SU1089263A1 - Method of dump formation - Google Patents
Method of dump formation Download PDFInfo
- Publication number
- SU1089263A1 SU1089263A1 SU823530742A SU3530742A SU1089263A1 SU 1089263 A1 SU1089263 A1 SU 1089263A1 SU 823530742 A SU823530742 A SU 823530742A SU 3530742 A SU3530742 A SU 3530742A SU 1089263 A1 SU1089263 A1 SU 1089263A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- overburden
- dumping
- ledge
- substances
- bonding
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
1. СПОСОБ ОТВАЛООБРАЗОВАНИЯ , включающий отработку вскрышного уступа заходками, последующую отсып-; ку вскрышных пород в выработанное пространство с добавлением скрепл ющих веществ, отличающийс тем что, с целью повышени эффективности отвалообразовани за расширени области применени технологии совместной отсьшки вскрьшных пород со скрепл ющими веществами путем использовани экскаваторов циклического действи при сохранении качества в жущих веществ, перед отработкой очередной заходки вскрышного уступа на верхней площадке последнего по всей ширине заходки в шахматном пор дке размещают скренл юnOie вещества, затем защищают их S от воздействи влаги водоупорным материалом , после чего отрабатывают (Л вскрьппной уступ совместно со скрепл ющими вещес1вами.1. METHOD OF DUMPING, including the mining of the overburden ledge by bores, the subsequent dumping; overburden into the developed space with the addition of bonding substances, characterized in that, in order to increase the efficiency of spalling for expanding the field of application of joint ventricular mining with bonding agents by using cyclic excavators while maintaining the quality of the burning substances, before the overburden ledge on the top platform of the latter, across the entire width of the stopping, is placed in a checkerboard order the skrenl of the uniie substance, then protect They are protected from moisture by waterproof materials, and then they are worked out (L of the scarp ledge together with fasteners.
Description
2. Способ ПОП.1, отличающийс тем, что скрепл ющие вещества размещают в при мках на слое водоупорного материала.2. Method POP.1, characterized in that the bonding agents are placed in the marks on the layer of waterproof material.
Изобретение относитс к открытой разработке месторождений полезных ископаемых с м гкими покрывающими породами и внутренним отвапообразова нием. Известно, что зффективность откры тых горных работ повьшаетс с увеличением устойчивости отвала, котора , в свою очередь, зависит от величины сцеплени между частицами пород. Известен способ отвалообразовани , включающий повышение устойчивос ти отвала путем выполаживани резуль тирующего угла откоса lj . Недостатком известного способа вл етс необходимость переэкскавации части пород отвала при выполаживании результирующего угла откоса. Наиболее близким по технической сущности и достигаемому результату к предлагаемому вл етс способ ofвалообразовани , включающий отработк вскрышного уступа заходками, последующую отсьшку вскрьшных пород в выработанное пространство с добавлением скрепл ющих веществ 2, Недостатком указанного способа в л етс ограниченна область применени существующей технологии, котора предусматривает необходимость исполь зовани специальных устройств, смонтированных на отвалообразовател х. Цель изобретени - повышение эффективности отвалообразовани за сче расширени области применени технологии совместной отсыпки вскрышных пород со скрепл ющими веществами путем использовани экскаваторов цикли ческого действи при сохранении каче ства в жущих веществ. Поставленна цель д остигаетс тем что согласно способу отвалообразовани , включающему отработку вскрышного уступа заходками, последуюп1ую отсыпку вскрьш1ных пород в выработанное пространство с добавлением скрепл ющих веществ, перед отработкой очередной заходки вскрьшного уступа на верхней площадке последнего по всей ширине заходки в шахматном пор дке размещают скрепл ющие вещества, затем защищают их от воздействи влаги водоупорным материалом, после чего отрабатывают вскрышной уступ совместно со скрепл юш 1ми веществами. Кроме того, скрепл ющие вещества размещают в при мках на слое водоупорного материала. На фиг. 1 показана схема разработки и последующего отвалообразовани породJ на фиг. 2 - сечение по вскрьш ной заходке. Вскрьшные породы разрабатывают, например, драглайном заходками 2 на уступе 3, а затем их отсыпают в отвал 4. На уступе в пределах отрабатываемой заходки образ.уют при мки 5 в шахматном пор дке. При этом при мки располагают в пределах вскрьш1ной заходки таким образом, что их проекции на вертикальную плоскость перекрьгеают друг друга по ширине заходки. Суммарную емкость при мков рассчитывают по необходимому дл качественного укреплени отвала соотношению объемов вскрьш1ньгх пород и в жущих веществ. Разрабатыва забой 6, драглайн перемешивают породы заходки и в жущее вещество, размещенное в при мках. Способ осуществл ют следующим образом . Экскаватор забрасывает ковш.на верхнюю площадку уступа и снимает стружку вдоль забо сверху вниз. При том в ковш попадают и укрепл ющие ещества, поскольку они размещены о всей ширине заходки в при мках. асть пород в забое и в жущее вещесто в при мках в процессе их экскаваии обрушаютс и перемещаютс на абочую площадку. В процессе совместого обрушени и перемещени они пеемешиваютс , Вторичное их перемешиание происходит при совместной разрузке в отвал. Так, при отсыпкеThe invention relates to the open-pit mining of mineral deposits with soft overburden and internal formation. It is known that the efficiency of open pit mining increases with the stability of the blade, which, in turn, depends on the amount of adhesion between the rock particles. The known method of dumping includes increasing the stability of the blade by flattening the resulting slope angle lj. The disadvantage of this method is the need to re-excavate part of the dump rocks while flattening the resulting slope angle. The closest in technical essence and the achieved result to the proposed is a method of forming, including working out of the overburden ledge by bores, the subsequent loss of vyrishnyh rocks into the developed space with the addition of fastening substances 2. The disadvantage of this method is the limited scope of the existing technology, which requires use of special devices mounted on spreaders. The purpose of the invention is to increase the efficiency of dumping by expanding the field of application of the technology of joint dumping of overburden rocks with bonding substances by using cyclical excavators while maintaining the quality of the burning substances. The goal is achieved by the fact that according to the dumping method, which includes working out the overburden ledge by step, the subsequent dumping of spring rock into the developed space with the addition of fastening substances, before working out the next stop of the spring ledge on the last platform, along the entire width of the step, staple substances, then protect them from moisture by impermeable material, after which they work overburden ledge together with fastened with 1 substance. In addition, bonding agents are placed in prims on the layer of impermeable material. FIG. 1 shows a design of the development and subsequent dumping of rocks in FIG. 2 - cross section by open entry. Discovered rocks are developed, for example, by dragline with 2 stoppers on ledge 3, and then they are dumped into dump 4. On the ledge, within the worked-in stow, they form 5 cm in a checkerboard pattern. At the same time, the landings are located within the limits of the open approach so that their projections on the vertical plane overlap each other across the width of the approach. The total capacity of the banks is calculated from the ratio of the volumes of the wiped out rocks and in the burning matter necessary for the quality strengthening of the heap. When developing face 6, the dragline mixes the rocks of the entry and the moving substance placed in the ground. The method is carried out as follows. An excavator throws a bucket on the top of the bench and removes chips along the bottom from the top down. At the same time, reinforcing substances also fall into the ladle, since they are placed about the entire width of the approach in the case of the beams. Part of the rocks in the bottomhole and in the ground in the ground during the process of their excavation collapse and move to the working platform. In the process of joint collapse and relocation, they are mixed. Their secondary mixing occurs during co-discharge into a dump. So, when dumping
отвала -и-гребень отсыпаемые породы от точки разгрузки скатываютс и перемещаютс к основанию отвала. Это обеспечивает их дополнительное перемешивание. Дл защиты в жущего вещества, например извести или цемента , от влаги пород отвала и атмосферных осадков внутренние стенки и дно при мков перед их заполнением в жущим веществом покрывают изол -ционным материалом,, например водоупорной глиной. Изолируют также в жущее вещество в при мках и от атмосфеVBlade-and-crest Poured rocks from the point of unloading roll down and move to the bottom of the blade. This provides additional mixing. In order to protect the substance, for example lime or cement, from the dump rock and precipitation, the inner walls and bottom of the soil are covered with insulating material, such as waterproof clay, before filling them with the substance. The insulative substance is also insulated in the pulses and from the atmosphere.
ры, например, присыпа их слоем глины, покрыва полиэтиленовой пленкой и т.п.For example, they are powdered with a layer of clay, covered with plastic wrap, etc.
Использование предлагаемого способа позволит расширить облас-ть применени совместной отсьшкы вскрьштных пород со скрепл ющими веществами за счет использовани экскаваторов цикличного действи при сохранении качества в жущих веществ, что в целом ведет к повышению эффективности отвалообразовани .The use of the proposed method will allow to expand the scope of joint use of open-cut rocks with bonding substances by using cyclical excavators while maintaining the quality of the burning substances, which generally leads to an increase in the efficiency of dumping.
kk
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823530742A SU1089263A1 (en) | 1982-12-23 | 1982-12-23 | Method of dump formation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823530742A SU1089263A1 (en) | 1982-12-23 | 1982-12-23 | Method of dump formation |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1089263A1 true SU1089263A1 (en) | 1984-04-30 |
Family
ID=21042185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823530742A SU1089263A1 (en) | 1982-12-23 | 1982-12-23 | Method of dump formation |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1089263A1 (en) |
-
1982
- 1982-12-23 SU SU823530742A patent/SU1089263A1/en active
Non-Patent Citations (1)
Title |
---|
1. Новожилов М.Г. и др. Теори и практика открытой разработки горизонтальных месторождений. М., Недра, 1978, с. 142-143, рис.3-18. 2. Авторское свидетельство СССР № 941582, кл. Е 21 С 41/00, 1980 (прототип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5413047A (en) | Overburden removal method with blast casting and excavating apparatus | |
SU1089263A1 (en) | Method of dump formation | |
RU2039274C1 (en) | Method for recultivation of open pits | |
Straskraba et al. | The differences in underground mines dewatering with the application of caving or backfilling mining methods | |
RU2088760C1 (en) | Method for recultivation of slopes in opencast mining of mineral deposits | |
SU1108195A1 (en) | Method of group leaching-out of minerals | |
Schrader et al. | Presa Rompepicos–a 109 meters high RCC dam at Corral Des Palmas with final design during construction | |
RU2810374C1 (en) | Method of strengthening ledge berm | |
SU898063A1 (en) | Method of enhancing dump capacities | |
RU2201949C2 (en) | Drilling reject burial method | |
SU1432247A1 (en) | Method of protecting sulfide ore pile against self-inflammation | |
RU2009319C1 (en) | Method for formation and reclamation of dumps | |
SU1411471A1 (en) | Method of mining placer deposits | |
SU1656124A1 (en) | Method for mining thick steeply deeping coal seam with stowing | |
SU1756565A1 (en) | Method for dumping in mineral opencast mining | |
SU711288A1 (en) | Method of dump formation while mining mineral deposits | |
SU1638305A1 (en) | Method of driving steep inclines | |
SU1176076A1 (en) | Method of restructuring an open mine | |
SU1756566A1 (en) | Method for mineral opencast mining | |
SU1416694A1 (en) | Method of open mining of mineral deposits | |
SU693010A1 (en) | Method of dump formation while working mineral deposits | |
SU899950A1 (en) | Method of forming internal dumps | |
SU1224403A1 (en) | Method of open-cast mining of mineral deposits | |
SU1682573A1 (en) | Rock heap spilling method | |
SU1093750A1 (en) | Dam of locally available materials |