SU1058836A1 - Method of underground storage of salt and slime waste - Google Patents

Method of underground storage of salt and slime waste Download PDF

Info

Publication number
SU1058836A1
SU1058836A1 SU823408098A SU3408098A SU1058836A1 SU 1058836 A1 SU1058836 A1 SU 1058836A1 SU 823408098 A SU823408098 A SU 823408098A SU 3408098 A SU3408098 A SU 3408098A SU 1058836 A1 SU1058836 A1 SU 1058836A1
Authority
SU
USSR - Soviet Union
Prior art keywords
chambers
drainage
drift
chamber
sludge
Prior art date
Application number
SU823408098A
Other languages
Russian (ru)
Inventor
Михаил Михайлович Зайцев
Олег Владимирович Ковалев
Станислав Степанович Наконечный
Михаил Павлович Нестеров
Лев Михайлович Папулов
Юрий Петрович Паринский
Борис Иванович Семеняк
Николай Антонович Синькевич
Игорь Дмитриевич Соколов
Вячеслав Николаевич Стружков
Original Assignee
Всесоюзный научно-исследовательский и проектный институт галургии
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектный институт галургии filed Critical Всесоюзный научно-исследовательский и проектный институт галургии
Priority to SU823408098A priority Critical patent/SU1058836A1/en
Application granted granted Critical
Publication of SU1058836A1 publication Critical patent/SU1058836A1/en

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

1. СПОСОБ ПОДЗЕМНОГО СКЛАДИРОВАНИЯ СОЛЕШЛАМОВЫХ ОТХОДОВ, включающий проходку камер с оставлением между ними целиков, проходку вентил ционного и транспортного штреков, гидравлическую доставку шламов от обогатительных фабрик, отбор рассолов и подачу их на обогатительные фабрики, отличающийс  тем, что, с целью повышени  безопасности работ по подземному складированию независимо от примен емых систем разработок, камеры проход т во вмещающих рабочие горизонты устойчивых рассоловодонепроницаемых породах, целики между камерами и между камерами и рабочими горизонтами создают с несущей способностью выше критической в 3-4 раза, вентил ционный и транспортный штреки соедин ют с камерами уклонами, при этом параллельно камерам на уровне их кровли проходит щламоподающий штрек, соедин ющийс  с камерами сбойками, которые располагают равномерно по длине камер. 2. Способ по п. 1, отличающийс  тем, что, с целью интенсификации рассолоотделени  солешламовых отходов, вдоль камер проход т наклонные дренажные щтреки, соедин ющиес  с камерами сбойками, которые располагают на разной высоте, со стороны нижней части дренажного штрека за камерой проходит гезенкообразный рас (Л солосборник, соедин ющийс  с дренажным штреком и камерой на уровне ее почвы, сбойки и дно камеры заполн ют дренажным материалом, при этом мощность дренажного сло  на дне камеры увеличивают в направлении от транспортного штрека к рас-, солосборнику с перекрыванием нижних сбоек камеры с дренажным штреком и рассосд лосборником. 00 00 03 о:1. METHOD OF UNDERGROUND STORAGE OF SOLAR SLAM WASTES, including sinking of chambers with pillars remaining between them, sinking of ventilation and transport drifts, hydraulic delivery of sludge from processing plants, selection of brines and supplying them to processing plants, characterized in that, in order to improve the safety of works in underground storage, regardless of the applied development systems, the chambers pass through stable, salt-water-resistant rocks in the enclosing working horizons, pillars between the chambers and between The cameras and working horizons are created with a bearing capacity of 3-4 times higher than the critical one, the ventilation and transport drifts are connected to the chambers by slopes, while parallel to the chambers at the level of their roof passes a slalom feed tunnel connected to the chambers the length of the chambers. 2. A method according to claim 1, characterized in that, in order to intensify the salt-slurry wastes desalination, inclined drainage pads pass along the chambers, which are connected to the chambers with tides, which are located at different heights, from the bottom of the drainage drift behind the chamber passes a gesen-like races (L solosbornik, connecting with the drainage drift and the chamber at the level of its soil, the connections and the bottom of the chamber are filled with drainage material, while the power of the drainage layer at the bottom of the chamber increases in the direction from the transport drift . Distribution, solosborniku overlapping lower sboek camera with drainage and roadway rassosd losbornikom 00 00 03 of:

Description

Изобретение относитс  к горной промышленности , включающей подземную добычу полезных ископаемых, например калийных, и наземное обогащение руд, и может быть использовано при эксплуатации месторождений в случае наличи  шламовых отходов обогащени , а также недостатке твердых отходов дл  закладки выработанных пространств. Известен способ складировани  шламовых отходов производства на поверхности земли, дл  чего стро т специальные щламохранилища 1. Недостатком способа  вл етс  отчуждение земельных площадей и загр знение окружающей среды. При этом размещение щламов в таких хранилищах влечет за собой большие капитальные и эксплуатационнью затраты. Кроме того, при эксплуатации поверхностных шламохранилищ, как например , в калийной промышленности, атмосферные осадки разбавл ют на 70-80% жидкую фазу поступающей щламовой пульпы . Это требует соответствующего увели;чени  емкости щламохранилищ. С другой стороны, при этом происходит разжижение оборотных рассолов, подаваемых со шламохранилища на обогатительную фабрику, в св зи с чем увеличиваютс  потери полезйого компонента, необходимого дл  донасыщени  рассолов. Сезонное колебание температурь окружающей среды от +30 до - 40° С ведет к колебанию температурь оборотных рассолов, что дестабилизирует 30 работу обогатительной фабрики. Наиболее близким к предлагаемому по технической сущности и достигаемому результату  вл етс  способ подземного складировани  шламовых отходов, включающий гидравлическую доставку щламов от обогатительных фабрик в подземные выработки 2. При этом дл  отбора рассолов от солещламовых отходов примен ютс  солевые перемычки, сооруженные в усть х очист-дд ных камер, после чего рассолы возвращаютс  на обогатительную фабрику. В этом случае об зательна закладка солевыми отходами 2-3 соседних отработанных камер. По второй технологической схеме солешламовые отходы размещаютс  в специально проходимых в подстилающей каменной соли наклонных тупиковых камерах. Эти камерЬ проход тс  с выемочных штреков пласта Красный П под уклоном 8-12° в сторону вентил ционного штрека соосно с очистНыми камерами пласта Красный П. Рассол от шламов отбираетс  по мере осветлени  шламовой пульпы (врем  осветлени  до 40 дней). В этом случаевсе очИстНые прилегающие камерь подлежат закладке солеотходами . Однако применение известного способа складировани  Н.а калийных рудниках ограничено и возможно лишь при камерной сиетеме разработки с «жесткими мёждукамерными целиками. Но даже в этих услови х их применение в полномасштабном объеме с целью ликвидации шламохранилиш; на поверхности технически затруднено, так как требует посто нной эксплуатации до 4/5 всех отрабатываемых камер дл  размещени  в них шламовых отходов. В св зи с наличием изменени  направлений падени  рабочих пластов при этих способах размещени  щламов непосредственно у рабочих горизонтов практически невозможно обеспечить посто нное снижение положени  уровн  пульпопровода по высоте, поэтому образуютс  «мешки, что при частых технологических и аварийных остановках подачи пульпы представл ет собой серьезную техническую проблему по борьбе с зашламлением става труб. Недостатками известного способа  вл ютс  также снижение устойчивости межкамерных целиков и необходимость закладки камер невозможность обеспечени  большего обезвоживани  шламов, чем . Цель изобретени  - повышение безопасности работ по подземному складированию независимо от примен емых систем разработок и интенсификаци  рассолоотделени  солешламовых отходов. Поставленна  цель достигаетс  тем, что согласно способу подземного складировани  солешламовых отходов, включающему проходку специальных камер с оставлением между йими целиков, проходку вентил ционного и транспортного штреков, гидравлическую доставку щламов от обогатительных фабрик в подземные выработки, отбор рассолов и подачу их на обогатительные фабрики , специальные камерь проход т во вмещающих рабочие горизонты устойчивых рассоловодонепррницаемых породах, це-. лики между камерами и между камерами и рабочими горизонтами создают с несущей способностью выше критической в 3-4 раза, вентил ционный и транспортный щтреКИ соедин ют с камерами уклонами, при этом параллельно камерам на уровне их кровли проходит шламоподающий штрек, соседи н ющийс  с камерами сбойками, KOTopbie располагают равномерно по длине камер. Кроме того, вдоль камер проход т наклонные дренажные штреки, соедин ющиес  с камерами сбойками, которые располагают на развей высоте, со стороны нижней части дренажного штрека за камерой проходит гезенкообразный рассолосборник, соедин ющийс  с дренажным штреком и камерой на уровне ее почвы, сбойки и дно камерь заполн ют дренажным материалом, при этом мощность дренажного сло  на дне камерь увеличивают в направлении от транспортного штрека к рассолосборйику с перекрьшанием нижних сбоек камеры с дренажным штреком и рассолосборником. На фиг. 1 и 2 представлены шламова  камера с наклонным диагональным дренажным штреком и сетью необходимых выработок , план и разрез соответственно. На фиг. 1 и 2 обозначено: транспортный штрек 1; вентил ционный штрек 2; шламова  камера 3; дренажный слой 4 переменной мошности на почве камеры; шламо-и рассолотрубный штрек 5; сбойки 6 штрека 5 с камерой 3, служащие дл  подачи шламовой пульпы в камеру; дренажный диагональный (наклонный) штрек 7; сбойки 8, соедин юшие штрек 7 с камерой 3 на различной высоте; дренажный материал .9, заполн ющий Ж 7 и сбойки 8; рассолосборник 10 гезенк Jpaзный. Склад 1ррвание шламов в подземные специальные камерь производитс  следуюшим образом. Разжиженные на фабрике насышенными рассолами шламы в соотношении Т:Ж 1:3 - 1:5 подают по шламовому трубопроводу к стволу или специальной скважине , а далее самотеком или с помощью насосов через выработки, подвод щие к щламовому горизонту, по штреку I и далее через шламовый штрек 5 и сбойки 6 в камеру 3. При отборе осветленных рассолов с камеры , не оборудованной дренажными устройствами , залита  в камеру по возможности полнее шламова  пульпа оставл етс  сначала дл  отсто  (до 40 дней) и по мере осветлени  производитс  откачка расСОЛОВ насосами, устанавливаемыми в одной из нескольких сбойках 6, и по рассолопроводу через штрек 5 и штрек 1 выдаетс  к стволу и далее перекачиваетс  на поверхность и подаетс  на фабрику. При этом в св зи с необходимостью определенного времени дл  отсто  шламов в одновременной работе должно быть несколько (минимально 2) камер - в одни подают пульпу, а из других откачивают осветленные рассолы. При наличии дренажных устройств (4, 7, 8 и 9) процесс подачи пульпы и рассолоотвода осуществл ют одновременно. В этом случае в работе достаточно иметь одну шламовую камеру. Расчеты показывают, что при емкости шламовой камеры свыше 200 тыс. куб. м. дл  подземного размещени  шламо вых отходов при Т:Ж 1:1 достаточно в работе иметь одну камеру, а на весь годовой объем шламовых отходов четыре камеры, в то врем  как дл  размещени  восьми шламохранилиш потребовалс  бы объем в 5 раз больше и необходимо зан ть площадь поверхности от 3 до 7 га. При полном размещении щламовых отходов по способу как в прототипе с учетом закладки солеотходами соседних камер на годовой объем шламов требуетс  свыше 300 отработанных камер по пласту Кр-У, т.е. в 1,5 раза больше, чем требуетс  отрабатывать их дл  обеспечени  производительности рудника по сильвиниту , т.е. полное размещение шламовых отходов в руднике по способу-прототипу невозможно. Третью часть шламовых отходов в этом случае пришлось бы складировать в шламохранклищах. Основные достоинства предлагаемого способа подземного рамещени  шламовых (солешламовых) отходов: воможность отказатьс  от размещени  шламов на поверхности , что позвол ет сохранить земельные угодь  и защитить окружающую среду от вредного вли ни  щламовых отходов; универсальность применени  при любых системах разработки, так как исключаютс  геомеханическое вли ние и гидросв зь шламового с рабочими горизонтами; уменьшение числа камер дл  размешени  шламов, что повышает производительность труда; возможность .возвратных рассолов посто нной температуры и нормального насыщени , что улучшает работу фабрики и уменьшает потери полезного компонента.The invention relates to the mining industry, including underground mining of minerals, such as potash, and surface enrichment of ores, and can be used in the exploitation of deposits in the case of sludge enrichment waste, as well as the lack of solid waste for laying waste areas. There is a known method of storing sludge production waste on the surface of the earth, for which special storage facilities are built. The disadvantage of this method is the alienation of land areas and pollution of the environment. At the same time, the placement of scrap in such storage facilities entails large capital and operational costs. In addition, during the operation of surface sludge storage facilities, such as in the potash industry, precipitation is diluted to 70-80% of the liquid phase of the incoming sludge slurry. This requires an appropriate increase in the capacity of the slag storage facilities. On the other hand, this causes the dilution of circulating brines supplied from the sludge storage to the processing plant, thereby increasing the loss of the useful component required for the saturation of the brines. Seasonal fluctuations in ambient temperature from +30 to –40 ° С lead to fluctuations in the temperature of circulating brines, which destabilizes the operation of the concentration plant. The closest to the proposed technical essence and the achieved result is a method of underground storage of sludge wastes, including hydraulic delivery of sludge from concentrating factories to underground mines 2. At the same time, salt lintels were used at the mouth of the sewage sludge. chambers, after which the brines are returned to the processing plant. In this case, it is obligatory to use saline waste from 2-3 adjacent waste chambers. According to the second technological scheme, salt slime wastes are placed in inclined dead-end chambers that are specially passed in the underlying rock salt. These chambers pass from the excavation drifts of the Red P under a gradient of 8–12 ° towards the ventilation drift coaxially with the clean chambers of the Red P. brine. The brine is removed from the slurry as the slurry clarifies (the clarification time is up to 40 days). In this case, the adjacent adjoining chambers are to be laid with salt outlets. However, the use of the known method of storing petroleum mines in potash mines is limited and is possible only in the case of a chamber sietem of development with "rigid inter-chamber pillars. But even in these conditions, their use in full scale with the aim of eliminating slime-storage; on the surface it is technically difficult, since it requires constant operation of up to 4/5 of all the waste chambers to accommodate sludge waste. Due to the change in the direction of fall of the working seams with these methods of placing the cuttings directly at the working horizons, it is almost impossible to ensure a permanent decrease in the height of the slurry pipeline level, therefore, "bags" are formed that with frequent technological and emergency stops of the pulp supply is a serious technical Problem to combat the slurry of pipe stav. The disadvantages of this method are also the reduction in the stability of the inner-chamber pillars and the need for laying out the cameras, the impossibility of providing more dewatering sludge than. The purpose of the invention is to improve the safety of underground storage operations, regardless of the development systems used and the intensification of the salt slime wastes. This goal is achieved by the fact that according to the method of underground storage of sludge wastes, including the sinking of special chambers with the remaining pillars between them, the sinking of ventilation and transport drifts, the hydraulic delivery of sludge from the processing plants to the underground workings, the selection of brines and their supply to the processing plants, special the chamber passes through the stable brine-water-unconstrained rocks enclosing the working horizons, tse-. The chambers between the chambers and between chambers and working horizons create 3-4 times higher than the critical load-bearing capacity, the ventilation and transport slides are connected to the chambers by slopes, while parallel to the chambers at the level of their roof passes the slurry feed cable adjacent to the chambers The KOTopbie are evenly spaced along the length of the chambers. In addition, inclined drainage drifts are connected along the chambers, which are connected to the chambers with sboys, which are located at a height of razor, from the lower part of the drainage drift behind the camera passes a gesenko-like desalination tank connected to the drainage drift and the chamber at the level of its soil, trench and bottom. the chamber is filled with a drainage material, while the capacity of the drainage layer at the bottom of the chamber is increased in the direction from the transport drift to the russolorbike with overlapping of the lower assembly of the chamber with the drainage drift and the brine tank. FIG. Figures 1 and 2 show a slurry chamber with an inclined diagonal drainage drift and a network of necessary workings, a plan and a section, respectively. FIG. 1 and 2 are designated: a traffic drift 1; vent drift 2; slurry chamber 3; drainage layer 4 of variable power on the soil of the chamber; sludge and brine pipe 5; sdeki 6 drift 5 with chamber 3, serving to feed the slurry pulp into the chamber; diagonal drain (inclined) drift 7; sboki 8, connecting 7 with a chamber 3 at different heights; drainage material .9, filling W 7 and connections 8; brine collector 10 gezenk Jpazny. Warehouse of sludge into underground special chambers is produced as follows. Slurries liquefied at the factory with saturated brines in the ratio T: W 1: 3 - 1: 5 are fed through a sludge pipeline to the trunk or a special well, and then by gravity or by means of pumps through workings leading to the slime horizon, through the drift I and then through sludge drift 5 and co-flow 6 into chamber 3. When bleaching brines are taken from a chamber not equipped with drainage devices, the slurry slurry is poured into the chamber as fully as possible at first for sludge (up to 40 days) and as the clarification is done the pumping of the SOLES is pumped installed in one of several sborkah 6, and the brine through the drift 5 and drift 1 is delivered to the trunk and then pumped to the surface and fed to the factory. At the same time, due to the need for a certain time for sludge separation in simultaneous operation, there must be several (minimum 2) chambers — pulp is fed into one chamber, and clarified brines are pumped out of the others. In the presence of drainage devices (4, 7, 8 and 9), the process of feeding the pulp and the brine is carried out simultaneously. In this case, in the work enough to have one slurry chamber. Calculations show that with a slurry chamber capacity over 200 thousand cubic meters. m. for underground sludge waste disposal at T: W 1: 1 it is enough to have one chamber in operation, and four chambers for the entire annual sludge waste volume, while to accommodate eight sludge storages would require 5 times more and The surface area is from 3 to 7 ha. When fully disposed of sludge wastes according to the method as in the prototype, taking into account the placement of the neighboring chambers with salt wastes, the annual volume of sludge requires more than 300 spent chambers in the Kp-U formation, i.e. 1.5 times more than required to work them to ensure the performance of the silvinit mine, i.e. full placement of sludge waste in the mine on the prototype method is impossible. In this case, a third part of the sludge waste would have to be stored in the sludge deposit. The main advantages of the proposed method of underground disposal of sludge (salt) waste are: the ability to refuse placement of sludge on the surface, which allows to save land and protect the environment from the harmful effects of sludge waste; universality of application in any development systems, since geomechanical influence and slurry hydraulic communication with working horizons are excluded; reducing the number of chambers for sludge placement, which increases productivity; the possibility of returnable brines of constant temperature and normal saturation, which improves the work of the factory and reduces the loss of the useful component.

Claims (2)

1. СПОСОБ ПОДЗЕМНОГО СКЛАДИРОВАНИЯ СОЛЕШЛАМОВЫХ ОТХОДОВ, включающий проходку камер с оставлением между ними целиков, проходку вентиляционного и транспортного штреков, гидравлическую доставку шламов от обогатительных фабрик, отбор рассолов и подачу их на обогатительные фабрики, отличающийся тем, что, с целью повышения безопасности работ по подземному складированию независимо от применяемых систем разработок, камеры проходят во вмещающих рабочие горизонты устойчивых рассоловодонепроницаемых породах, целики между камерами и между камерами и рабочими горизонтами создают с несущей способностью выше критической в 3-4 раза, вентиляционный и транспортный штреки соединяют с камерами уклонами, при этом параллельно камерам на уровне их кровли проходит шламоподающий штрек, соединяющийся с камерами сбойками, которые располагают равномерно по длине камер.1. METHOD FOR UNDERGROUND WAREHOUSING OF SALESHLAW WASTE, including the passage of chambers with the pillars between them, the passage of ventilation and transport drifts, the hydraulic delivery of sludge from the concentration plants, the selection of brines and their delivery to the concentration plants, characterized in that, in order to increase the safety of work on underground storage, regardless of the development systems used, the cameras pass in stable brine-impermeable rocks containing working horizons, pillars between cameras and between cameras ramie and workers create horizons with capacity above the critical 3-4 times, and the vent is connected to a transport drifts chambers biases, the parallel chambers at their level of the roof extends shlamopodayuschy drift, connecting with chambers sboyka that a uniformly along the length of the cameras. 2. Способ по π. 1, отличающийся тем, что, с целью интенсификации рассолоотделения солешламовых отходов, вдоль камер проходят наклонные дренажные штреки, соединяющиеся с камерами сбойками, которые располагают на разной высоте, сс стороны нижней части дренажного штрека за камерой проходит гезенкообразный рассолосборник, соединяющийся с дренажным штреком и камерой на уровне ее почвы, сбойки и дно камеры заполняют дренажным материалом, при этом мощность дренажного слоя на дне камеры увеличивают в направлении от транспортного штрека к рас-, солосборнику с перекрыванием нижних сбоек камеры с дренажным штреком и рассолосборником.2. The method according to π. 1, characterized in that, in order to intensify the brine separation of saline sludge waste, inclined drainage drifts pass along the chambers, connected to the chambers with failures, which are located at different heights, and from the side of the lower part of the drainage drift behind the camera there is a gesenka-shaped picker connected to the drainage drift and camera at the level of its soil, the faults and the bottom of the chamber are filled with drainage material, while the capacity of the drainage layer at the bottom of the chamber is increased in the direction from the transport drift to the saline collector with By closing the lower chamber failures with a drain drift and a pickle pan.
SU823408098A 1982-03-04 1982-03-04 Method of underground storage of salt and slime waste SU1058836A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823408098A SU1058836A1 (en) 1982-03-04 1982-03-04 Method of underground storage of salt and slime waste

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823408098A SU1058836A1 (en) 1982-03-04 1982-03-04 Method of underground storage of salt and slime waste

Publications (1)

Publication Number Publication Date
SU1058836A1 true SU1058836A1 (en) 1983-12-07

Family

ID=21001400

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823408098A SU1058836A1 (en) 1982-03-04 1982-03-04 Method of underground storage of salt and slime waste

Country Status (1)

Country Link
SU (1) SU1058836A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2477371C1 (en) * 2011-10-20 2013-03-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method of working-out backfilling in flooded potassium mine
RU2522120C1 (en) * 2013-03-12 2014-07-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Disposal of potassium concentration wastes
RU2693086C1 (en) * 2018-11-06 2019-07-01 Акционерное общество "ВНИИ Галургии" (АО "ВНИИ Галургии") Method of removing brine during filling chambers

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Технологи переработки калийных руд. Труды ВНИИГ, вып. 59, Л., 1972, с. 42. 2. Рекомендаци по технологии подземного размещени шламов в услови х рудника НСКЗ дл ТЭО развити НСКЗ. Отчет по теме 25-217/79-82. Ленинград-Пермь, 1980, с. 8-20. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2477371C1 (en) * 2011-10-20 2013-03-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Method of working-out backfilling in flooded potassium mine
RU2522120C1 (en) * 2013-03-12 2014-07-10 Открытое Акционерное Общество "Уральский Научно-Исследовательский И Проектный Институт Галургии" (Оао "Галургия") Disposal of potassium concentration wastes
RU2693086C1 (en) * 2018-11-06 2019-07-01 Акционерное общество "ВНИИ Галургии" (АО "ВНИИ Галургии") Method of removing brine during filling chambers

Similar Documents

Publication Publication Date Title
RU2031199C1 (en) Complex of structures made in several phases in region of ground water of rock mass under buried wastes and method for making complex structures
SU665819A3 (en) Settling tank for hydraulic mines
Prokopenko et al. Environmental oriented imperative of developing the opening technology and excavation of horizontal fields
SU1058836A1 (en) Method of underground storage of salt and slime waste
Marinin et al. State-of-Art of mine engineering reclamation while developing of steep-dipping ore fields
RU2627504C1 (en) Mine drainage in flat and pitching mining of coal deposits with combined method
RU2622971C1 (en) Mine drainage during development of anticlinal coal deposits by combined method
US3762771A (en) Mine layout applicable to natural resources development
Reznik et al. Open Pit Mining Technologies for Watered Lignite Deposits in the Kansk—Achinsk Basin
CN114410986A (en) Ecological environment-friendly treatment method for prolonging service life and improving productivity of lithium extracted from salt lake
CN108194083B (en) Honeycomb mining and strategic oil storage combined implementation method
RU2114307C1 (en) Method for opencast mining of flooded mineral deposits
Dixon-Hardy et al. Methods for the disposal and storage of mine tailings
Burrell et al. The influence of minewater recovery on surface gas and water discharges in the Yorkshire Coalfield
RU2235879C1 (en) Method for extracting salt deposits
RU2522120C1 (en) Disposal of potassium concentration wastes
RU1799412C (en) Method for withdrawal of mineralized water from underground mine working
Gallagher et al. The Avoca mine site
SU1239324A1 (en) Method of depositing rock into dumps
RU2188945C2 (en) Method of complex development and utilization of mineral resources
RU2270340C2 (en) Method for ground washing in
Gazizov Water regime control in mines and quarries in the USSR coal industry
RU1788251C (en) Method for finishing opencast in mining steeply dipping mineral deposits
Reid et al. Long-Term Solid Waste Management and KCl Facilities Decommissioning
SU787685A1 (en) Method of filling-in excavated space