CN114673502A CN202210496959.3A CN202210496959A CN114673502A CN 114673502 A CN114673502 A CN 114673502A CN 202210496959 A CN202210496959 A CN 202210496959A CN 114673502 A CN114673502 A CN 114673502A
Authority
CN
China
Prior art keywords
coal
roadway
tunneling
coal seam
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210496959.3A
Other languages
Chinese (zh)
Other versions
CN114673502B (en
Inventor
徐吉钊
翟成
孙勇
郑仰峰
唐伟
丛钰洲
余旭
刘厅
李宇杰
朱薪宇
陈爱坤
丁熊
石克龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN202210496959.3A priority Critical patent/CN114673502B/en
Publication of CN114673502A publication Critical patent/CN114673502A/en
Application granted granted Critical
Publication of CN114673502B publication Critical patent/CN114673502B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/12Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Structural Engineering (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a multi-mode disaster chain type treatment method based on a bottom plate rock roadway, wherein before and during tunneling of a coal roadway, pressure relief, permeability enhancement and grouting reinforcement are sequentially carried out on a target coal seam by using a cross-layer drilling hole and a grouting drilling hole, so that a reinforcement area and a pressure relief area are combined, and a reinforcement-relaxation structure formed in such a way can improve the gas extraction efficiency on one hand and can ensure the safe excavation progress and the later-stage stability maintenance of the coal roadway on the other hand; secondly, secondary extraction of abnormal occurrence gas in the coal seam can be realized by utilizing the directional drilling during stoping of the working face, and full-coverage extraction of the gas in the coal seam is realized by combining with a conventional gas extraction method of the coal seam; and finally, after the working face extraction of the current coal roadway is completed, the coal gangue produced during the tunneling of new coal roadways and bottom plate rock roadways of other continuous working faces can be filled into the currently abandoned bottom plate rock roadway, and multiple purposes of saving gangue, improving cost, protecting surface ecological environment, preventing surface subsidence and the like can be simultaneously realized.

Description

Multi-mode disaster chain type treatment method based on bottom plate rock roadway
Technical Field
The invention relates to a multi-mode disaster chain type treatment method based on a bottom plate rock roadway, which is mainly suitable for practical projects of full-time and air extraction of gas in a high-gas low-permeability coal seam, efficient disposal of coal gangue and the like.
Background
The high-intensive mechanical mining mode enables coal mining to gradually extend to the deep part, the porosity and permeability of a coal bed are greatly reduced due to high ground stress, and the gas content and the gas pressure are greatly increased. In order to ensure the safe and smooth exploitation of coal seams, a series of coal seam pressure relief technologies and gas extraction methods are generally adopted to perform enhanced pressure relief extraction on pre-exploited coal seams, such as hydraulic fracturing, hydraulic punching, protective layer exploitation, bedding gas extraction, cross-bedding gas extraction and the like. The coal seam with the protective layer mining condition can adopt a protective layer mining method preferentially, and the coal seam without the protective layer mining condition controls gas disasters by means of a bottom plate rock roadway and a layer-penetrating drilling hole. Meanwhile, a large amount of coal gangue produced in the excavation process of different working faces is usually lifted to the ground from a mine for stacking, so that the operability of an underground space is ensured.
The existing floor rock roadway is usually used as a main place for gas disaster prevention and control before coal seam mining, and mainly relates to implementation of measures of cross-layer drilling gas extraction and hydraulic pressure relief and permeability improvement. The implementation of cross-layer drilling can realize the purposes of pressure relief of a coal seam and gas extraction to a certain extent, but some application limitations often exist in the actual production process: 1. the utilization efficiency of the existing bottom plate rock roadway is low, and most of the bottom plate rock roadways are designed for gas disaster modes and efficient gas extraction; 2. the hydraulic punching pressure relief means can effectively relieve the pressure of the coal seam structure, but the stability of the coal seam structure in the later coal seam tunneling process has more adverse effects; 3. for some coal seams containing complex geological structures, the pre-extraction of coal seam gas before single cross-layer drilling gas extraction cannot well reach the standard, and the continuous efficiency of working face extraction is greatly influenced; 4. after the overlying coal seam is mined, the bottom plate rock roadway is closed at present, and the larger roadway space after the closing is easy to cause stratum structure damage and surface subsidence. Meanwhile, the coal gangue stacked on the ground pollutes the ground environment, and the mixed coal blocks easy to self-ignite cause combustion accidents, thereby seriously threatening the ground production safety of mines. Therefore, it is urgently needed to provide a new method, which is one of the research directions in the industry, by considering different timeliness of the bottom plate rock roadway and respectively adopting specific means according to different stages of the bottom plate rock roadway, so that the dual effects of improving gas extraction and effective disposal of coal gangue are realized on the premise of ensuring the support stability of the bottom plate rock roadway.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a multi-mode disaster chain type treatment method based on a bottom plate rock roadway, which realizes the double effects of improving gas extraction and effective disposal of coal gangue on the premise of ensuring the support stability of the bottom plate rock roadway by respectively adopting specific means according to different stages of the bottom plate rock roadway by considering different timeliness of the bottom plate rock roadway.
In order to achieve the purpose, the invention adopts the technical scheme that: a multi-mode disaster chain type treatment method based on a bottom plate rock roadway comprises the following specific steps:
A. determining the initial position and the tunneling design path of a pre-tunneling coal roadway in a coal seam according to the condition of the coal seam, constructing a bottom plate rock roadway in a bottom plate rock stratum below the coal seam before tunneling the coal roadway, then drilling a plurality of cross-layer drill holes from a top plate of the bottom plate rock roadway to the same coal seam section, wherein the parts of the plurality of cross-layer drill holes in the same coal seam section are uniformly distributed on two sides of the initial position of the pre-tunneling coal roadway, and all the cross-layer drill holes penetrate through a target coal seam and enter the top plate rock stratum;
B. arranging hydraulic punching equipment in a bottom plate rock roadway, sequentially injecting high-pressure water into each cross-layer drill hole through the hydraulic punching equipment, wherein the punching pressure is 10-15 MPa, punching out coal around the cross-layer drill hole due to the action of high-pressure water erosion, the punching completion standard of each cross-layer drill hole is determined according to the coal output of each cross-layer drill hole, after the hydraulic punching of each cross-layer drill hole is finished, a pressure relief area is formed in each coal seam on two sides of the pre-excavation coal roadway, then, hole sealing is carried out on each cross-layer drill hole, each cross-layer drill hole is connected to a gas extraction pipeline through a pipeline for gas extraction, and the subsequent coal roadway can be conveniently excavated in the coal seam;
C. b, according to the coal roadway position and the tunneling design path determined in the step A, starting coal roadway tunneling, drilling a plurality of cross-layer drill holes from the top plate of the bottom plate rock roadway to the current coal seam section at set intervals according to the trend of the bottom plate rock roadway in the coal roadway tunneling process, and repeating the processing process in the step B to complete the arrangement of pressure relief areas on two sides of the coal roadway in tunneling; meanwhile, after a plurality of cross-layer drill holes are drilled each time, a plurality of grouting drill holes are constructed from the bottom plate rock roadway to the current coal seam section, each grouting drill hole is positioned around the coal roadway in tunneling, grouting materials are injected into each grouting drill hole by adopting grouting equipment, after the grouting materials are solidified, a strengthening area is formed around the coal roadway of the current coal seam section, and the strengthening area is closer to the coal roadway relative to the pressure relief area; then, a plurality of anchor rods are arranged from the inside of the coal roadway to the surrounding coal seam for supporting, so that a strengthening area and anchor rod supporting combined action are formed at set intervals, the overall stability during the coal roadway tunneling period is ensured until the whole coal roadway tunneling work is completed;
D. after the coal roadway tunneling work is finished, coal seam working face extraction is started, a plurality of directional drill holes are constructed from the bottom plate rock roadway to the coal body 30m in front of the coal seam working face in the extraction period, all the directional drill holes penetrate through the coal seam and enter the top plate rock stratum, and then all the directional drill holes are processed in the mode of the step B and secondary gas enhanced extraction is carried out, so that the safety and stability in the coal seam working face extraction process are guaranteed;
E. and after the mining of the working face of the current coal seam is finished, repeating the steps A to D, and after the same coal seam is separated from the current coal roadway by a certain distance, determining a new coal roadway and a bottom plate rock roadway, transporting coal gangue generated during the tunneling of the new coal roadway and the bottom plate rock roadway into the current bottom plate rock roadway for wet sealing filling, and simultaneously utilizing a currently formed pressure relief area during the tunneling of the new coal roadway, so that the tunneling efficiency of the coal roadway is improved on the premise of ensuring the safe and stable tunneling and subsequent use of the coal roadway.
And further, the coal output in the step B is obtained by multiplying the length of the cross-layer drill hole in the coal seam by the coal output per meter, wherein the coal output per meter is 1.5 t/m-3 t/m. Different layer-penetrating drill holes can have respective punching finishing standards through the judgment standard, so that the construction efficiency is effectively improved on the premise of realizing the pressure relief effect.
Further, the forming range of the strengthening area is 15-20 m away from the coal roadway; the forming range of the pressure relief area is 120-150 m away from the coal roadway. By adopting the set range, the construction quantity of various drill holes can be effectively reduced and the construction efficiency can be improved on the premise of ensuring the respective functions of a strengthening area and a pressure relief area in the process of coal roadway tunneling and the stoping of a later working face.
Further, the final hole positions of the cross-layer drilling hole, the grouting drilling hole and the directional drilling hole are all at least 1m into the roof rock stratum. This ensures the stability of the drilled holes.
Furthermore, all cross-layer drill holes on the same coal seam section are distributed in a fan shape along the coal seam, and the included angle between every two adjacent cross-layer drill holes on each side of the coal roadway is 30 degrees; the diameter of each cross-layer drill hole is 80-100 mm; the diameter of the grouting drill hole is 50-80 mm, and the diameter of the directional drill hole is 50-80 mm.
Furthermore, the construction form of directional drilling adopts the combined construction of high-position drilling and sequential drilling. The mode can better improve the gas extraction effect.
Further, the grouting material adopts cement mortar doped with a rapid coagulant, and the water cement ratio is 1: and 3, grouting equipment adopts a pneumatic grouting pump to perform grouting, and grouting time is controlled to be 30-40 min. The reinforcing strength of the reinforced area is better by adopting the grouting material.
Compared with the prior art, the invention considers the integration of three projects of gas comprehensive treatment, coal roadway rapid tunneling and stabilization and coal gangue on-site filling under different time effects of the bottom plate rock roadway, comprehensively considers the continuity of coal roadway mining and gas extraction on a time scale, improves the implementation efficiency of three-in-one of coal seam mining, gas treatment and gangue filling on a space scale, and improves the gas disaster prevention and control of a pre-mined coal seam and the in-situ disposal efficiency of coal gangue on other continuous working faces to the maximum extent on the basis of improving the utilization efficiency of the bottom plate rock roadway. Firstly, before and during tunneling of a coal roadway, pressure relief, permeability increase and grouting reinforcement are sequentially performed on a target coal seam by using a cross-layer drilling hole and a grouting drilling hole, so that a mode of combining a reinforcement area and a pressure relief area is formed around the coal roadway, wherein the reinforcement area is closer to the coal roadway, and the pressure relief area is positioned at two sides of the reinforcement area; secondly, secondary extraction of abnormally-occurring gas in the target coal seam can be realized by utilizing the directional drilling during stoping of the working face, and the full-coverage extraction of the gas in the coal seam is realized by combining with a conventional gas extraction method of the coal seam; finally, after the working face extraction of the current coal roadway is completed, the coal gangue produced when other continuous working faces are subjected to new coal roadway and bottom plate rock roadway tunneling can be filled into the currently abandoned bottom plate rock roadway, and multiple purposes of saving gangue, improving cost, protecting surface ecological environment, preventing surface subsidence and the like can be achieved; and the pressure relief area formed at present can be partially utilized when a new coal road is tunneled, so that the construction process is reduced and the tunneling efficiency of the coal road is improved on the premise of ensuring the safety and stability of the coal road tunneling and the subsequent use.
Drawings
FIG. 1 is a schematic view of the treatment construction of a coal roadway and a floor rock roadway according to the present invention;
FIG. 2 is a schematic view of a reinforcing section of the anchor rod during the driving of the coal roadway in FIG. 1;
FIG. 3 is a schematic cross-sectional view of the directional borehole spatial arrangement of FIG. 1;
FIG. 4 is a schematic diagram of the construction of the invention for treating multiple coal roadways and floor rock roadways.
In the figure: 1-coal bed; 2-bottom plate rock lane; 3-roof strata; 4-grouting and drilling; 5-drilling through layers; 6-coal road; 7-anchor rod; 8, directional drilling; i-a strengthening region; II-pressure relief area; III-in situ region.
Detailed Description
The present invention will be further explained below.
As shown in fig. 1, the method comprises the following specific steps:
A. determining the initial position and the tunneling design path of a pre-tunneling coal roadway 6 in a coal seam 1 according to the condition of the coal seam 1, constructing a bottom plate rock roadway 2 in a bottom plate rock stratum below the coal seam 1 before tunneling the coal roadway 6 after the tunneling is finished, then drilling a plurality of cross-layer drill holes 5 from a top plate of the bottom plate rock roadway 2 to the same coal seam section, wherein the parts of the plurality of cross-layer drill holes 5 in the same coal seam section are uniformly distributed on two sides of the initial position of the pre-tunneling coal roadway 6, and all the cross-layer drill holes 5 penetrate through a target coal seam 1 and enter a top plate rock stratum 3; each cross-layer drill hole 5 on the same coal seam section is distributed in a fan shape along the coal seam inclination, and the included angle between each adjacent cross-layer drill hole 5 on each side of the coal roadway 6 is 30 degrees; the diameter of each cross-layer drill hole 5 is 80-100 mm;
B. arranging hydraulic punching equipment in the bottom plate rock roadway 2, sequentially injecting high-pressure water into each cross drilling hole 5 through the hydraulic punching equipment, wherein the punching pressure is 10-15 MPa, coal bodies around the cross drilling holes 5 are punched out under the action of high-pressure water erosion, the punching completion standard of each cross drilling hole 5 is determined by the coal output of each cross drilling hole 5, the coal output is obtained by multiplying the length of the cross drilling hole 5 in the coal bed 1 by the coal output per meter, and the coal output per meter is 1.5 t/m-3 t/m. The different cross-layer drill holes 5 can have respective punching end standards through the judgment standard, so that the construction efficiency is effectively improved on the premise of realizing the pressure relief effect; after hydraulic punching of each cross-layer drill hole 5 is finished, forming a pressure relief area II in each coal seam 1 on two sides of the pre-tunneling coal roadway 6, then sealing each cross-layer drill hole 5, connecting each cross-layer drill hole 5 to a gas extraction pipeline through a pipeline for gas extraction, and facilitating tunneling of the subsequent coal roadway 6 in the coal seam 1;
C. b, starting to tunnel the coal roadway 6 according to the position of the coal roadway 6 determined in the step A and a tunneling design path, drilling a plurality of cross-layer drill holes 5 from the top plate of the bottom plate rock roadway 2 to the current coal seam section at set intervals according to the trend of the bottom plate rock roadway 2 in the tunneling process of the coal roadway 6, and repeating the processing process in the step B to complete the arrangement of pressure relief areas II at two sides of the coal roadway 6 in tunneling; meanwhile, after a plurality of cross-layer drill holes 5 are drilled each time, a plurality of grouting drill holes 4 are constructed from the floor rock roadway 2 to the current coal seam section, the diameter of each grouting drill hole 4 is 50-80 mm, each grouting drill hole 4 is located around the coal roadway 6 in the tunneling process, grouting materials are injected into each grouting drill hole 4 through grouting equipment, after the grouting materials are solidified, a strengthening area I is formed around the coal roadway 6 of the current coal seam section, and the strengthening area I is closer to the coal roadway 6 relative to the pressure relief area II; as shown in fig. 2, a plurality of anchor rods 7 are then arranged from the inside of the coal roadway 6 to the surrounding coal seam 1 for supporting, so that a strengthening region I is formed at set intervals and the anchor rods 7 support the combined action, thereby ensuring the overall stability of the coal roadway 6 during the tunneling process until the tunneling work of the whole coal roadway 6 is completed; wherein the formation range of the strengthening area I is 15-20 m away from the coal roadway; the forming range of the pressure relief area II is 120-150 m away from the coal roadway. By adopting the set range, the construction quantity of various drill holes can be effectively reduced and the construction efficiency can be improved on the premise of ensuring the respective functions of the strengthening area I and the pressure relief area II in the process of tunneling the coal roadway 6 and stoping the working face at the later stage;
D. after the tunneling work of the coal roadway 6 is completed, the stoping of the working face of the coal seam is started, as shown in fig. 3, a plurality of directional drill holes 8 are constructed from the bottom plate rock roadway 2 to the coal body 30m in front of the working face of the coal seam during the stoping, the diameter of each directional drill hole 8 is 50-80 mm, and the construction mode of each directional drill hole 8 adopts the combined construction of high-position drilling and sequential drilling. The mode can better improve the gas extraction effect; b, all the directional drill holes 8 penetrate through the coal seam 1 and enter the roof rock stratum 3, and then all the directional drill holes 8 are treated in the mode of the step B and then secondary gas enhanced extraction is carried out, so that safety and stability in the stoping process of the coal seam working face are guaranteed; the final hole positions of the cross-layer drill hole 5, the grouting drill hole 4 and the directional drill hole 8 enter the roof strata by at least 1 m. This ensures the stability of the drilled holes.
E. After the mining of the working face of the current coal seam is finished, repeating the steps A to D, and after the same coal seam is separated from the current coal roadway by a certain distance, determining a new coal roadway 6 and a bottom plate rock roadway 2 as shown in fig. 4, transporting coal gangue generated during the tunneling of the new coal roadway 6 and the bottom plate rock roadway 2 into the current bottom plate rock roadway 2 for wet sealing filling, and simultaneously utilizing a currently formed pressure relief area II during the tunneling of the new coal roadway 6, so that the tunneling efficiency of the coal roadway 6 is improved on the premise of ensuring the safe and stable tunneling and subsequent use of the coal roadway 6. The wet sealing filling process comprises the following steps: filling high-water material mixed coal gangue into the bottom plate rock roadway 2, and arranging a buried pipe to perform negative pressure extraction on air in a filling area; the injection pressure of the high-water material is 3-5 MPa, the injection volume is obtained by subtracting the filling volume of the coal gangue from the volume of the bottom plate rock roadway 2, and the air negative pressure extraction pressure is 700-900 kPa.
As an improvement of the invention, the grouting material adopts cement mortar doped with a rapid coagulant, and the water cement ratio is 1: and 3, grouting equipment adopts a pneumatic grouting pump to perform grouting, and grouting time is controlled to be 30-40 min. The reinforcing strength of the reinforcing area I is better by adopting the grouting material.
The above description is only of the preferred embodiments of the present invention, and it should be noted that: it will be apparent to those skilled in the art that various modifications and adaptations can be made without departing from the principles of the invention and these are intended to be within the scope of the invention.

Claims (7)

1. A multi-mode disaster chain type treatment method based on a bottom plate rock roadway is characterized by comprising the following specific steps:
A. determining the initial position and the tunneling design path of a pre-tunneling coal roadway in a coal seam according to the coal seam condition, constructing a bottom rock roadway in a bottom rock stratum below the coal seam before tunneling the coal roadway, then drilling a plurality of cross-layer drill holes from a top plate of the bottom rock roadway to the same coal seam section, uniformly distributing parts of the plurality of cross-layer drill holes in the same coal seam section on two sides of the initial position of the pre-tunneling coal roadway, and enabling all the cross-layer drill holes to penetrate through a target coal seam and enter the top rock stratum;
B. arranging hydraulic punching equipment in a bottom plate rock roadway, sequentially injecting high-pressure water into each cross-layer drill hole through the hydraulic punching equipment, wherein the punching pressure is 10-15 MPa, punching out coal around the cross-layer drill hole due to the action of high-pressure water erosion, the punching completion standard of each cross-layer drill hole is determined according to the coal output of each cross-layer drill hole, after the hydraulic punching of each cross-layer drill hole is finished, a pressure relief area is formed in each coal seam on two sides of the pre-excavation coal roadway, then, hole sealing is carried out on each cross-layer drill hole, each cross-layer drill hole is connected to a gas extraction pipeline through a pipeline for gas extraction, and the subsequent coal roadway can be conveniently excavated in the coal seam;
C. b, according to the coal roadway position and the tunneling design path determined in the step A, starting coal roadway tunneling, drilling a plurality of cross-layer drill holes from the top plate of the bottom plate rock roadway to the current coal seam section at set intervals according to the trend of the bottom plate rock roadway in the coal roadway tunneling process, and repeating the processing process in the step B to complete the arrangement of pressure relief areas on two sides of the coal roadway in tunneling; meanwhile, after a plurality of cross-layer drill holes are drilled each time, a plurality of grouting drill holes are constructed from the floor rock roadway to the current coal seam section, each grouting drill hole is positioned around the coal roadway in tunneling, grouting materials are injected into each grouting drill hole by adopting grouting equipment, after the grouting materials are solidified, a strengthening area is formed around the coal roadway of the current coal seam section, and the strengthening area is closer to the coal roadway relative to the pressure relief area; then, a plurality of anchor rods are arranged from the inside of the coal roadway to the surrounding coal seam for supporting, so that a strengthening area and anchor rod supporting combined action are formed at set intervals, the overall stability during the coal roadway tunneling period is ensured until the whole coal roadway tunneling work is completed;
D. after the coal roadway tunneling work is finished, coal seam working face extraction is started, a plurality of directional drill holes are constructed from the bottom plate rock roadway to the coal body 30m in front of the coal seam working face in the extraction period, all the directional drill holes penetrate through the coal seam and enter the top plate rock stratum, and then all the directional drill holes are processed in the mode of the step B and secondary gas enhanced extraction is carried out, so that the safety and stability in the coal seam working face extraction process are guaranteed;
E. and after the mining of the working face of the current coal seam is finished, repeating the steps A to D, and after the same coal seam is separated from the current coal roadway by a certain distance, determining a new coal roadway and a bottom plate rock roadway, transporting coal gangue generated during the tunneling of the new coal roadway and the bottom plate rock roadway into the current bottom plate rock roadway for wet sealing filling, and simultaneously utilizing a currently formed pressure relief area during the tunneling of the new coal roadway, so that the tunneling efficiency of the coal roadway is improved on the premise of ensuring the safe and stable tunneling and subsequent use of the coal roadway.
2. The method as claimed in claim 1, wherein the coal output in step B is obtained by multiplying the length of the cross drilled hole in the coal seam by the coal output per meter, wherein the coal output per meter is 1.5 t/m-3 t/m.
3. The method for multi-mode disaster chain management based on the floor rock roadway according to claim 1, wherein the formation range of the strengthened area is 15-20 m away from the coal roadway; the forming range of the pressure relief area is 120-150 m away from the coal roadway.
4. The method of claim 1, wherein the final hole positions of the cross-layer drilling hole, the grouting drilling hole and the directional drilling hole are at least 1m into the roof rock stratum.
5. The multimode disaster chain management method based on the floor rock roadway is characterized in that the cross-layer drill holes on the same coal seam section are distributed in a fan shape along the coal seam trend, and the included angle between the adjacent cross-layer drill holes on each side of the coal roadway is 30 degrees; the diameter of each cross-layer drill hole is 80-100 mm; the diameter of the grouting drill hole is 50-80 mm, and the diameter of the directional drill hole is 50-80 mm.
6. The method for multi-mode disaster chain control based on the floor rock roadway, according to claim 1, is characterized in that the construction form of directional drilling adopts combined construction of high-position drilling and in-layer drilling.
7. The method as claimed in claim 1, wherein the grouting material is cement mortar doped with a fast coagulant, and the water cement ratio is 1: and 3, grouting equipment adopts a pneumatic grouting pump to perform grouting, and grouting time is controlled to be 30-40 min.
CN202210496959.3A 2022-05-09 2022-05-09 Multi-mode disaster chain type treatment method based on bottom plate rock roadway Active CN114673502B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210496959.3A CN114673502B (en) 2022-05-09 2022-05-09 Multi-mode disaster chain type treatment method based on bottom plate rock roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210496959.3A CN114673502B (en) 2022-05-09 2022-05-09 Multi-mode disaster chain type treatment method based on bottom plate rock roadway

Publications (2)

Publication Number Publication Date
CN114673502A true CN114673502A (en) 2022-06-28
CN114673502B CN114673502B (en) 2022-12-02

Family

ID=82080663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210496959.3A Active CN114673502B (en) 2022-05-09 2022-05-09 Multi-mode disaster chain type treatment method based on bottom plate rock roadway

Country Status (1)

Country Link
CN (1) CN114673502B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115199269A (en) * 2022-07-08 2022-10-18 中国矿业大学 Multi-disaster integrated prevention and control method for island outburst coal seam strong and weak coupling structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409997A (en) * 2011-12-09 2012-04-11 中国矿业大学 Curtain grouting anti-burst method for cutting through coal and gas bursting seam in shaft
CN102900460A (en) * 2012-11-06 2013-01-30 中国矿业大学 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN103362538A (en) * 2013-07-15 2013-10-23 中国矿业大学 Coal seam cutting, fracturing, pressure pumping and alternating gas extraction method
CN104314610A (en) * 2014-10-11 2015-01-28 中煤科工集团重庆研究院有限公司 Coal road stripe region burst-preventing method
CN104863629A (en) * 2015-06-11 2015-08-26 中国矿业大学 Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN109113784A (en) * 2018-09-20 2019-01-01 中国矿业大学 A kind of coal bed gas extraction-water filling coupling device and method
CN112145225A (en) * 2020-09-22 2020-12-29 中煤能源研究院有限责任公司 Underground in-situ pulping and backfilling system and method for coal mine tunneling gangue
CN112664259A (en) * 2020-12-23 2021-04-16 中国矿业大学 Trinity comprehensive outburst prevention method for high outburst coal seam

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409997A (en) * 2011-12-09 2012-04-11 中国矿业大学 Curtain grouting anti-burst method for cutting through coal and gas bursting seam in shaft
CN102900460A (en) * 2012-11-06 2013-01-30 中国矿业大学 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN103362538A (en) * 2013-07-15 2013-10-23 中国矿业大学 Coal seam cutting, fracturing, pressure pumping and alternating gas extraction method
CN104314610A (en) * 2014-10-11 2015-01-28 中煤科工集团重庆研究院有限公司 Coal road stripe region burst-preventing method
CN104863629A (en) * 2015-06-11 2015-08-26 中国矿业大学 Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN108590739A (en) * 2018-04-11 2018-09-28 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN109113784A (en) * 2018-09-20 2019-01-01 中国矿业大学 A kind of coal bed gas extraction-water filling coupling device and method
CN112145225A (en) * 2020-09-22 2020-12-29 中煤能源研究院有限责任公司 Underground in-situ pulping and backfilling system and method for coal mine tunneling gangue
CN112664259A (en) * 2020-12-23 2021-04-16 中国矿业大学 Trinity comprehensive outburst prevention method for high outburst coal seam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115199269A (en) * 2022-07-08 2022-10-18 中国矿业大学 Multi-disaster integrated prevention and control method for island outburst coal seam strong and weak coupling structure

Also Published As

Publication number Publication date
CN114673502B (en) 2022-12-02

Similar Documents

Publication Publication Date Title
CN112360462B (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN108661705B (en) Strip goaf four-in-one comprehensive treatment construction method
WO2018201706A1 (en) Method for efficient gas drainage in coal roadway strips and regional outburst elimination through staged fracturing with long borehole floor beddings
CN112855223B (en) Coal roadway-advanced curtain space integrated grouting method after penetrating goaf wall
CN110374600B (en) Non-offset arrangement method for mining roadway of extremely-close coal seam group
CN104763434B (en) A kind of without coal column double lanes driving method
CN103104259A (en) Inclination fragmentation ore body segment top board reconstruction middle-deep hole ore break down filling mining method
CN106401645A (en) Pressure-relief support coordination control method for deep high-stress tunnel based on borehole pressure relief
CN111608726A (en) Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN103362117A (en) Full-section grouting method for grouting section
CN107120137A (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN206205903U (en) A kind of base plate release ruggedized construction of control deep tunnel bottom distension
CN112593939A (en) Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling
CN109779652A (en) A kind of expansion of coal-mine soft-rock tailentry is repaired and method for protecting support
CN106014443A (en) Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining
CN114673502B (en) Multi-mode disaster chain type treatment method based on bottom plate rock roadway
CN113153295A (en) Mining method for extremely thick hard coal
CN117108283B (en) Fluidized coal mining method utilizing self energy storage of coal seam
CN105756703B (en) A kind of placement method in room formula goaf
CN112879010B (en) Foundation construction method for municipal engineering
CN112174616B (en) Underground consolidation material and method for loose coal rock mass in small kiln damage area
CN113882860A (en) Control and water-retention exploitation method for paste filling surrounding rock under repeated mining condition
CN112664259A (en) Trinity comprehensive outburst prevention method for high outburst coal seam
CN104763423A (en) Technology for mining powder ore by inverse well rock drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant