SU1196509A1 SU843735247A SU3735247A SU1196509A1 SU 1196509 A1 SU1196509 A1 SU 1196509A1 SU 843735247 A SU843735247 A SU 843735247A SU 3735247 A SU3735247 A SU 3735247A SU 1196509 A1 SU1196509 A1 SU 1196509A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drilling
pipe
receiving tank
additional
hydraulic distributor
Prior art date
Application number
SU843735247A
Other languages
Russian (ru)
Inventor
Василий Сергеевич Рудиков
Сергей Павлович Лега
Павел Васильевич Кривошеев
Василий Павлович Еременко
Original Assignee
Всесоюзный Научно-Исследовательский Конструкторско-Технологический И Проектно-Изыскательский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательский Конструкторско-Технологический И Проектно-Изыскательский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу filed Critical Всесоюзный Научно-Исследовательский Конструкторско-Технологический И Проектно-Изыскательский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу
Priority to SU843735247A priority Critical patent/SU1196509A1/en
Application granted granted Critical
Publication of SU1196509A1 publication Critical patent/SU1196509A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

УСТРОЙСТВО ДЛЯ БУРЕНИЯ ВОССТАЮЩИХ СКВАЖИН, включающее буровой станок, буровой снар д с породоразрушающим инструментом и обратным клапаном, буровой насос с гидрораспределителем , приемную емкость дл  промывочной жидкости со сливным патрубком, герметизирующую устьевую обв зку, нагнетательный трубопровод, св зывающий гидрораспределитель с буровым снар дом, и отвод щий трубопровод с регулировочным механизмом, св зывающий устьевую обв зку с приемной емкостью, о тличающееi с   тем, что, с целью повышени  надежности работы устройства путем КЛ исключени  его зашламоваНи  и посто нного поддержани  избыточного давлени  в скважине, оно снабжено дополнительным регулировочньм механизмом, установленным на сливном патрубке, а буровой насос - дополнительным нагнетательным трубопроводом, соединенным с гидрораспределителем насоса и отвод щим патрубком. 9: СД о СОDEVICE FOR DRILLING ELEVATED WELLS, including a drilling rig, drilling rig with rock cutting tool and non-return valve, mud pump with hydraulic distributor, receiving tank for flushing fluid with drainage nozzle, sealing wellhead, discharge pipe, connecting hydraulic distributor with a drilling valve. and a discharge pipe with an adjusting mechanism, linking the wellhead to the receiving tank, in order to improve the reliability of the device and eliminate it by CL zashlamovaNi and maintain a constant overpressure in the borehole, it is provided with additional regulirovochnm mechanism mounted on the drain pipe and the mud pump - additional discharge conduit connected to the pump outlet valve and conductive pipe. 9: CD on CO

Description

Изобретение относитс  к области горного дела и может быть использова но при бурении восстающих и наклонно-восстакнцих скважин, преимуществен но в неустойчивых породах, дл  сооружени  дренажной системы из подземных горных выработок с целью защиты от подземных вод действующих и щнр .стро щихс  горнорудных предпри тий . Цель изобретени  - повышение надежности работы устройства путем исключени  его запшамовани  и посто нного поддержани «избыточного давлени  в скважине На чертеже представлено устройство дл  бурени  восстающих скважин. Устройство содержит герметизирующую устьевую оснастку 1, буровой станок 2, буровой снар д 3, долото 4 с обратным клапаном (не показан), буровой насос 5 с нагнетательным патрубком 6, нагнетательный трубопро вод 7, приемную емкость 8 дл  отработанной промывочной жидкости 9, отвод щий трубопровод 10, гидравлически соедин ющий приемную емкость 8 с кольцевым зазором 11 скважины. Приемна  емкость 8 вьтолнена в виде отстойника и снабжена дополнительным регулировочным механизмом 12, установленным на сливном патрубке 13 отвод щем очищенную от породы жидкость 14. Перед донолнительным регулировочным механизмом 12 установлен фильтрующий элемент 15. В нижней час ти приводна  емкость 8 имеет разгрузочный люк 16, а на входе отвод щего трубопровода - регулировочнь Й механизм 17. Нагнетательный патрубок 6 бурового насоса 5 снабжен гидрораспределителем 18, посредством которог промывочную жидкость подают как в бу ровой снар д 3 по нагнетательному тр бопроводу 7, так и в кольцевой зазор 11 скважины по дополнит-гльному н гнетательному трубопроводу 20. Устройство дл  бурени  восстающих скв-ажин работает следую п,им образом. При углубке скважнны промывочную жидкость 9 от бурового насоса 5 направл ют в гидрораспределнт«ль 18, а от него посредством переключател  19 в нагнетательный трубопровод 7 и далее через буровой снар д- 3 к долоту 4 и в кольцевой зазор 11. Омыва  забой скважины, она обогащаетс  час09 тицами разрушенной породы и-по отвод щему трубопроводу 10 поступает в приемную емкость 8. Регулировочный механизм 17 при этом полностью открыт . В приемной емкости 8 скорость течени  промывочной жидкости снижаетс  и частицы породы осаждаютс . Очищенна  промывочна  жидкость проходит фильтрующий элемент 15 и через регулировочный механизм 12 выходит в отвод щую канавку или зумпф. Требуемое давление в скважине поддерживают посредством дополнительного регулировочного механизма 12. По окончании углубки перед наращиванием очередной бурильной трубы вращатель бурового станка 2 отсоедин ют от бурового снар да 3 и возвращают в исходное положение. -При этом промывочную жидкость 9 от бурового насоса 5, поступающую в гидрораспредели- . тель 18, посредством переключател  19 направл ют в дополнительный трубопровод 20 и далее по отвод щему трубопроводу 10 через герметизирующую устьевую оснастку 1 в кольцевой зазор 11 скважины. Обратный клапан долота 4 закрывает проход промывочной жидкости в буровой снар д 3. Требуемое давление в системе поддерживают посто нным при помощи регулировочного механизма 12. Процесс чистки приемной емкости 8 производ т- периодически через открытый разгрузочный люк 16 после углубки бурового снар да 3 на 3/4 трубы. -При этом регулировочный механизм 17 полностью закрыт. Промывочна  жидкость от бурового насоса 5 поступает в кольцевой зазор 11 скважины как и в процессе наращивани  бурильной трубы. В этом случае требуемое давление в системе поддерживаетс  вентилем 21, установленным иа дополнительном трубопроводе 20. Процесс чистки приемной емкости 8 обычно совмещаетс  с процессом наращивани . После наращивани  продолжаетс  процесс бурени . Промывочна  жвдкость при этом подаетс  в скважину по трубам бурового снар да 3, регулировочный механизм 17 полностью открыт, а требуемое давление в скважине поддерживаетс  дополнительным регулировочным механизмом 12.The invention relates to the field of mining and can be used in the drilling of revolving and inclined recovery wells, mainly in unstable rocks, for constructing a drainage system from underground mines in order to protect existing and schnr mining enterprises from underground waters. The purpose of the invention is to increase the reliability of the device by eliminating its zapamozheni and constant maintenance of "excess pressure in the well". The drawing shows a device for drilling riser wells. The device contains a sealing wellhead rig 1, a drilling rig 2, a drilling projectile 3, a chisel 4 with a check valve (not shown), a drilling pump 5 with a discharge pipe 6, a discharge pipe 7, a receiving tank 8 for used flushing fluid 9, an outlet a pipeline 10 which hydraulically connects the receiving tank 8 with the annular gap 11 of the well. The receptacle 8 is filled in the form of a settling tank and equipped with an additional adjustment mechanism 12 installed on the drain pipe 13 which discharges the fluid cleared from the rock 14. A filter element 15 is installed in front of the additional adjustment mechanism 12. at the inlet of the outlet pipeline - adjusting mechanism 17. The discharge pipe 6 of the mud pump 5 is equipped with a hydraulic distributor 18, through which the flushing fluid is fed as in the drill screen 3 the injection pipeline 7 and the annular gap 11 of the well along the complementary injection pipeline 20. The device for drilling the rising wells-Azhin operates in the following way. With the deepening of the borehole, the flushing fluid 9 from the drilling pump 5 is directed to the hydraulic distribution valve 18, and from it by means of the switch 19 to the injection pipe 7 and then through the drill hole d-3 to the bit 4 and into the annular gap 11. it is enriched with particles of broken rock and through the discharge pipe 10 enters the receiving tank 8. The adjusting mechanism 17 is fully open. In the receiving tank 8, the flow rate of the washing liquid is reduced and the rock particles are precipitated. The cleaned flush fluid passes the filter element 15 and through the adjusting mechanism 12 enters the discharge groove or sump. The required pressure in the well is maintained by means of an additional adjustment mechanism 12. At the end of the dimple, before the next drill pipe is expanded, the rotator of the drilling rig 2 is disconnected from the drill 3 and returned to its original position. -At the same time, the flushing fluid 9 from the mud pump 5, flowing into the hydrodistributor-. By means of the switch 19, the heater 18 is directed to the additional pipeline 20 and further along the outlet pipeline 10 through the sealing wellhead equipment 1 to the annular gap 11 of the well. The check valve of the bit 4 closes the passage of flushing fluid in the drill hole 3. The required pressure in the system is kept constant by means of an adjustment mechanism 12. The cleaning process of the receiving tank 8 is performed periodically through the open discharge port 16 after the drill hole deepens 3/3 4 pipes. When this adjustment mechanism 17 is fully closed. The flushing fluid from the mud pump 5 enters the annular gap 11 of the well as in the process of building up the drill pipe. In this case, the required pressure in the system is maintained by a valve 21 installed with an additional pipeline 20. The cleaning process of the receiving tank 8 is usually combined with the buildup process. After buildup, the drilling process continues. At the same time, the flushing fluid is supplied to the well through the pipes of the drill bit 3, the adjusting mechanism 17 is completely open, and the required pressure in the well is maintained by an additional adjusting mechanism 12.

Claims (1)

УСТРОЙСТВО ДЛЯ БУРЕНИЯ ВОССТАЮЩИХ СКВАЖИН, включающее буровой станок, буровой снаряд с породоразрушающим инструментом и обратным клапаном, буровой насос с гидрораспределителем, приемную емкость для промывочной жидкости со сливным патрубком, герметизирующую устьевую обвязку, нагнетательный трубопровод, связывающий гидрораспределитель с буровым снарядом, и отводящий трубопровод с регулировочным механизмом, связывающий устьевую обвязку с приемной емкостью, о тличающеес я тем, что, с целью повышения надежности работы устройства путем исключения его зашламования и постоянного поддержания избыточного давления в скважине, оно снабжено дополнительным регулировочным механизмом, установленным на сливном патрубке, а буровой насос - дополнительным нагнетательным трубопроводом, соединенным с гидрораспределителём насоса и отводящим патрубком.DEVICE FOR DRILLING RISING WELLS, including a drilling rig, a drill with a rock cutting tool and a check valve, a mud pump with a hydraulic distributor, a receiving tank for flushing fluid with a drain pipe, a sealing wellhead piping, a pressure pipe that connects the hydraulic distributor to the drill pipe and adjustment mechanism that connects the wellhead harness with the receiving tank, which is characterized by the fact that, in order to increase the reliability of the device by and except for its sludge and constant maintenance of overpressure in the well, it is equipped with an additional adjusting mechanism installed on the drain pipe, and the mud pump with an additional discharge pipe connected to the pump control valve and the discharge pipe.
SU843735247A 1984-04-29 1984-04-29 Arrangement for drilling ascending holes SU1196509A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843735247A SU1196509A1 (en) 1984-04-29 1984-04-29 Arrangement for drilling ascending holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843735247A SU1196509A1 (en) 1984-04-29 1984-04-29 Arrangement for drilling ascending holes

Publications (1)

Publication Number Publication Date
SU1196509A1 true SU1196509A1 (en) 1985-12-07

Family

ID=21116878

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843735247A SU1196509A1 (en) 1984-04-29 1984-04-29 Arrangement for drilling ascending holes

Country Status (1)

Country Link
SU (1) SU1196509A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459921C2 (en) * 2010-11-26 2012-08-27 Общество с ограниченной ответственностью Научно-технический и экспертный центр новых экотехнологий в гидрогеологии и гидротехнике "НОВОТЭК" Device for opening artesian aquifers by rising, directional or downhole well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Шварц В,В. и др. Бурение восстающих дренажных скважин установкой. УДБ-1. - Шахтное строительство, 1971, № 5. Временные технические услови на бурение скважин дл местного замораживани пород комплексом КВШ-25-108. ВНИИОМШС, Харьков, 1981, с. 17-21, рис. 6. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2459921C2 (en) * 2010-11-26 2012-08-27 Общество с ограниченной ответственностью Научно-технический и экспертный центр новых экотехнологий в гидрогеологии и гидротехнике "НОВОТЭК" Device for opening artesian aquifers by rising, directional or downhole well

Similar Documents

Publication Publication Date Title
RU2586129C1 (en) System and method of controlling pressure in annular space of well shaft using gas-lift in return line of drilling mud
RU2341654C2 (en) Method and system of fluid medium recirculation in borehole system
US6216799B1 (en) Subsea pumping system and method for deepwater drilling
US4348058A (en) Method and apparatus for slurry borehole mining
RU2365744C1 (en) Method of simultaneously-separate extraction of hydrocarbons by electro-submersible pump and unit for its implementation (versions)
CA1100034A (en) Subterranean mining
EA200101138A1 (en) INJECTION-DRILLING MACHINE FOR DRILLING
US6494267B2 (en) Wellhead assembly for accessing an annulus in a well and a method for its use
EA010191B1 (en) Method of drilling a lossy formation
CN107575249B (en) High-pressure slurry wall protection method and device
NO20140691A1 (en) Flow controlled downhole tool
EP1332273A1 (en) Downhole valve device
NO325323B1 (en) Wellhead assembly for injecting a fluid
US4615388A (en) Method of producing supercritical carbon dioxide from wells
WO1999015758A2 (en) Subsea drill fluid pumping and treatment system for deepwater drilling
US4615389A (en) Method of producing supercritical carbon dioxide from wells
SU1196509A1 (en) Arrangement for drilling ascending holes
RU2146759C1 (en) Method for creation of gravel filter in well
EP1220972B1 (en) Underbalanced perforation
RU2129208C1 (en) Method for operation of gusher wells with use of gas-lift phenomenon of associated oil gas
CN220378242U (en) Colliery drilling sealing device
RU1772352C (en) Method for equipping head of raise or slant well
RU2250358C1 (en) Method and tool for construction of filtering well
SU989033A1 (en) Method of flushing wells from sediment
SU1263818A1 (en) Method of driving rising drainage hole