket 2 is unloaded, the button 44 is released and the bucket 2 returns to the position fixed by additional chains 14. Under the force of gravity, the return of the bucket 2 from the vertical position can be accelerated. A button 43 can be horizontal.

Управление ковшом 2 осуществл етбарабан лебедки 10, который через канат 5 и блок 22 передает т говое . усилие на основную арку ковша 2.The bucket 2 was controlled by the winch drum 10, which, through the rope 5 and the block 22, transmits traction. force on the main arch of the bucket 2.

Один из барабанов т говой и подъе- мной лебедок имеет муфту 42, посредством которой обеспечиваетс  выравнивание нат жени  канатов при их замене.One of the drums of the pull and the lifting of the winches has a sleeve 42, by means of which the tension of the ropes is equalized when they are replaced.

В кабине машиниста (фиг.19) на рычаге командоконтроллера управлени  т говой лебедкой расположена кнопкаIn the driver's cab (Fig. 19), a button is located on the lever of the controller for controlling the traction winch.

5151

43 (УКОО) удержани  ковша 2 от опро кидывани , а на рычаге командоконт- роллера управлени  подъемной лебедкой - кнопка 44 (ВК) выгрузки ковша с нормально открытым и нормально зак рытым контактами.43 (UKOO) keeping the bucket 2 from rolling out, and on the lever of the steering wheel control roller of the hoist winch control - button 44 (VK) unloading the bucket with normally open and normally closed contacts.

Экскаватор работает следующим образом .The excavator works as follows.

При возвращении ковша 2 из вертикального положени  в горизонтальноеWhen returning the bucket 2 from the vertical position to the horizontal

571406571406

опрокидывакиций канат 6 л жет на опорный ролик 23, направл ющими дл  него будут ветви удерживающего каната 5, идущие с блоков 21 и 22, и направл ю J щие стойки (фиг.6 - 8) . .tipping the rope 6 l to the support roller 23, guides for it will be the branches of the retaining rope 5 coming from blocks 21 and 22, and the guides J standings (Figures 6 - 8). .

После выгрузки ковш с помощью Iаорота поворотной платформы и кана- ;тов подъемных 4 и т говых 3 возвра- 10 щаетс  в забой.After unloading, the bucket with the help of the I-turn of the turntable and the channels of the lifting 4 and the traction 3 returns to the bottom.

1818

i 5i 5

30J330J3

rere

aa

aa

iSiS

j3us.6j3us.6

фиг. 8FIG. eight

фиеЭfieE

cpu&Wcpu & w

гоgo

/ /// / // //7  / /// / // // 7

10ten

//Г//П/Г7/////// G // P / G7 /////

(риз. 13(riz. 13

cpus.icpus.i

ffue. 15ffue. 15

фиг.1бfigb

физ. 17physical 17

4141

J8 J9J8 j9

фиг. 18FIG. 18

(риг. 13(rig 13

DX ДDX D

4343

От траисфо/ мапю { роТг From traysfo / mapyu {roTg

а ауанефариа/гнае |and auanefaria / gnae |

ИAND

ffm mflafffeфopA ffm mflafffefopA

MomofltyTs MomofltyTs

I От fpancft yiI From fpancft yi

шsh

-- -и 1 . .V I - and 1. .V I

т j ато/у& Т4 t j atoms / y & T4

41| --1..41 | --one..

MM

C/JC / J

Гр1Gr1

-H-H

jr A fl jr a fl

r-iivJ r-iivJ

xr, gffgyxr, gffgy

,-«rvWigy- W- "rvWigy- W

ъв шву/iiv seam / i

КОИЛ,COIL,

жWell

ЗМУДZMUD

iOjHfiOjHf

5iw трансфарма- то/заГу I5iw transfarma-that / zaGu I

77 fтrpa fcфapмa- 77 ftrpa fcfapmama-

fTTOflCf Гб fTTOflCf GB

Составитель И.Синицка  Редактор Н.Слобод ник Техред Л. Олейник Корректор Л.Пилипенко;Compiled by I.Sinitska Editor N.Slobod nickname Techred L. Oleinik Proofreader L.Pilipenko;

Заказ 4886/22Тираж 641ПодписноеOrder 4886/22, Draw 641, Subscription

ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee

по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5

Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4

фиг. 20FIG. 20

Claims (1)

РАБОЧЕЕ ОБОРУДОВАНИЕ ЭКСКАВАТОРА-ДРАГЛАЙНА, включающее стрелу с головными блоками, ковш с задней стенкой, аркой и упряжью, содержащей шарнирно соединенные с цапфами ковша тяговые и подъемные цепи, и тяговую и подъемную и удерживающие лебедки с канатами, отличающееся тем, что, с целью повышения производительности и улучшения разгрузки под стрелой, оно снабжено дополнительной опрокидывающей лебедкой, а ее канат расположен параллельно тяговым канатам и соединен с задней стенкой ковша, который имеет дополнительную арку с блоком, размещенную с возможностью огибания блока канатом дополнительной опрокидывающей лебедки, фы расположены на ковше от центра его тяжести к части.EXCAVATOR-DRAGLINE WORKING EQUIPMENT, including an arrow with head blocks, a bucket with a rear wall, an arch and a harness, containing traction and lifting chains articulated with bucket pivots, and traction and lifting and holding winches with ropes, characterized in that, in order to increase performance and improve unloading under the boom, it is equipped with an additional tipping winch, and its rope is parallel to the traction ropes and connected to the rear wall of the bucket, which has an additional arch with a block placed with the possibility of circling the block with a rope of an additional tipping winch, the fs are located on the bucket from its center of gravity to the part. при этом цапсо смещением передней ю слat the same time, the axle is offset by the anterior 1 ι:1 ι:
SU843836945A 1984-12-29 1984-12-29 Working equipment of dragline SU1257140A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843836945A SU1257140A1 (en) 1984-12-29 1984-12-29 Working equipment of dragline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843836945A SU1257140A1 (en) 1984-12-29 1984-12-29 Working equipment of dragline

Publications (1)

Publication Number Publication Date
SU1257140A1 true SU1257140A1 (en) 1986-09-15

Family

ID=21155974

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843836945A SU1257140A1 (en) 1984-12-29 1984-12-29 Working equipment of dragline

Country Status (1)

Country Link
SU (1) SU1257140A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864747A (en) * 1988-02-29 1989-09-12 Harnischfeger Corporation Support assembly for a dragline bucket

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР 606945, кл. Е 02 F 3/48, 1978. Патент US № 2978820, кл. 37-116, опублик. 1961. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4864747A (en) * 1988-02-29 1989-09-12 Harnischfeger Corporation Support assembly for a dragline bucket

Similar Documents

Publication Publication Date Title
US6446366B1 (en) Dragline apparatus and bucket
US5400530A (en) Dragline excavator bucket and rigging
SU1257140A1 (en) Working equipment of dragline
US3912230A (en) Dragrope fairlead assembly
CA2514727A1 (en) Dragline bucket
US3252585A (en) Rigging for mobile tower crane having a topping jib-boom
US2267614A (en) Dragline excavator
SU972008A1 (en) Dragline working equipment
JPH0448906B2 (en)
US2498000A (en) Hoe excavator
US4174579A (en) Twin boom dragline
US1523972A (en) Stump puller
SU15320A1 (en) Adaptation to the dredge or dredger
SU810900A1 (en) Working equipment of dragline excavator
RU2059755C1 (en) Working equipment of dragline excavator
SU606945A1 (en) Dragline working equipment
SU1709026A1 (en) Dragline digger change equipment for shovel digger having a thruster, a boom with a head pulley, and a hoisting winch
US2330041A (en) Loader
SU968414A1 (en) Clamshell-type muck-loading machine for sinking vertical mine shafts
RU2186909C1 (en) Dragline excavator
SU947299A1 (en) Dragline working equipment
SU798239A1 (en) Power shovel working equipment
SU1060767A1 (en) Working equipment of back hoe excavator
JPH078542Y2 (en) crane
RU94043599A (en) Loading excavator-dragline