SU1248819A1 - Method of forming tubular articles from concrete mixes - Google Patents
Method of forming tubular articles from concrete mixes Download PDFInfo
- Publication number
- SU1248819A1 SU1248819A1 SU843788881A SU3788881A SU1248819A1 SU 1248819 A1 SU1248819 A1 SU 1248819A1 SU 843788881 A SU843788881 A SU 843788881A SU 3788881 A SU3788881 A SU 3788881A SU 1248819 A1 SU1248819 A1 SU 1248819A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mpa
- pressure
- minutes
- concrete
- shutter speed
- Prior art date
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Press-Shaping Or Shaping Using Conveyers (AREA)
Description
. . . .
Изобретение относитс к изготовлению трубчатых изделий и молсет быть использовано при изготовлении вибро- гидропрессованных.железобетонных на- порньгк труб.The invention relates to the manufacture of tubular products and molset to be used in the manufacture of vibro-pressurized. Reinforced concrete parquet pipes.
Цель из.обретени - повьниение ка- че.ства изделий.The purpose of the acquisition is to improve the quality of products.
Предложенный способ изготсзвлени виброгидропрессованных железобетонных напорных труб заключаетс в следующем. The proposed method of making vibrohydro-pressed reinforced concrete pressure pipes is as follows.
На виброплощадке осуществл ют укладку бетонной смеси в .форму с одновременным ее виброуплотнением. После уплотнени собранную форму с бетоном устанавливают на пост гидропрессовани и термообработки.Гид- ропр.есСов ание осуществл ют поэтапно по следующему режиму: I стади - подъем опрессовочного давлени до 0,2-0,25 МПа с вьщержкой его в те- чение 8-10 мин, II - последующий подъем давлени до 0,5-0,6 МПа с выдержкой в течение 15-17 мин, I.II - подъем давлени до .1,0-1,2 МПа с вьщержк.ой в течение 18-20 мин, IV - подъем давлени до 1,8-2,О МПа с выдержкой 10-12 мин, V - подъем давлени до 3,0-3,2 Шa с выдержкой 16-17 мин..По достижению проектного опрессовочного давлени 3,0-3,2 МПа начинают осуществл ть термообработку которую в течение всего дикла производ т при посто нном опрессовочном давлении 3,0-3,2 МПа до достижени передаточной прочности бетона. После этого осуществл ют плавньй спуск опрессовочного давлени и прекращают термообработку, после чего, процесс идет известным путем.On the vibrating plate, the concrete mixture is laid in the mold with its simultaneous vibroplate. After compaction, the assembled form with concrete is installed on the post of hydraulic pressing and heat treatment. Hydraulic assembly is carried out in stages according to the following mode: Stage I - raising the pressing pressure to 0.2-0.25 MPa with it held for 8- 10 min, II — subsequent pressure rise to 0.5–0.6 MPa with a delay for 15–17 min; I.II — pressure rise to .1.0-1.2 MPa with a pressure of 18–20 min. 20 min, IV - pressure rise up to 1.8-2, O MPa with an exposure of 10-12 min, V - pressure rise up to 3.0-3.2 Sha with an exposure of 16-17 min. By achieving the design pressing pressure 3 , 0-3,2 MPa n Chin which heat treatment is carried out for the entire Diklo effected at a constant test pressure 3.0-3.2 MPa until the transfer of concrete strength. After this, the pressing pressure is gently lowered and the heat treatment is stopped, after which the process proceeds in a known way.
Дл установки оптимальных параметров гидропрессовани проведены испытани , результаты которых сведе- -ны в таблиду.To establish the optimal parameters of hydraulic pressing, the tests were carried out, the results of which are summarized in the table.
Пример 1. Дл формовани .трубы диаметром 1000 мм и длиной 5-м берут бетонную смесь следуюпдего состава: портландцемент 500-550 кг, щебень фракдии 5-10 мм 980 кг, песок с модулем крупности 2,5-670 кг, вода 220 л (из расчета на 1 м -бетона). В наружную форму устанавливают спиральную арматуру и напр гают продольную арматуру. Далее форму устанавливают на сердечник и осуществл ю укладку бетонной смеси с одновременным виброуплотнением. После окончани уплотнени бетонной смеси форма пос19i .Example 1. To form a pipe with a diameter of 1000 mm and a length of 5 meters, a concrete mix is taken with the following composition: portland cement 500-550 kg, crushed stone 5-10 mm crushed stone 980 kg, sand with a modulus of 2.5-670 kg, water 220 l (based on 1 m-concrete). Spiral reinforcement is installed in the outer form and tension of longitudinal reinforcement is applied. Next, the mold is mounted on the core and the concrete is laid with simultaneous vibrating. After completion of the compaction of the concrete mix form pos19i.
тупает на пост гидропрессовани и термообработки. Гидропрессовакие .осуществл ют по следующему режиму: I стади - подъем опрессовочного давлени до 0,2 МПа и выдержка этого давлени в течение 8 мин, II - подъем давлени до 0,5 Ш1а и выдержка его в течение 15 мин, III - п одъем .давлени до 1 ,0. МПа и вьщержка 18 мин, IV - подъем давлени до 1,8 МПа и выдержка- 10 мин, V - подъем давле- ни до 3,0 МПа и выдержка 16 мин. По достижению опрерс-овочного давлени начинают термообработку, которую гфоизвод т при этом давлении до достижени передаточной прочности бетона . Затем осуществл ют плавный сгг/ск опрессовочного давлени и отключают термообработк.у. Далее процесс идег; известным путем. blunt on the post of hydraulic pressing and heat treatment. Hydropressing is carried out according to the following regime: Stage I - raising the pressing pressure to 0.2 MPa and holding this pressure for 8 minutes, II - raising the pressure to 0.5 Sh1a and holding it for 15 minutes, III - lifting it. pressure up to 1, 0. MPa and delivery 18 min., IV — pressure rise up to 1.8 MPa and holding time — 10 min, V — pressure rise up to 3.0 MPa and holding time, 16 min. Upon reaching operating pressure, heat treatment is started, which is produced at this pressure until the transfer strength of the concrete is achieved. Then, a continuous crushing pressure of the pressing pressure is carried out and the heat treatment is switched off. Next, the process goes; known by.
Физико-механические свойства трубы следующие, МПа: предел прочности ка сжатие 600,. водонепроницаемость 2,35, трещиностойкость 3/, напр же- ние в спиральной арматуре 1300.The physico-mechanical properties of the pipe are as follows, MPa: tensile strength ka compression 600 ,. water resistance 2.35, crack resistance 3 /, stress in spiral reinforcement 1300.
П р-и м е р 2. Дл формовани трубы 1000 мм и длиной 5 м берут бетонную смесь того же состава. .Пос- ле: уплотнени бетонной смеси процесс гвдропрессовани осуществл ют, по следующему режиму: I стади - подъем опрессовочного давлени до 0,25 МПа и выдерй ка этого давлени в течение 10 мин, II - подъем оцрессовочного давлени до 0,6 МЦа и выдержка в течение 17 мин, III - подъем опрессовочного давлени до 1,2 МПа и выдержка 20 мин, IV - подъем.давлени до 2,0 МПа и выдержка 12-мин, V - подъем давлени до 352 МПа и вьщержка 17 мин. При достижении опрессо- вочно.го давлени 3,2 МПа ос-уществл ют термообработку5 которую провод т при этом давлении до достижени передаточной прочности бетона. Далее процесс идет известным путем.Example 2. To form a pipe of 1000 mm and a length of 5 m, a concrete mix of the same composition is taken. .After: compaction of the concrete mixture, the hydraulic pressing process is carried out according to the following mode: Stage I - raising the pressing pressure to 0.25 MPa and wiping out this pressure for 10 minutes, II - raising the pressing pressure to 0.6 Mce and holding for 17 minutes, III - raising the pressing pressure to 1.2 MPa and holding for 20 minutes, IV - raising the pressure to 2.0 MPa and holding 12-minute, V - raising the pressure to 352 MPa and holding 17 minutes. Upon reaching a pressure of 3.2 MPa, heat treatment is carried out 5 which is carried out at this pressure to achieve the transfer strength of the concrete. Then the process follows a known path.
Физико-механические свойства тру- бы следуюи1;ие, МПа: предел прочности на сжатие 610, водонепроницаемость 2 5 4, трещиностойкость 3,1, напр жение в спиральной арматуре 1350.The physicomechanical properties of the pipe are as follows: 1, MPa: compressive strength 610, water tightness 2 5 4, crack resistance 3.1, stress in spiral fittings 1350.
Физико-механические свойства трубы ф 1000 И длиной 5 м, изготов.лен- ной в соответствии с базовым объектом , МПа: предел прочности на сжатие 420, водонепроницаемость 1,4, трещиностойкость 2,,4, напр жение в спиральной арматуре 900.The physicomechanical properties of a pipe, f 1000 and 5 m long, manufactured according to the basic object, MPa: compressive strength 420, water resistance 1.4, crack resistance 2, 4, stress in spiral reinforcement 900.
450450
1,71.7
2,2 10002.2 1000
15,415.4
600600
. 2,35. 2.35
3,0 13003.0 1300
2626
520520
2,02.0
2,5 12002.5 1200
1818
510510
1,91.9
2,4 11502.4 1150
1717
2,42.4
3,1 13503.1 1350
2727
Редактор, А, КозоризEditor, A, Kozoriz
Составитель Л. КарпеткинаCompiled by L. Karpetkina
Техред В.Кадар Корректор С. ЧерниTehred V. Kadar Proof-reader S. Cherni
Заказ 4174/15Тираж 555ПодписноеOrder 4174/15 Circulation 555Subscription
ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee
по делам изобретений и открытий 113035, Москва, Ж-35, Раушска наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5
Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна ,4Production and printing company, Uzhgorod, st. Project, 4
Продолжение таблицыTable continuation
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843788881A SU1248819A1 (en) | 1984-06-18 | 1984-06-18 | Method of forming tubular articles from concrete mixes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843788881A SU1248819A1 (en) | 1984-06-18 | 1984-06-18 | Method of forming tubular articles from concrete mixes |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1248819A1 true SU1248819A1 (en) | 1986-08-07 |
Family
ID=21137829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843788881A SU1248819A1 (en) | 1984-06-18 | 1984-06-18 | Method of forming tubular articles from concrete mixes |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1248819A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5182061A (en) * | 1990-07-20 | 1993-01-26 | Nisshinbo Industries, Inc. | Method of vibration-molding friction member |
-
1984
- 1984-06-18 SU SU843788881A patent/SU1248819A1/en active
Non-Patent Citations (1)
Title |
---|
Попов А.Н. и др. Производство железобетонных напорных труб вибро- гадропрессованием. Л.: Изд-во литературы по строительству, 1967, с. 60-70. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5182061A (en) * | 1990-07-20 | 1993-01-26 | Nisshinbo Industries, Inc. | Method of vibration-molding friction member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FI83631B (en) | Process for producing a hardened stone material product, in particular concrete, and a device which is intended for use in the process | |
CN110642564B (en) | Crude polypropylene-basalt hybrid fiber prefabricated hard fiber concrete, jacking pipe and manufacturing method | |
CN105818265A (en) | Steam-curing-free prestressed high-strength concrete centrifugal pipe pile material and preparing method thereof | |
RU2433038C1 (en) | Method to make modified fibrous concrete mixture and modified fibrous mixture | |
JP2506208B2 (en) | Asbestos inorganic cured product and method for producing the same | |
CN112159177A (en) | High-strength pervious concrete and preparation method thereof | |
SU1248819A1 (en) | Method of forming tubular articles from concrete mixes | |
CN109291240B (en) | Preparation process of coarse aggregate reactive powder concrete prefabricated bridge deck | |
US4127417A (en) | Method for improving workability of fresh fiber containing cement mortar and concrete | |
Ndong Engone et al. | Optimizing mortar extrusion using poplar wood sawdust for masonry building block | |
CN115504741A (en) | High-temperature-resistant hybrid fiber reinforced concrete and preparation method thereof | |
Karatas et al. | Effect of elazig region waste brick powder on strength and viscosity properties of self compacting mortar | |
RU2120926C1 (en) | Raw mix for manufacturing non-autoclave cellular concrete of natural hardening, and method of manufacturing products from cellular concrete | |
RU2200657C1 (en) | Method for making tubes of concrete mixtures | |
SU1315326A1 (en) | Method for manufacturing tubular articles | |
RU2095334C1 (en) | Method of preparing concrete mix | |
SU1235845A1 (en) | Method of preparing concrete mix based on large-size carbonate filler | |
SU1680520A1 (en) | Process for manufacturing pipes from concrete mixes | |
KR102547030B1 (en) | High Strength Concrete Composition for Polygons Shaped Precast Concrete | |
RU2165398C1 (en) | Method of preparing concrete mortar | |
RU2770375C1 (en) | Composite raw mix for the production of fiber-reinforced concrete | |
RU2010020C1 (en) | Process for preparation and proportion of concrete mix, process for prefabrication of concrete and reinforced concrete members, method for erection, restoration or renewal of buildings and engineering constructions | |
RU1778100C (en) | Method for producing concrete mix | |
RU2230048C2 (en) | Concrete mix preparation method | |
KR20180056016A (en) | Method for manufacturing pipe using concrete |