SU1249180A1 - Steam-turbine extraction plant - Google Patents
Steam-turbine extraction plant Download PDFInfo
- Publication number
- SU1249180A1 SU1249180A1 SU833630723A SU3630723A SU1249180A1 SU 1249180 A1 SU1249180 A1 SU 1249180A1 SU 833630723 A SU833630723 A SU 833630723A SU 3630723 A SU3630723 A SU 3630723A SU 1249180 A1 SU1249180 A1 SU 1249180A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- steam
- turbine
- condenser
- extraction plant
- turbine extraction
- Prior art date
Links
Landscapes
- Engine Equipment That Uses Special Cycles (AREA)
Description
Изобретение относитс к теплоэнергетике и может быть использовано в паротурбин..ых установках с теплофикационным отбором параThe invention relates to a power system and can be used in steam turbines .. in installations with heat extraction of steam.
Цель изобретени - повышение эко- номичнос ти паротурбинной установки,The purpose of the invention is to increase the economy of a steam turbine plant,
На чертеже условно изображена схема установки.The drawing conventionally shows the installation diagram.
Установка содержит турбину 1 с .конденсаторами 2 и 3 и патрубками подвода пара 4 и 5 соответственно, причем патрубок 5 конденсатора 3 подключен к патрубку а также отдельные охлаждающие системы 6 и 7 конденсаторов 2 и 3 соответственно. К установке подключена теплова сеть 8 с системой 9 подпитки. Вход охлажд,аю- щей системы-7 конденсатора. 3 подклюРедактор 0.ГоловачThe installation contains a turbine 1 with. The capacitors 2 and 3 and the steam supply pipes 4 and 5, respectively, and the pipe 5 of the condenser 3 is connected to the pipe and separate cooling systems 6 and 7 of the capacitors 2 and 3, respectively. A heat network 8 with a system of 9 make-up is connected to the installation. Cooling inlet, operating system-7 condenser. 3 connect Editor 0. Head
Составитель В.Чирков Техред Г.ГерберCompiled by V. Chirkov Tehred G. Gerber
Заказ 4212/33 Тираж 500ПодписноеOrder 4212/33 Circulation 500 Subscription
ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee
по делам изобретений и открытий 113035, Москва, Ж-35, Раушска наб., д„ 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., d 4/5
Производственно-полиграфическое предпри тие, г,Ужгород ул. Проектна , 4.Production and printing company, Uzhgorod, ul. Design, 4.
чен к сети 10 водопровода, а выход к системе 9 подпитки тепловой сети 8,chen to the network 10 water supply, and the output to the system 9 feed heat network 8,
Установка работает следующим образом .The installation works as follows.
Пар, пройд проточную часть турбины 1j поступает в патрубок 4,, где раздел етс на два потока и поступает Б конденсатор 2 и через патрубок 5 в конденсатор 3. Охлаждающа вод а из сети 10 водопровода поступает в конденсатор 3, а п осле нагрева в нем подаетс в систему 9 подпитки тепловой сети 8. .Нагрев воды городского водопровода отработавшим в турбине 1 паром позвол ет уменьшить расхэд пара в теплофикационные отборы и увеличить вьфаботку электроэнергии на тегшовом потреблении.The steam passed through the flow part of the turbine 1j enters the nozzle 4, where it is divided into two streams and the B condenser 2 enters and through the nozzle 5 to the condenser 3. The cooling water and from the water supply network 10 enters the condenser 3 and after heating in it is fed into the system 9 of the heating network 8. 8. Heating the city water supply with the steam used in turbine 1 reduces the steam consumption into the heat extraction and increases the heat consumption of electricity for tegshov consumption.
Корректор Г,РешетникCorrector G, Reshetnik
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833630723A SU1249180A1 (en) | 1983-08-03 | 1983-08-03 | Steam-turbine extraction plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833630723A SU1249180A1 (en) | 1983-08-03 | 1983-08-03 | Steam-turbine extraction plant |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1249180A1 true SU1249180A1 (en) | 1986-08-07 |
Family
ID=21077598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833630723A SU1249180A1 (en) | 1983-08-03 | 1983-08-03 | Steam-turbine extraction plant |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1249180A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103912325A (en) * | 2014-04-15 | 2014-07-09 | 山东翰飞电力科技有限公司 | Device for implementing high-back-pressure adjustable running of circulating water heat-supplying condenser of cogeneration units |
CN105822372A (en) * | 2016-05-23 | 2016-08-03 | 燕山大学 | Wet cooling steam turbine cold end system based on high-back-pressure steam exhaust waste heat recovery |
-
1983
- 1983-08-03 SU SU833630723A patent/SU1249180A1/en active
Non-Patent Citations (1)
Title |
---|
Рыжкин В.Я. Тепловые электрические станции. - М,: Энерги , 1976, с. 125. Патент FR № 2307957, кл. F 01 К 17/02, опублик. 1976. * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103912325A (en) * | 2014-04-15 | 2014-07-09 | 山东翰飞电力科技有限公司 | Device for implementing high-back-pressure adjustable running of circulating water heat-supplying condenser of cogeneration units |
CN103912325B (en) * | 2014-04-15 | 2016-05-11 | 山东翰飞电力科技有限公司 | Cogeneration units circulating water heating condenser is realized the adjustable running gear of high back pressure |
CN105822372A (en) * | 2016-05-23 | 2016-08-03 | 燕山大学 | Wet cooling steam turbine cold end system based on high-back-pressure steam exhaust waste heat recovery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9909496B2 (en) | Power generation system | |
DK159734B (en) | COMBINED GAS TURBINE DAMP TURBINE PLANT WITH CONNECTED COAL GAS GAS PLANT | |
AU2011311739A1 (en) | Continuous flow steam generator having an integrated reheater | |
SU1249180A1 (en) | Steam-turbine extraction plant | |
CN201858130U (en) | Novel frequency conversion driving system of boiler water feeding pump of large power unit of power plant | |
CN109113818A (en) | A kind of enhancing power plant flexibility therrmodynamic system | |
CN215863317U (en) | System for supplying steam by coupling combustion engine with solid heat storage | |
RU138055U1 (en) | MANEUVERED STEAM-GAS INSTALLATION WITH MULTIFUNCTIONAL VAPOR DISTRIBUTION NODES | |
SU1318702A1 (en) | Heat and power plant | |
CN219063429U (en) | Steam-water energy-saving system of biomass power plant | |
CN215723128U (en) | System for gas turbine coupling solid electricity heat accumulation satisfies industry steam | |
CN216113991U (en) | Boiler feed water nozzle with adjustable temperature | |
SU1321906A1 (en) | Air-driven power plant | |
CN210424968U (en) | Equipment for directly generating stable superheated steam | |
CN216079738U (en) | Gas turbine coupling fused salt heat storage steam supply system | |
Mehrgoo et al. | Developing a design method for optimal geometric and operating parameters of triple pressure heat recovery steam generator using the constructal theory | |
DE19544452A1 (en) | Condensation heat utilisation method for flue gas for district heating network | |
SU724785A1 (en) | Heat power plant | |
SU454360A1 (en) | Steam and gas installation | |
SU1236302A1 (en) | Air distribution device for condenser of steam-turbine plant | |
SU1249179A1 (en) | Power plant | |
SU941642A1 (en) | Steam-gas installation | |
SU1282623A1 (en) | Method of heating feedwater of steam generators of power plant | |
SU1227912A1 (en) | Boiler plant | |
SU1613661A1 (en) | Utilization steam-gas plant |