SU1110861A1 - Method for erecting soil-filled structures - Google Patents

Method for erecting soil-filled structures Download PDF

Info

Publication number
SU1110861A1
SU1110861A1 SU833589230A SU3589230A SU1110861A1 SU 1110861 A1 SU1110861 A1 SU 1110861A1 SU 833589230 A SU833589230 A SU 833589230A SU 3589230 A SU3589230 A SU 3589230A SU 1110861 A1 SU1110861 A1 SU 1110861A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
troughs
coarse
compaction
layers
Prior art date
Application number
SU833589230A
Other languages
Russian (ru)
Inventor
Яков Александрович Кроник
Размик Григорьевич Погосян
Original Assignee
Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева filed Critical Московский Ордена Трудового Красного Знамени Инженерно-Строительный Институт Им.В.В.Куйбышева
Priority to SU833589230A priority Critical patent/SU1110861A1/en
Application granted granted Critical
Publication of SU1110861A1 publication Critical patent/SU1110861A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

1. СПОСОБ ВОЗВЕДЕНИЯ ГРУНТОВЫХ СООРУЖЕНИЙ, включающий образование на карте корыт, заполнение их грунтом и уплотнение грунта, отличающийс  тем, что, с целью снижени  трудоемкости возведени  и расширени  диапазона примен емых дл  укладки в сооружени  грунтов, при образовании корыта его основание выполн ют жестким, а после заполнени  корыта грунтом его поверхность покрывают слоем крупнообломочного материала без мелкозема-заполнител  и производ т совместно уплотнение слоев крупнообломочного материала и грунта вплоть до полного втапливани  обломков крупнообломочного материала в грунт и образование грунтобетона . 2. Способ по п. 1, отличающийс  тем, что уплотнение крупнообломочного материала производ т динамической или вибрационной нагрузками, или их комбинаци ми . 3.Способ по пп. 1 и 2, отличающийс  тем, что при уплотнении крупнообломочного материала одновременно производ т дробление его обломков, при этом величину уплотн ющей нагрузки принимают больше среднестатической прочности обломков и меньше прочности грузобетона определ емых опытным путем до начала возведени  грунтового сооружени . 4.Способ по п. 1, отличающийс  тем, что заполнение корыт осуществл ют из мерзлых комковатых грунтов, а перед засыпкой крупнообломочного грунта их обрабатывают химическими реагентами. 5.Способ по п. 1, отличающийс  тем, что заполнение корыт грунтом осуществл ют (Л послойно, череду  слои некондиционного грунта и песка, а крупнообломочный материал втапливают до основани  корыт. , 6. Способ по п. 1, отличающийс  тем, что отсыпку крупнообломочного материала и уплотнение его до втапливани  в грунт .рсуществл ют послойно до образовани  сло  грунтобетона требуемой толщины. 7. Способ по п. 1, отличающийс  тем, что жесткое основание корыт образуют из сх уплотненного замороженного грунта или О) грунтобетона, или цементогрунта.1. METHOD OF CONSTRUCTION OF GROUND CONSTRUCTIONS, including the formation of troughs on the map, filling them with soil and soil compaction, characterized in and after filling the trough with the ground, its surface is covered with a layer of coarse clastic material without a fine aggregate and a joint compaction of the coarse clastic material and soil layers up to full volts plivani fragments of coarse material in the soil and the formation of soil-concrete. 2. A method according to claim 1, characterized in that the compaction of the coarse material is produced by dynamic or vibratory loads, or combinations thereof. 3. Method according to paragraphs. 1 and 2, characterized in that when compacting a coarse material, its fragments are crushed at the same time, while the value of the sealing load takes more than the average strength of the fragments and less than the weight of the concrete, determined experimentally before the construction of the soil structure begins. 4. A method according to claim 1, characterized in that the filling of the troughs is carried out from frozen, lumpy soils, and before filling the coarse soil, they are treated with chemical reagents. 5. A method according to claim 1, characterized in that the troughs are filled with soil (L in layers, a succession of layers of substandard soil and sand, and coarse material is heated to the base of the troughs. 6. Method according to claim 1, characterized in that the coarse material and its compaction prior to embedding in the soil. The layers are formed in layers to form a layer of soil concrete of the required thickness 7. The method according to claim 1, characterized in that the rigid base of the troughs is made of compacted frozen soil or O) soil concrete or cement.

Description

Изобретение относитс  к строительству н предназначено дл  возведени  грунтовых сооружений, например плотин, дамб, оснований дорог, аэродромов и т. п., преимущественного из некондиционного грунта.The invention relates to the construction of n intended for the construction of soil structures, such as dams, dams, road foundations, airfields, etc., mainly from substandard soil.

Известен способ возведени  грунтовых сооружений, включающий йодг9товку грунта , послойную его отсыпку на карту, разравнивание и уплотнение 1.There is a method of erection of soil structures, including soil iodine, layer-by-layer dumping on the map, leveling and compaction 1.

Недостатками данного способа  вл ютс  низка  производительность труда, невозможность укладки некондиционных грунтов и уплотнени  их до заданной плотности и т. п.The disadvantages of this method are low labor productivity, the impossibility of laying substandard soils and compacting them to a given density, etc.

Наиболее близким к изобретению  вл етс  способ возведени  грунтовых сооружений , включающий образование на карте корыт , заполнение их грунтом и уплотнение грунта 2.Closest to the invention is a method of erecting soil structures, including the formation on the map of troughs, filling them with soil and compaction of soil 2.

Недостатками этого способа  вл ютс  невозможность получени  высоких величин плотности грунта, низка  производительность труда в зимних услови х из-за необ,ходимости предохранени  прудков от промерзани , невозможность использовани  некондиционных грунтов, грунтовых смесей с крупнообломочными включени ми Р 60 мас.% и т.п.The disadvantages of this method are the impossibility of obtaining high values of soil density, low productivity in winter conditions due to the need to protect the ponds from freezing, the inability to use substandard soils, soil mixtures with coarse inclusions of P 60 wt.%, Etc .

Цель изобретени .- снижение трудоемкости возведени  и расширени  диапазона ггримен емых дл  укладки в сооружени  грунтов.The purpose of the invention. - reducing the complexity of the construction and expansion of the range of water used for laying in the construction of soils.

Цель достигаетс  тем, что согласно споссбу возведени  грунтовых сооружений, включающему образование на карте корыт, заполнение их грунтом и уплотнение грунта, при образовании корыта его основание выполн ют жестким, а после заполнени  корыта грунтом его поверхность покрывают слоем крупнообломочного материала без мелкозема-заполнител  и производ т совместно уплотнение слоев крупнообломочного материала и грунта вплоть до полного втапливани  обломков крупнообломочного материала в грунт и образовани  грунтобетона.The goal is achieved by the fact that according to the construction of soil structures, including the formation of troughs on the map, filling them with soil and compaction of the soil, when the trough is formed, its base is rigid, and after filling the trough with soil, the surface is covered with a layer of coarse material without fine earth-aggregate t jointly compacting layers of coarse clastic material and soil up to the complete embedding of fragments of coarse clastic material into the soil and the formation of soil concrete.

При этом уплотнение крупнообломочного материала производ т динамической или вибрационной нагрузками или их комбинаци ми .In this case, the compaction of the coarse material is produced by dynamic or vibration loads, or combinations thereof.

Причем при уплотнении крупнообломочного материала одновременно , производ т дробление его обломков, а величину уплотн ющей нагрузки принимают больше средйестатической прочности обломков и меньще прочности грунтобетона определ емых опытным путем до начала возведени  грунтового сооружени .Moreover, when compacting a coarse material at the same time, its fragments are crushed, and the magnitude of the compaction load takes more than the average static strength of the fragments and less than the strength of the soil concrete determined experimentally before the erection of the soil structure.

Кроме того, заполнение корыт осуществл ют из мерзлых комковатых грунтов, а перед засыпкой крупнообломочного грунта их обрабатывают химическими реагентами.In addition, the filling of the troughs is carried out from frozen, lumpy soils, and they are treated with chemical reagents before backfilling the coarse soil.

Заполнение корыт грунтом осуществл ют послойно, череду  слои некондиционного грунта и песка, а крупнообломочный материал втапливают до основани  корыт. Отсыпку крупнообломочного материала и уплотнение его до втапливани  в грунт осуществл ют послойно до образовани  сло  грунтобетона требуемой толщины.The filling of the troughs with soil is carried out in layers, a succession of layers of substandard soil and sand, and coarse clastic material is embedded in the bottom of the troughs. The dumping of coarse clastic material and its compaction before being embedded in the soil is carried out in layers to form a layer of soil concrete of the desired thickness.

Жесткое основание корыт образуют из 0 уплотненного замороженного грунта или грунтобетона, или цементогрунта.The rigid base of the troughs is formed from 0 compacted frozen soil or soil concrete or cement ground.

Пример. На картах образуют грунтовые корыта из грунтов или грунтовых смесей, причем их уплотн ют до получени  жест5 кого основани . При укладке первого сло  грунтовых смесей на бетонное основание, например потерну, образование жесткого основани  не требуетс , так, как бетон сам  вл етс  жестким основанием. После образовани  грунтовых корыт их заполн ют грун том толщиной, .например, 2 м из любого грунта, в том числе некондиционных, переувлажненных и т. п. Затем на поверхность заполненного грунта засыпают крупнообломочный материал без мелкозема-заполните5 л  сло ми, например 10-200 см. .При толщине крупнообломочного материала, например , 20 см его уплотн ют и одновременно втапливают в нижележащий слой грунта. Затем на втопленной слой крупнообломочного материала вновь засыпают второйExample. On the maps, soil troughs of soils or soil mixtures are formed, and they are compacted to form a stiff base. When laying the first layer of soil mixes on a concrete base, for example, is lost, the formation of a rigid base is not required, as the concrete itself is a rigid base. After the formation of soil troughs, they are filled with a soil thickness of, for example, 2 m from any soil, including substandard, overmoistened, etc. Then, the detrital material without fine earth is filled onto the surface of the filled soil — fill 5 l with layers, for example, 10- 200 cm. With a thickness of coarse material, for example, 20 cm, it is compacted and simultaneously embedded in the underlying soil layer. Then, the second layer of the

слой, например, толщиной 15 см и вновь уплотн ют его до втапливани  в нижележащий слой. Эти процессы засыпки крупнообломочного материала и его уплотнени  производ т до получени  жесткого основани  последующего корыта, котороеlayer, for example, 15 cm thick and re-seal it before being embedded in the underlying layer. These processes of backfilling of coarse clastic material and its compaction are carried out before obtaining a rigid base of a subsequent trough, which

нужно заполнить грунтом.need to fill with primer.

На поверхность заполн ющего корыто грунта может быть сразу засыпан крупнообломочный материал толщиной, например,A coarse material with a thickness of, for example, can be immediately buried on the surface of the soil filling the trough.

100 см, уплотнение которого производ т до полного его втапливани  в нижележащий грунт и образовани  основани , из грунтобетона .100 cm, compaction of which is carried out before it is fully embedded in the underlying soil and the formation of a base, from the soil concrete.

Уплотнение грунта и крупнообломочного материала производ т динамическими или циклическими нагрузками или их комбинаци ми . Например, уплотнение крупнообломочного материала производ т т желыми плитами весом 7,0-200 т. Выбор веса т желой трамбовки зависит от величин уплотн ющих мащин и механизмов, толщины сло  грунтовых смесей, прочности обломков крупнообломочного материала и др.The compaction of the soil and coarse material is produced by dynamic or cyclic loads or their combinations. For example, compaction of coarse material is produced by heavy plates weighing 7.0–200 tons. The choice of the weight of a heavy tamper depends on the size of the sealing machines and mechanisms, the thickness of the layer of soil mixtures, the strength of the coarse material fragments, etc.

При уплотнении и втапливании крупнообломочного материала можно производить и его дробление.When compacting and melting coarse material, it can also be crushed.

При отсутствии кондиционных материалов в корыто послойно засыпают, череду , некондиционные грунты и песок, при этомIn the absence of conforming materials, in a trough, layers, substandard soils and sand fall asleep in layers,

3 111086143 11108614

крупнообломочный материал уплотн ют донапример сол ми хлоридов (NaCl, CaCljcoarse clastic material is compacted by the example of salts of chlorides (NaCl, CaCl

их втапливани  в основание корыта.и т.п.). ,their insertion into the base of the trough., etc.). ,

В корыто можно послойно засыпать так-: Применение изобретени  позвол ет сниже мерзлые комковатее грунты, причемзить стоимость укладки грунта в «делеIn the trough, one can lay aside layers in the following way: The application of the invention allows reducing frozen lumpy soils, and the cost of laying the soil in

перед уплотнением их производ т химиче-5 с 8-10 руб/м летом до 7 руб/м, а приbefore compaction, they are made chemically-5 from 8-10 rubles / m in the summer to 7 rubles / m, and

скую обработку химическими реагентами;yк Iaдкe зимой с 15-16 до 12 руб/м.high-speed processing with chemical reagents; yak Ika in winter from 15-16 to 12 rubles / m.

Claims (7)

1. СПОСОБ ВОЗВЕДЕНИЯ ГРУНТОВЫХ СООРУЖЕНИИ, включающий образование на карте корыт, заполнение их грунтом и уплотнение грунта, отличающийся тем, что, с целью снижения трудоемкости возведения и расширения диапазона применяемых для укладки в сооружения грунтов, при образовании корыта его основание выполняют жестким, а после заполнения корыта грунтом его поверхность покрывают слоем крупнообломочного материала без мелкозема-заполнителя и производят совместно уплотнение слоев крупнообломочного материала и грунта вплоть до полного втапливания обломков крупнообломочного материала в грунт и образование грунтобетона.1. METHOD OF ESTABLISHING SOIL CONSTRUCTIONS, including the formation of troughs on the map, filling them with soil and compaction of the soil, characterized in that, in order to reduce the complexity of erection and expand the range of soils used for laying in structures, when the trough is formed, its base is made rigid, and after filling the trough with soil, its surface is covered with a layer of coarse material without fine earth filler and jointly compaction of layers of coarse material and soil is carried out until full replenishment Ia fragments of coarse material in the soil and the formation of soil-concrete. 2. Способ по π. 1, отличающийся тем, что уплотнение крупнообломочного мате риала производят динамической или вибрационной нагрузками, или их комбинациями.2. The method according to π. 1, characterized in that the compaction of coarse material is produced by dynamic or vibration loads, or combinations thereof. 3. Способ по пп. 1 и 2, ,отличающийся тем, что при уплотнении крупнообломочного материала одновременно производят дробление его обломков, при этом величину уплотняющей нагрузки принимают больше среднестатической прочности обломков и меньше прочности грузобетона определяемых опытным путем до начала возведения грунтового сооружения.3. The method according to PP. 1 and 2, characterized in that when compaction of the large-clastic material, its fragments are crushed at the same time, while the magnitude of the compaction load is greater than the average static strength of the fragments and less than the strength of the freight concrete determined experimentally before the erection of the soil structure. 4. Способ по π. 1, отличающийся тем, что заполнение корыт осуществляют из мерзлых комковатых грунтов, а перед засыпкой крупнообломочного грунта их обрабатывают химическими реагентами. Λ 4. The method according to π. 1, characterized in that the filling of the troughs is carried out from frozen lumpy soils, and before backfilling of coarse soil, they are treated with chemical reagents. Λ 5. Способ по π. 1, отличающийся тем, что ф заполнение корыт грунтом осуществляют послойно, чередуя слои некондиционного грунта и песка, а крупнообломочный материал втапливают до основания корыт.5. The method according to π. 1, characterized in that the filling of the troughs with soil is carried out in layers, alternating layers of substandard soil and sand, and coarse material is heated to the base of the troughs. 6. Способ по π. 1, отличающийся тем, что отсыпку крупнообломочного материала и уплотнение его до втапливания в грунт осуществляют послойно до образования слоя грунтобетона требуемой толщины.6. The method according to π. 1, characterized in that the filling of coarse-grained material and compacting it before being embedded in the soil is carried out in layers until a layer of soil concrete of the required thickness is formed. 7. Способ по π. 1, отличающийся тем, что жесткое основание корыт образуют из уплотненного замороженного грунта или грунтобетона, или цементогрунта.7. The method according to π. 1, characterized in that the rigid base of the troughs is formed from compacted frozen soil or soil concrete, or cement soil. SU .,.,1110861SU.,., 1110861
SU833589230A 1983-05-11 1983-05-11 Method for erecting soil-filled structures SU1110861A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833589230A SU1110861A1 (en) 1983-05-11 1983-05-11 Method for erecting soil-filled structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833589230A SU1110861A1 (en) 1983-05-11 1983-05-11 Method for erecting soil-filled structures

Publications (1)

Publication Number Publication Date
SU1110861A1 true SU1110861A1 (en) 1984-08-30

Family

ID=21062679

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833589230A SU1110861A1 (en) 1983-05-11 1983-05-11 Method for erecting soil-filled structures

Country Status (1)

Country Link
SU (1) SU1110861A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Би нов Г. Ф. Плотины на вечной мерзлоте. М., «Энерги , 1975, с. 109. 2. Там же, с. 115-120 (прототип). *

Similar Documents

Publication Publication Date Title
Archibong et al. A review of the principles and methods of soil stabilization
CN102140771B (en) Construction method for processing saline soil roadbed by separation layer
US3226935A (en) Retaining wall and method of constructing same
CN107165013A (en) Geotechnical grid reinforcement foam concrete light road foundation fills structure and its method
CN209722598U (en) A kind of light-weight foamed soil structure of railway
JP3452330B2 (en) Solidified material mixed with crushed stone powder and construction method using solidified material mixed with crushed stone powder
CN108517838A (en) A kind of throwing reason stone concrete facing structure and its construction method
CN107288120A (en) A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash
Black et al. Historical perspectives in frost heave research: The early works of S. Taber and G. Beskow
CA2334380C (en) A method of stabilising the ground in road construction work
US3822955A (en) Ground surfaces
CN212533589U (en) Anti-crack roadbed and pavement structure
CN108623253A (en) A kind of full constituent steel slag concrete stake and its processing soft base construction technology
SU1110861A1 (en) Method for erecting soil-filled structures
US2183253A (en) Road construction
KR100312457B1 (en) Solidified composition to strengthen weak stratum and constructing method using the same
CN106836034A (en) A kind of high roadbed slab culvert flexibility off-load system and construction method
US2809118A (en) Process for compacting and the plastic stiffening of natural and artificial soils
CN108547306A (en) A kind of building waste block stone does the construction method of bank protection
CN114606819A (en) High-fill structure adopting lime soil to half wrap expansive soil and construction method thereof
JPH0452327A (en) Stabilized soil and construction method using this soil
CN106193059A (en) A kind of fill method of shoal sludge solidification separation levee
SU1673677A1 (en) Method for building antifiltration screen of dam
Giffen Design and construction of a strengthened embankment for an intermodal transfer facility
RU2779153C1 (en) Method for protecting inclined soil surface from erosion