SU1139802A1 - Drainage for soil area - Google Patents

Drainage for soil area Download PDF

Info

Publication number
SU1139802A1
SU1139802A1 SU833611805A SU3611805A SU1139802A1 SU 1139802 A1 SU1139802 A1 SU 1139802A1 SU 833611805 A SU833611805 A SU 833611805A SU 3611805 A SU3611805 A SU 3611805A SU 1139802 A1 SU1139802 A1 SU 1139802A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drainage
wells
drain
drift
broadened
Prior art date
Application number
SU833611805A
Other languages
Russian (ru)
Inventor
Владимир Викторович Соловьев
Юрий Викторович Литинский
Анатолий Анатольевич Петров
Юрий Моисеевич Рыскинд
Матвей Иванович Минькин
Original Assignee
Предприятие П/Я А-1372
Предприятие П/Я М-5703
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-1372, Предприятие П/Я М-5703 filed Critical Предприятие П/Я А-1372
Priority to SU833611805A priority Critical patent/SU1139802A1/en
Application granted granted Critical
Publication of SU1139802A1 publication Critical patent/SU1139802A1/en

Links

Abstract

ДРЕНА( МАССИВА ГРУНТА, преим тдественно при добыче полезных ископаемых, включаюпщй водоотводньй штрак, соединенную с г-шм приемную камеру с зумпфом и отход щие от штрека наклонно-восстающие скважины о т л и Ч а ю щ и и с   тем. целью сокращени  затрат и продолжительности осушени  на наклонном водоупоре, он снабжен расположенной параллельно штреку выше по уклону уширенной дреной, объедин ющей концы наклонно-восстающих скважин, и расположенными в верхней полусфере уширенной дрены дополнительными скважинами, соединеннымигс дреной по крайней мере по одной в каждом месте примыкани  наклонно-восстающих скважин, причем кажда  из последних имеет установленную внутри фильтровую трубу из легко разрушаемого материала, приемна  камера размещена на конце уширенной дрены, ; а штрек расположен поперек уклона.DRAIN (GROUND MASSIF, mainly in the extraction of minerals, including drainage fines, connected to the g-shm sump receiving chamber and diverging from the drift wells, and so with the aim of reducing costs and the duration of drainage on an inclined aqueduct, it is provided with a broadened drainage parallel to the drift up the slope, connecting the ends of the inclined-rising wells, and additional wells located in the upper hemisphere of the broadened drains at least one abutment at each deviated boreholes, each of the latter is mounted inside the filter tube from readily breakable material receiving chamber located at the end broadened drains; drift and located across a slope.

Description

Изобретение относ тс  к осушению подземных выработок, в частности к осушению при поьющн дрен массивов грунта,, преиму1 ;ественно при добыче полезных к:копас1-)ых. Известен дренаж массива грунта, включающий образованные взрьгоом котлы и зоны пскусствспиой трещиноватости и соедшпгтельнме каналы, заполненные щебнем 1J. Недостаток этого дренажа заключаетс  в снижении Лнльтрационных свойств мелкозернистых пород при осущестйлении взрывов Кроме того, образование котлов технически сложно на рапном рассто нии, что снижает эффективность осушени  грунта. Наиболее близким к предлагаемому  вп стс  дренаж массива грунта при добыче полезных ископаемых, вклю .чаюи9-1Й водоотводньй штрек, соединен ную с ним приемную камеру с зумпфом и отход ш,ие от штрека наклонно-восстающие сква атаы С2. Иедостаткаг-ш данного дренажа  вл ютс  большой объем подготовительньп выработок и сложность их проход ки в неосушенном грунте с образованием фильтрующей завесы, что приводит к повышению стоимости осушени  и длительности его выполнени . Цель изобретени  - сокращение затрат и продолжительности осушени  Поставленна  цель достигаетс  тем, что дреназс массива грунта, преимущественно при добыче полезны ископаемых, вкл1очаюш,ий водоотводтн й штрек, соединенную с ним приемную камеру с з тчпфом и отход щие от штр ка наклонно-восстаюЕр1е скважины, снабжен расположен1 ой параллельно штреку вьпив по уклону уширенной дре ной, объедин ющей концы наклонно-во стающих скважин, и расположенными в верхней полусфере уширенной дрены дополнительнылм скважинами, соедине ными с дреной по крайней мере по одной в каждом месте при -11 н :ани  на лонно-восстающих скважин, причем кажда  , з последних имеет установленную внутри фильтровую трубу из легко разрушаемого материала, прие на  камера размещена на конце ушир ной /tpeTibi, а игрек расположен поп рок уклона, , 1 изображено расположен э,чеме 1ТО13 дре}1ажа на участке осуше ПИЯ, на фиг, 2 - разрез А-А на фиг.1; на фиг. 3 - узел I на фиг. 1. Дренаж массива грунта, прекмущаственно при добьне полезных ископае ых , имеет расположенный поперек уклона водоотводный штрек 1, которьй совмещаетс  с откаточным пр;; тшследукл ей разработке массива 2 полезных ископаемых, отход щие от штрека 1 наклон1ю-восстающие скважины 3, которые идут вверх по уклону с равными между ними промежутками, объедин ющую концы скваж1 н 3 уширенную дрену 4, размещенную параллельно штреку 15 расположенную на одном конце дрены 4 приемную дл  воды камеру 5 с зумпфом 6, соедин ющие камеру 5 с водоотводным штреком 1 выработки 7 и 8, расход щиес  от упшренной дрены 4 в пределах ее верхней полусферы дополнительные скважины 9, соединенные с дреной 4 по крайней мере но одной в каждом месте примыкани  наклонно-восстающих скважин 3. Дополнительные скважины 9 имеют размещенные внутри их фильтровые трубы 10 с фильтровой сеткой (не по-... казаны.) и пробкой 1 1 на внешнем торце . Наклонно-восстагощие скважины 3 также имеют фильтровые трубы 12, вьшолненные из легко разрушаемого материала, поддающегос  разр5П ению нар ду с полезными ископаемыми при механизированной их добыче, например из полиэтилена, В скважинах 3 размещены съемные пакеры 13, установленные на штангах 14. Уширенна  дрена 4 имеет фильтровый каркас 15 с уширенной гравийной обсыпкой 16. Дренаж работает следующим образом. После выполнени  гравийной обсыпки 16 из наклонно-восстающих скважин 3удал ютс  посредством штанг 14 временно установленные пакеры 13, которые в период выполнени  дрены 4предотвращают засорение гравием внутренней части фильтровых труб 12. При расположении массива 2 полезны : ископаемых на наклонном водоупоре 17 наибольший приток воды будет поступать из вышележащего по уклону массива 18. При этом основной поток воды перехватываетс  уширенной дреной 4, а вода, поступающа  из массива 18, расположенного выгле дрены 4, перехватьтаетс  дополнительными скважинами 9, кото3 The invention relates to the dewatering of underground workings, in particular, to the drainage of soil massifs with increasing drainage, advantageously during the extraction of minerals useful for: dangers. The drainage of the soil mass is well-known, including boilers formed by explosion and zones of fractured joints and channels filled with crushed stone 1J. The disadvantage of this drainage lies in the reduction of the Lltration properties of fine-grained rocks during explosive blasting. Moreover, the formation of boilers is technically difficult at a rapid distance, which reduces the efficiency of drainage of the soil. Closest to the proposed drainage of the soil mass during mining operations, including the drainage drainage drift, the receiving chamber with the sump connected to it and the waste well, from the drift, inclined-rising wells of C2. The disadvantage of this drainage is the large amount of preparatory workings and the complexity of their passage in undrained soil with the formation of a filter curtain, which leads to an increase in the cost of drainage and the duration of its implementation. The purpose of the invention is to reduce the cost and duration of drainage. The goal is achieved by the fact that the drainage of an array of soil, minerals are mainly useful for mining, including the drainage roadway connected to it, a receiving chamber with an HHPF and an inclined-recovered well bore from the liner. It is equipped with a parallel drift along the slope of the broadened tree connecting the ends of the inclined stationing wells and located in the upper hemisphere of the broadened drain of additional wells connected to the drains along the One at each place at -11 n: an on the well-rising wells, and each of them has a filter tube of easily destructible material installed inside, the camera is placed at the end of the wider / tpeTibi, and the pop rock bias,, 1 is depicted located e, than 1TO13 dre} 1azh on the site of drying PIA, in Fig, 2 - section A-A in figure 1; in fig. 3 shows the node I in FIG. 1. Drainage of the soil mass, preliminarily with the addition of useful minerals, has a drainage raft 1 located across the slope, which is combined with a hauling ave ;; following the development of array 2 of minerals, deviating from the drift 1, inclined-rising wells 3, which go up the slope with equal intervals between them, uniting the ends of the well 3 and 3, the broadened drain 4 located parallel to the drift 15 located at one end of the drain 4 a water receiving chamber 5 with a sump 6 connecting the chamber 5 with a drainage drift 1 of mine 7 and 8, consumed from an emergency drain 4 within its upper hemisphere additional wells 9 connected to the drain 4 at least one in each place adjoining inclined wells 3. Additional wells 9 have filter tubes 10 placed inside them with a filter screen (not -... cauldrons) and plug 1 1 at the outer end. Oblique recovery wells 3 also have filter tubes 12 made of easily destructible material that can be disintegrated along with minerals in their mechanized production, for example of polyethylene. In wells 3 there are removable packers 13 installed on rods 14. Width of drain 4 has a filter frame 15 with a wider gravel sprinkling 16. Drainage works as follows. After the gravel bedding 16 from the inclined-rising wells 3 are removed by means of rods 14 temporarily installed packers 13, which during the execution period of the drain 4 prevent the gravel from clogging up the inside of the filter pipes 12. When the array 2 is located, the minerals on the inclined aquifer 17 will receive the greatest amount of water from the overlying slope of the array 18. In this case, the main stream of water is intercepted by the broadened drain 4, and the water coming from the array 18, located on the bottom of the drain 4, is intercepted by an additional GOVERNMENTAL wells 9, koto3

рые при необходимости могут быть расположены не по одной у каждого места примыкани  скважин 3, а по несколько в виде веера.If necessary, rye can be located not one at each place of adjoining wells 3, but several as a fan.

Поступивша  в дрену 4 грунтова  вода по скважинам 9 и через гравийную обсыпку 16 самотеком направл етс  в приемную камеру 5 с зумпфом 6, из которой вода.по вьфаботкам 7 и 8 поступает в штрек 1 и далее по нему в систему водоотлива (не показана).The groundwater that entered the drain 4 flows through the wells 9 and through the gravel dusting 16 by gravity into the receiving chamber 5 with the sump 6, from which the water supply 7 and 8 enters the drift 1 and further along it into the drainage system (not shown).

Часть воды из дрены 4 проникает через гравийную обсьшку 16 в наклонно-восстающие скважины 3 и по ним попадает в водоотводный штрек 1, который совмещаетс  с откаточным штреком при добыче полезных ископаемых . A part of the water from the drain 4 penetrates through the gravel bed 16 into the inclined-rising wells 3 and through them falls into the drainage drift 1, which is combined with the haulage drift during the extraction of minerals.

Вода,наход п;а с  в массиве 2 полезных ископаемых и поступающа  вWater found n; a with in the array of 2 minerals and coming in

13980241398024

него из вышележащих слоев грунта 18, отводитс  посредством скважин 3it from the overlying soil layers 18, is discharged through wells 3

также в штрек 1.also on drift 1.

В результате действи  скважин 3 и 9 и дрены 4 грунтова  вода полностью отводитс  от массива 2 полезных ископаемых, при этом ее уровень устанавливаетс  по линии 19 на As a result of the operation of wells 3 and 9 and the drainage 4, the groundwater is completely diverted from array 2 of minerals, while its level is established along line 19 to

t / фиг.t / fg.

Такое выполнение дренажа обеспечивает исключение проходки части дренажных штреков, функции которых выполн ют дрена и скважины, что исключает необходимость ведени  подземных работ в сложных гидрологических услови х и тем самым ускор етс  выполнение работ и снижаетс  их стоимость .This embodiment of the drainage eliminates the penetration of part of the drainage drifts, the functions of which are performed by the drainage and the well, which eliminates the need to conduct underground works in difficult hydrological conditions and thereby speeds up the work and reduces their cost.

Claims (1)

ДРЕНАХ! МАССИВА ГРУНТА, преимущественно при добыче полезных ископаемых, включающий водоотводный штрек, соединенную с ним приемную камеру с зумпфом и отходящие от штрека наклонно-восстающие скважины, целью сокращения затрат и продолжительности осушения на наклонном водоупоре, он снабжен расположенной параллельно штреку вьпве по уклону уширенной дреной, объединяющей концы наклонно-восстающих скважин, и расположенными в верхней полусфере уширенной дрены дополнительными скважинами, соединеннымигс дреной по крайней мере по одной в каждом месте примыкания наклонно-восстающих скважин, причем каждая из последних имеет установленную внутри фильтровую трубу из легко разрушаемого материала, приемная камера размещена на конце уширенной дрены, <Dut.1DRAIN! MASSIVE OF SOIL, mainly in the extraction of minerals, including a drainage drift, a receiving chamber with a sump connected to it, and deviating wells drifting from the drift, in order to reduce costs and drainage time on an inclined aquicut, it is equipped with a parallel drain drift along the slope of the broadened drain. uniting the ends of the inclined-rising wells, and additional wells located in the upper hemisphere of the broadened drain, connected by at least one drain in each place rimykaniya deviated boreholes, wherein each of the latter is mounted inside the filter tube from readily breakable material receiving chamber located at the end broadened drains, <Dut.1 1 1139802 21 1139802 2
SU833611805A 1983-06-21 1983-06-21 Drainage for soil area SU1139802A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833611805A SU1139802A1 (en) 1983-06-21 1983-06-21 Drainage for soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833611805A SU1139802A1 (en) 1983-06-21 1983-06-21 Drainage for soil area

Publications (1)

Publication Number Publication Date
SU1139802A1 true SU1139802A1 (en) 1985-02-15

Family

ID=21070734

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833611805A SU1139802A1 (en) 1983-06-21 1983-06-21 Drainage for soil area

Country Status (1)

Country Link
SU (1) SU1139802A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР 1 702186, кл, Е 02 D 19/10, 1978. 2, Авторское свидетельство СССР № 724736, кл, Е 21 F 16/00, 1978. *

Similar Documents

Publication Publication Date Title
CN109611146B (en) Separation layer water drainage grouting method
CN111058847A (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN102926803B (en) Water drainage method for simultaneously exploiting water and coals under complicated hydrological condition
SU1139802A1 (en) Drainage for soil area
CN104763423B (en) Technology for mining powder ore by inverse well rock drilling
SU1744274A1 (en) Method of drying flooded workings
RU2114307C1 (en) Method for opencast mining of flooded mineral deposits
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
RU2223403C1 (en) Process of preparation of mass of permafrost and flooded rock mass for driving workings
RU2327036C2 (en) Excavation method of thick formations of mineral resources
Ngah et al. Groundwater problems in Surface mining in the united kingdom
RU2039269C1 (en) Method for reconstruction of flooded open pits
SU1070312A1 (en) Method of constructing a plugging pad
SU1191582A1 (en) Method of solid roof composition
SU1273560A1 (en) Method of preventing inflow of water into stoping faces
SU1677312A1 (en) Method for tunneling twin workings
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
SU1507976A1 (en) Method of freezing rock for erecting underground structure
US3600040A (en) Roof bolting and column building for solution mining
SU1343021A1 (en) Method of winning from production levels
RU2107165C1 (en) Method of bore-hole hydraulic recovery of minerals
SU1740666A1 (en) Ore deposit working method
SU1157237A1 (en) Method of mining thick ore deposits
SU900041A1 (en) Face-adjoining slime collector
RU2091582C1 (en) Method of mining of mineral beds at large depths