SU1157218A1 - Apparatus for measuring yield of wells - Google Patents
Apparatus for measuring yield of wells Download PDFInfo
- Publication number
- SU1157218A1 SU1157218A1 SU823391675A SU3391675A SU1157218A1 SU 1157218 A1 SU1157218 A1 SU 1157218A1 SU 823391675 A SU823391675 A SU 823391675A SU 3391675 A SU3391675 A SU 3391675A SU 1157218 A1 SU1157218 A1 SU 1157218A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- wells
- well
- switching
- flow
- unit
- Prior art date
Links
Landscapes
- Flow Control (AREA)
Abstract
УСТРОЙСТВО ДЛЯ ЗАМЕРА ДЕБИТА СКВАЖИН, содержащее выкидные линии скважин, общие коллекторы низкого и высокого рабочих давлений, установленный на выкидной линии каждой скважины переключающий исполнительный орган , один выход которого соединен с общим, коллекторо.м соответствующего рабочего давлени , исполнительный коллектор, замернопереключающую установку и блок управлени и измерени дебита с.кважин, отличающеес тем, что, с целью повыщени надежности в работе, переключающий исполнительный орган выполнен в виде распределительного вентил , а наполнительный коллектор - в виде двух наполнительны.х линий соответственно низкого и высокого рабочих давлений, кажда из которых снабжена подключенным к блоку управлени и измерени дебита скважин запорным исполнительным органом, вход каждого из которых подключен к другому выходу распредели« тельного вентил всех скважин соответствующего рабочего давлени , выход которых подключен к замерно-переключающей установке . Т «.. сд ГчЭA DEVICE FOR MEASURING WELL DEPTHS, containing flow lines of wells, common collectors of low and high operating pressures, a switching actuator mounted on the flow line of each well, one outlet of which is connected to the common, a collector of the corresponding working pressure, an executive collector, metering unit and unit control and measurement of well flow rate, characterized in that, in order to increase operational reliability, the switching actuator is designed as a distributor the valve and the filling manifold are in the form of two filling lines of respectively low and high working pressures, each of which is equipped with a shut-off actuator connected to the control and flow measurement unit, each of which is connected to a different outlet of the distributor of all wells of appropriate working pressure, the output of which is connected to the metering and switching installation. T ".. cd GhE
Description
ИгШIgsh
-и-and
ZkZk
/ Изобретение относитс к измерению дебита нефтегазовых и газоконденсатных скважин . Известны устройства дл замера дебита скважин, содержащие выкидные линии скважин , общий коллектор, замерно-переключающую-установку , многоходовой переключатель , подключенный к выкидным лини м скважин и к замерно-переключающей установке , блок управлени 1. , Недостатком данных устройств вл етс отсутствие возможности измерени в одной замерно-переключающей установке дебитов скважин, имеющих различные рабочие давлени . Наиболее близким к изобретению по технической сущности вл етс устройство дл замера. дебита скважин, содержащее выкидные линии скважин и общие коллекторы низкого и высокого рабочих давлений, установленный на выкидной линии каждой скважины переключающий исполнительный орган, один выход которого соединен с общим коллектором соответствующего рабочего давлени , а другой выход - с наполни тельным коллектором, замерно-переключающую установку и блок управлени и измерени дебита скважин 2. Недостатком известного устройства вл етс ненадежность в работе из-за сложности его исполнени , обусловленной наличием большого количества переключающих исполнительных органов - по два запор ных исполнительных органа на выкидной линии каждой скважины, одни из которых направл ют продукцию скважин в общий коллектор соответствующего рабочего давлени , а другие - продукцию скважин через наполнительный коллектор в замернопереключающую установку. Большое количество запорных исполнительных органов усложн ет и соответственно снижает надежность также и системы управлени переклю чающими исполнительными органами. Цель изобретени -повышение надежности работы устройства дл замера дебита скв.ажии. Поставленна цель достигаетс тем, что устройство дл замера скважин, содержащсе выкидные линии скважин, общие коллекторы низкого и высокого рабочих давлений , установленный на выкидной линии каждой скважины переключающий исполнителькый орган, один выход которого соедипен с общим коллектором соответствую-50 щего рабочего давлени , наполнительный коллектор, замерно-переключающую установку и блок управлени и измерени дебита скважин, переключающий исполнительный орган выполнен в виде распределительного вентил , а наполнительный коллектор в виде двух наполнительных линий соответствепио низкого и высокого рабочих давлеНИИ , кажда из которых снабжена подключенным к блоку управлени и измерени дебита скважин запорным исполнительным органом, вход каждого из которых подключен к другому выходу распределительного вентил всех скважин соответствующего рабочего давлени , выход которых подключен к замерно-переключающей установке. На чертеже показана принципиальна схема предлагаемого устройства дл замера дебита скважин. Устройство содержит выкидные линии 1 и 2 соответственно скважин низкого и высокого рабочих давлений (показаны по три скважины низкого и высокого рабочих давлений ). Выкидные линии 1 скважин низкого давлени подключены к входу распределительного вентил 3, а выкидные линии 2 скважин высокого давлени - к входу распреде 1ительного вентил 4. Одни выходы распределительных вентилей 3 и 4 подключены соответственно через наполнительные линии 5 и 6 и запорные исполнительные органы 7 и 8 к замерно-переключающей установке 9, а вторые выходы распределительных вентилей 3 и 4 подключены соответственно к общему коллектору 10 низкого давлени и к общему коллектору 11 высокого давлени . Распределительные вентили 3 и 4, запорные исполнительные органы 7 и 8 и замерно-переключающа установка 9 подк ,пючены к блоку 12 управлени и измерени дебита скважин. Устройство работает следующим образом. В рабочем режиме газожидкостные продукции скважин низкого и высокого рабочих давлений через соответствующие линии 1 и 2 и распределительные вентили 3 и 4 поступают в соответствующие общие коллекторы 10 и 11. При измерении дебита скважины низкого рабочего давлени подаетс команда с блока 12 управлени и измерени дебита скважин на переключение распределительного органа 3 и открытие запорного исполнительного органа 7, при которой продукци данной скважины прекращает поступать в общий коллектор 10 низкого давлени и направл етс через наполнительную линию 5 в замерно-переключающую установку 9. Блоком 12 управлени и измерени дебита скважип совместно с замерно-переключающей установкой 9 осуществл етс измерение дебита скважины низкого давлени , По окончании измерени дебита скважины с блока 12 управлени и измерени дебита скважин подаетс команда на обратное переключение распределительного вентил 3. При этом продукци данной скважины вновь направл етс в общий коллектор 10 низкого давлени .The invention relates to measuring the flow rate of oil and gas and gas condensate wells. Devices for measuring well production are known, which contain flow lines of wells, a common collector, a metering and switching unit, a multi-way switch connected to the flowlines of the well and a metering unit, the control unit 1. The disadvantage of these devices is the lack of measurement capability in one metering and switching setting of flow rates of wells with different working pressures. Closest to the invention to the technical essence is a device for measuring. well flow rate, containing well flow lines and common low and high pressure common collectors, switching actuator mounted on the flow line of each well, one outlet of which is connected to the common manifold of the corresponding working pressure and the other outlet to the filling manifold, metering and switching unit and a well control and measurement unit 2. A disadvantage of the known device is the unreliability in operation due to the complexity of its execution, due to the presence of a large t he switching executive bodies - two constipation GOVERNMENTAL executive authority for flowline each well, one of which is directed in the production wells common header corresponding working pressure, and others - the production wells through fill manifold zamernopereklyuchayuschuyu installation. The large number of shut-off actuators complicates and, accordingly, reduces the reliability of the control systems of the switching actuators as well. The purpose of the invention is to increase the reliability of the device for measuring the flow rate of a well. The goal is achieved by the fact that a device for measuring wells, containing flow lines of wells, common collectors of low and high operating pressures, is installed on the flow line of each well a switching body, one output of which is connected to a common collector of the corresponding working pressure, filling manifold , a metering and switching unit and a well flow rate control and measurement unit, the switching actuator is designed as a distribution valve, and A collector in the form of two filling lines corresponds to low and high working pressures, each of which is equipped with a shut-off actuator connected to the well control and flow measurement unit, the input of each of which is connected to a different outlet of the distribution valve of all wells of the corresponding working pressure, the output of which is connected to metering -Switching installation. The drawing shows a schematic diagram of the proposed device for measuring the flow rate of wells. The device contains discharge lines 1 and 2, respectively, of wells of low and high operating pressures (three wells of low and high operating pressures are shown each). Flow lines 1 of low pressure wells are connected to the inlet of distribution valve 3, and flow lines 2 of high pressure wells are connected to the input of distribution valve 4. Some outputs of distribution valves 3 and 4 are connected respectively via filling lines 5 and 6 and shut-off actuators 7 and 8 to the metering and switching unit 9, and the second outputs of the distribution valves 3 and 4 are connected respectively to the common low pressure collector 10 and to the common high pressure common collector 11. Distributive valves 3 and 4, shut-off actuators 7 and 8, and a metering and switching unit 9 are fitted to a unit 12 for controlling and measuring well production. The device works as follows. In the operating mode, gas-liquid products of low and high working pressure wells through the corresponding lines 1 and 2 and distribution valves 3 and 4 enter the corresponding common collectors 10 and 11. When measuring the flow rate of the low working pressure, the command from the well control unit 12 is measured and switching of the distributor body 3 and opening of the shut-off actuator 7, in which the production of this well stops flowing into the common low pressure manifold 10 and is directed through the bottom The main line 5 is connected to the metering and switching unit 9. The control and well flow measurement unit 12 together with the metering and switching unit 9 measures the low pressure well flow. At the end of the well flow measurement, a reverse switch command is sent from the well control unit 12 and the well flow measurement distribution valve 3. At the same time, the production of this well is again directed to the common low pressure manifold 10.
Аналогично измер етс дебит других скважин низкого рабочего давлени .The flow rate of other low operating pressure wells is measured similarly.
При завершении измерени дебита скважин низкого рабочего давлени с блока 12 управлени и измерени дебита скважин подаетс команда на закрытие запорного исполнительного органа 7.At the completion of the measurement of the flow rate of the low working pressure, the control and measurement of the flow rate of the wells 12 is given a command to close the stop valve 7.
Дл измерени дебита скважины высокого рабочего давлени подаетс команда с блока 12 управлени и измерени дебита скважин на переключение распределительного вентил 4 и открытие запорного исполнительного органа 8, при которой продукци данной скважины прекращает поступать в общий коллектор 11 высокого давлени иTo measure the flow rate of the high working pressure, a command is sent from the control unit 12 and the measurement of the flow rate to switch the distribution valve 4 and open the shut-off actuator 8, at which the production of this well stops flowing into the common high-pressure collector 11 and
направл етс через наполнительную линию 6 и открытый запорный исполнительный орган 8 в замерно-переключающую установку 9.is directed through the filling line 6 and the open shut-off valve 8 to the metering and switching unit 9.
По окончании измерени дебита данной скважины с блока 12 управлени и измерени дебита скважин подаетс команда на обратное переключение распределительного вентил 4 данной скважины высокого рабочего давлени .At the end of the measurement of the flow rate of the well, the control unit 12 and the measurement of the flow rate of the wells are given a command to reverse switch the distribution valve 4 of this well to a high operating pressure.
После измерени дебита всех скважин высокого давлени с блока 12 управлени и измерени дебита скважин подаетс команда на закрытие запорного исполнительного органа 8.After measuring the flow rate of all the high pressure wells, the control unit 12 and measuring the flow rate of wells are instructed to close the stop valve 8.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823391675A SU1157218A1 (en) | 1982-05-27 | 1982-05-27 | Apparatus for measuring yield of wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823391675A SU1157218A1 (en) | 1982-05-27 | 1982-05-27 | Apparatus for measuring yield of wells |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1157218A1 true SU1157218A1 (en) | 1985-05-23 |
Family
ID=20995782
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823391675A SU1157218A1 (en) | 1982-05-27 | 1982-05-27 | Apparatus for measuring yield of wells |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1157218A1 (en) |
-
1982
- 1982-05-27 SU SU823391675A patent/SU1157218A1/en active
Non-Patent Citations (1)
Title |
---|
1. Свердлов Г. М. и Ягудин Р. Ю. Технологические объекты нефтедобывающих предпри тий и их автоматизаци . М.. «Недра, 1985, с. 29-31. 2. Авторское свидетельство СССР № 881308,кл. Е 21 В 47/10. 1978. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1157218A1 (en) | Apparatus for measuring yield of wells | |
US4290298A (en) | System for in situ meter testing | |
GB1305613A (en) | ||
ES8402421A1 (en) | Device for testing leaks and cleaning conduits by circulation of a fluid. | |
SU1038471A1 (en) | Device for measuring well yield | |
US3582038A (en) | Safety apparatus for remote control of valves | |
GB934719A (en) | Liquid fill valve arrangement | |
SU888876A1 (en) | Automated sprinkling machine | |
SU883453A1 (en) | Twin-barrel pulsed water gun | |
SU1086352A1 (en) | Method of determination of direct-acting valve operating presure | |
SU1267165A1 (en) | Rig for testing flowmeters and liquid counters | |
SU1093899A1 (en) | Liquid consumption measuring system | |
CN109113602B (en) | Intelligent integrated continuous circulation device for petroleum drilling | |
US2844029A (en) | Apparatus for producing stripper wells | |
SU959040A1 (en) | System for consecutive time-metered feed of fluid medium | |
SU881308A1 (en) | Device for measuring well yield | |
SU1668549A1 (en) | Water distributing system for irrigating channel | |
RU11297U1 (en) | INSTALLATION FOR SELECTIVE MEASUREMENT OF PRODUCTIVITY OF OIL SOURCES AT GROUP GROUP ACCOUNTING | |
SU1620622A1 (en) | Device for measuring yield of wells | |
SU1048324A2 (en) | Liquid meter checking device | |
SU1155212A2 (en) | Command pulse generator for closed irrigation system | |
WO1991000972A1 (en) | Valve with pressure equalizing | |
SU829667A1 (en) | Unit for product sulfitizing | |
ES2007218A6 (en) | Water trap valve for fail safe operation of an air inleakage monitoring system in a steam turbine | |
SU840418A1 (en) | Steam turbine control valve drive |