SU1165790A1 - Method of enhancing stability of excavation working - Google Patents
Method of enhancing stability of excavation working Download PDFInfo
- Publication number
- SU1165790A1 SU1165790A1 SU823522200A SU3522200A SU1165790A1 SU 1165790 A1 SU1165790 A1 SU 1165790A1 SU 823522200 A SU823522200 A SU 823522200A SU 3522200 A SU3522200 A SU 3522200A SU 1165790 A1 SU1165790 A1 SU 1165790A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- belt
- roof
- excavation
- lava
- rocks
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Description
Изобретение относится к горнодобывающей промышленности и может быть использовано при подземной разработке месторождений полезных ископаемых, залегающих, пластами малой и средней мощности при труднообрушаемых кровлях.The invention relates to the mining industry and can be used in the underground mining of mineral deposits, the underlying, layers of small and medium power with hard to destroy roofs.
Цель изобретения - снижение нагрузки на крепь выработки от зависающей консоли пород кровли и уменьшение расхода бетонного раствора.The purpose of the invention is to reduce the load on the lining of production from the hanging console rocks of the roof and reducing the consumption of concrete solution.
На фиг. 1 показана система раз-; работки · с. сохраняемой' после прохода лавы выемочной выработкой, план4, на фиг,2 - разрез А-А на фиг.1*, на фиг.3 - разрез Б-Б на фиг. 1.FIG. 1 shows a system of; work · s. preserved 'after the passage of lava by excavation production, plan 4 , fig 2, section aa-a in figure 1 *, figure 3 - section bb in fig. one.
Система разработки содержит вы- . емочную выработку 1, сохраняемую после прохода лавы на границе массив полезного ископаемого - выработанное пространство, лаву 2, создаваемый до подхода лавы пояс 3 упрочненных пород, шпуры 4 для введения упрочняющих растворов, насосную установку 5. для закачивания упрочняющего раствора, жёсткую крепь 6, секции 7 механизированной крепи со снятым ограждением и оборудованные выдвижными козырьками 8, зону 9 необрушенных пород не-’The development system contains you-. capacitive production 1, saved after the passage of lava on the border of the mineral massif - the developed space, lava 2, created before the approach of the lava belt 3 hardened rocks, bore-holes 4 for the introduction of reinforcing solutions, pump installation 5. for injection of reinforcing solution, rigid lining 6, section 7 mechanized roof supports with the fencing removed and equipped with retractable visors 8, zone 9 unbroken non- 'rocks
«к» 7."To" 7.
11657901165790
А-АAa
Фиг.ЗFig.Z
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823522200A SU1165790A1 (en) | 1982-12-16 | 1982-12-16 | Method of enhancing stability of excavation working |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823522200A SU1165790A1 (en) | 1982-12-16 | 1982-12-16 | Method of enhancing stability of excavation working |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1165790A1 true SU1165790A1 (en) | 1985-07-07 |
Family
ID=21039280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823522200A SU1165790A1 (en) | 1982-12-16 | 1982-12-16 | Method of enhancing stability of excavation working |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1165790A1 (en) |
-
1982
- 1982-12-16 SU SU823522200A patent/SU1165790A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2287666C2 (en) | Method for controlling usage of accompanying products from underground zones | |
CN113175325B (en) | Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection | |
CN102352769A (en) | Integrated mining method for commonly mining coal and gas of high mine | |
CN114837663B (en) | Construction method for improving recovery rate of fault waterproof coal pillar through ground pre-grouting | |
CN106150502A (en) | The method of coal column group is left in a kind of multistage ladder type construction residual exploiting field of filling second mining | |
SU1165790A1 (en) | Method of enhancing stability of excavation working | |
RU2405108C1 (en) | Method of mining thick steep deposits of unstable ores | |
US3026096A (en) | Methods for controlling underground water | |
Bell | Salt and subsidence in Cheshire, England | |
CN112879010B (en) | Foundation construction method for municipal engineering | |
CN114673502A (en) | Multi-mode disaster chain type treatment method based on bottom plate rock roadway | |
CN112593938A (en) | Intelligent mining-based large-section roadway prefabricated wall body coal-pillar-free mining method | |
RU2200840C2 (en) | Process of development of gently dipping and inclined coal formations with use of cleaning powered complexes | |
SU881331A1 (en) | Method of constructing shallow-depth tunnel in unsolid rock | |
RU2107818C1 (en) | Method for development of flat and inclined seams of minerals | |
CN113107579B (en) | Directional long drilling combined bottom plate cross drilling stereoscopic gas extraction method | |
RU2069268C1 (en) | Method for control of rock pressure in extraction of mineral beds at large depths | |
RU2536514C1 (en) | Chamber method of mining heavy, valuable, comminuted ore deposits | |
CN208280956U (en) | To waste fill oper cylinler shallow-hole shrinkage mining mineral building in one kind | |
SU1795100A1 (en) | Method for mining thick steeply dipping coal seams | |
RU2039259C1 (en) | Method for drainage of stoping block | |
RU2127367C1 (en) | Method for protecting soil from pollution with mine water | |
SU1754906A1 (en) | Method for degassing underworked coal measures | |
RU2065038C1 (en) | Method for increasing stability of roof rock | |
RU2034991C1 (en) | Method of suppressing dynamic effects at developing coal seams |