SU1222839A1 - Method of driving cut-throughs - Google Patents

Method of driving cut-throughs Download PDF

Info

Publication number
SU1222839A1
SU1222839A1 SU843792593A SU3792593A SU1222839A1 SU 1222839 A1 SU1222839 A1 SU 1222839A1 SU 843792593 A SU843792593 A SU 843792593A SU 3792593 A SU3792593 A SU 3792593A SU 1222839 A1 SU1222839 A1 SU 1222839A1
Authority
SU
USSR - Soviet Union
Prior art keywords
conveyor
coal
temporary support
face
loading
Prior art date
Application number
SU843792593A
Other languages
Russian (ru)
Inventor
Владимир Власович Храпунов
Анатолий Михайлович Нисенгольцев
Владимир Давыдович Беззубец
Виктор Николаевич Долгов
Владимир Иванович Фомичев
Original Assignee
Ордена Трудового Красного Знамени Гуковское Производственное Объединение По Добыче Угля "Гуковуголь"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ордена Трудового Красного Знамени Гуковское Производственное Объединение По Добыче Угля "Гуковуголь" filed Critical Ордена Трудового Красного Знамени Гуковское Производственное Объединение По Добыче Угля "Гуковуголь"
Priority to SU843792593A priority Critical patent/SU1222839A1/en
Application granted granted Critical
Publication of SU1222839A1 publication Critical patent/SU1222839A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Изобретение относитс  к горной промышленности и предназначено дл  проведени  разрезных печей и просеков по угольным пластам буровзрывным способом.The invention relates to the mining industry and is intended for conducting split furnaces and gaps along coal seams by drilling and blasting.

Цель изобретени  - повышение производительности труда и скорости проходки.The purpose of the invention is to increase labor productivity and the rate of penetration.

Способ осуществл етс  следующим образом .The method is carried out as follows.

В исходном положении в разрезной печи лавы размешены вентил ционный трубопровод и скребковый конвейер, снабженный толкател ми дл  подачи конвейера в забой и пассивными погрузочными лемехами дл  погрузки угл  на конвейер самонавалкой путем перемеш,ени  концевой части конвейера с помощью гидродомкратов передвижки. Забой и выработка на длине до 10 м закреплены временной металлической крепью. Рама временной крепи состоит из гидростойки жестко св занной с конвейером и установленной под консольный металлический верх- н к.In the initial position in a split lava kiln, there is a ventilation pipe and a scraper conveyor, equipped with pushers for feeding the conveyor to the bottom and passive loading plowshares for loading coal onto the conveyor by means of a self-sawing machine by stirring the end portion of the conveyor with the help of shifters. Slaughter and development on the length up to 10 m are fixed with temporary metal lining. The temporary support frame consists of a hydraulic rack rigidly connected to the conveyor and installed under the cantilever metal top.

Цикл начинают с бурени  щпуров и взрывани  в них зар дов ВВ. Количество щпуров в комплекте выбирают с учетом мощности зар дов, которые обеспечивают перемещение угл  силой взрыва к стороне выработки , свободной от оборудовани  и стоек крепи. После этого снимают распор с гидростоек временной консольной крепи, включаютThe cycle begins with drilling of knocks and blasting explosive charges in them. The number of knobs in the set is chosen taking into account the power of the charges, which ensure the movement of the coal by the explosion force to the side of production, free from equipment and lining racks. After that, remove the thrust from the girders of the temporary console support, include

гидродомкраты толкателей и задвигают в забой конвейер, при этом скребковую цепь конвейера предварительно рассоедин ют в устье выработки. При задвигании рещтач- ного става в забой нат жна  головка конвейера , снабженна  специальным лемехом, внедр етс  в отбитую массу угл . Затем распирают временную крепь, наращивают рещтачный став на величину его задвижки в забой и включают конвейер дл  погрузки угл , которую осуществл ют самонавалкой угл  на концевую часть конвейера , оборудованного пассивными лемехами. Погрузку угл  производ т путем последовательной передвижки концевой части кон , вейера к углю с помощью гидродомкратов. При этом передвижку конвейера выполн ют в зависимости от устойчивости пород кровли с подпором временной крепи или без него, а конвейер включают в работу только при полном распоре временной крепи.hydraulic jacks of the pushers and slide the conveyor into the face, while the scraper chain of the conveyor is pre-disconnected at the wellhead. When retracting the slide in the face, the tension head of the conveyor, equipped with a special plowshare, is inserted into the broken mass of coal. Then, temporary support is built up, a retractable stand becomes by the amount of its valve in the face and a conveyor is loaded for loading the coal, which the charger carries on to the end part of the conveyor equipped with passive plowshares. The coal is loaded by successively moving the end part of the end, the fan to the coal with the help of hydraulic jacks. In this case, shifting of the conveyor is performed depending on the stability of the roof rocks with or without temporary support, and the conveyor is only put into operation when the temporary support is fully seated.

Управление передвижкой конвейера и временной крепью ведут дистанционно с пульта управлени , наход щегос  под защитой посто нной крепи. После зачистки угл  концевую часть конвейера передвигают в исходное положение с помощью переносных гидродомкратов серийного производства. Затем устанавливают посто нную крепь и цикл проходки заверщаетс .Control of the conveyor movement and temporary support is carried out remotely from the control panel, which is protected by permanent support. After stripping the coal, the end part of the conveyor is moved to its original position with the help of portable hydraulic jacks of mass production. A permanent support is then installed and the penetration cycle is terminated.

Claims (1)

СПОСОБ ПРОХОДКИ РАЗРЕЗНЫХ ПЕЧЕЙ И ПРОСЕКОВ, включающий буровзрывную отбойку в забое и погрузку угля на концевую часть наращиваемого конвейера, установку стоек гидравлической временной крепи, отличающийся тем, что, с целью повышения производительности труда и скорости проходки, уголь отбивают на одну сторону проходимой забоем выработки, после чего конвейер задвигают в забой и к боку проходимой выработки, при этом погрузку угля производят самонавалкой, а стойки гидравлической временной крепи жестко соединяют с конвейером и передвигают вместе с ним.METHOD OF PASSING OF DIVISION FURNACES AND PUNCHES, including drilling and blasting in the face and loading coal onto the end of the conveyor to be mounted, installation of hydraulic temporary support supports, characterized in that, in order to increase labor productivity and penetration rate, coal is beaten on one side of the mine cut through, after which the conveyor is pushed into the face and to the side of the passable mine, while coal is loaded by self-loading, and the hydraulic temporary support supports are rigidly connected to the conveyor and moved to place with him. ND ND ND QO GO ςοND ND ND QO GO ςο
SU843792593A 1984-06-28 1984-06-28 Method of driving cut-throughs SU1222839A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843792593A SU1222839A1 (en) 1984-06-28 1984-06-28 Method of driving cut-throughs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843792593A SU1222839A1 (en) 1984-06-28 1984-06-28 Method of driving cut-throughs

Publications (1)

Publication Number Publication Date
SU1222839A1 true SU1222839A1 (en) 1986-04-07

Family

ID=21139227

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843792593A SU1222839A1 (en) 1984-06-28 1984-06-28 Method of driving cut-throughs

Country Status (1)

Country Link
SU (1) SU1222839A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Бурчаков А. С. и др. Процессы подземных горных работ.-М.: Недра, 1982, с.44. Опыт работы рационализаторов шахт ПО «Торезантрацит по сокращению применени ручного труда: Информлисток ЦБНТИ Мин- углепрома, УССР. Донецк, 1983. *

Similar Documents

Publication Publication Date Title
GB1498585A (en) Method of and apparatus for transferring material dislodged from a mine face
SU1222839A1 (en) Method of driving cut-throughs
US4216998A (en) Method of underground mining by pillar extraction
EP0795680B1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
RU2011833C1 (en) Shaft-sinking complex for driving rock workings
RU2515759C1 (en) Heading blast digger
CA1167316A (en) Blasting installation including guided carriage with drilling and explosing loading means
RU99113557A (en) METHOD FOR DEVELOPING SLIDING AND INCLINED COAL FORMS OF MEDIUM POWER
RU2144138C1 (en) Shaft-sinking set
SU1335706A1 (en) Shield support
SU1665038A1 (en) Method of driving narrow-face workings with separate coal and rock extraction
SU1810567A1 (en) Blast-protection guard of powered support
RU2003810C1 (en) Method for bringing powered mining complex to under seam roof in recoverable pillar
GB2035415A (en) Apparatus for driving an opening as part of mining operations
SU1548453A1 (en) Face-end power support
SU899989A2 (en) Power-roof support
SU754064A1 (en) Method of mining thick ore bodies
SU693017A1 (en) Method of mining mineral deposits
SU684142A1 (en) Method of exacavating roof-supporting ore pillars
SU1337517A1 (en) Method of combined underground/open mining of coal beds
SU1337522A1 (en) Method of mounting the support of machinized mining set on ground surface
SU1679036A1 (en) Method for supporting conjunction of longwall and working sections
SU1682563A1 (en) Method for working thick steep and inclined coal seams
SU1062400A1 (en) Power support for roof at borderline of driven working and caved-in space in pillar-less coal mining
SU1453024A1 (en) Method of supporting a mine working