SU1040167A1 SU813349610A SU3349610A SU1040167A1 SU 1040167 A1 SU1040167 A1 SU 1040167A1 SU 813349610 A SU813349610 A SU 813349610A SU 3349610 A SU3349610 A SU 3349610A SU 1040167 A1 SU1040167 A1 SU 1040167A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lining
filling
period
space
fixing
Prior art date
Application number
SU813349610A
Other languages
Russian (ru)
Inventor
Константин Аркадьевич Ардашев
Михаил Павлович Зборщик
Борис Зиновьевич Амусин
Александр Федорович Морозов
Original Assignee
Донецкий Ордена Трудового Красного Знамени Политехнический Институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Донецкий Ордена Трудового Красного Знамени Политехнический Институт filed Critical Донецкий Ордена Трудового Красного Знамени Политехнический Институт
Priority to SU813349610A priority Critical patent/SU1040167A1/en
Application granted granted Critical
Publication of SU1040167A1 publication Critical patent/SU1040167A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

СПОСОБ КРЕПЛЕНИЯ ВЫРА- .БОТКИ ,включающий установку рам крепи. межрамных ограждений, заполнение закрепного пространства и нагружение крепи посредством распорного устройства;до величины,равной ее не- сущей способности, о т л и ч а ющ и и с   тем, что, с целью снижени  затрат на крепление выработки за счет повышенной прочности забутовки , заполнение закрепного пространства производ т с использованием в жущего материала с периодом набора П1 очности, соответствующим периоду распора крепи, продолжительность которого выбирают равным времени подвигани  забо  выработки на длину размещенного в нем технологического проходческого оборудовани .,METHOD FOR FASTENING EXPOSURE, including mounting frames. interframe fencing, filling the anchored space and loading the lining by means of a spacer, up to a value equal to its inherent capacity, and with the fact that, in order to reduce the cost of fixing production due to the increased strength of the backing, the fixing space is filled using a fixed material with a set period of P1 of the specificity corresponding to the stanchion support period, the duration of which is chosen equal to the time of advancement of the working output for the length of those placed in it Technological tunneling equipment.,

Description

а Изобретение относитс  к способа креплени  подземных горных выработок в угольной и горнодобывающей промышленности. Известен способ креплени  выработки , включающий установку рам крепи и межрамных ограждений и заполнение закрепного пространства, при котором дл  обеспечени  устойчивости выработки используетс  пас сивный отпор крепи, возникающий в результате сдвижени  вмещающих пород Ci. Недостаток такого способа заклю чаетс  в отсутствиинадежного контакта крепи с контуром выработки из-за неплотной забутовки при возведении крепи. Наиболее близким к изобретению по технической сущности и достигае мому результату  вл етс  способ креплени  выработки, включающий ус новку рам крепи, межрамных огражде ний, заполнение закрепного простра ства и нагружение крепи посредством распорного устройства до велич ны, равной ее несущей способности С Недостаток такого способазаклю . чаетс  в том, что после сн ти  рас порного устройства окружающие выра ботку со временем деформирую с  и смещаютс  внутрь выработки, пр этом несв зный забутовочный материа не преп тствует этому, смещению. Дл ограничени  смещени  пород приходитс  увеличивать плотность крепи, что влечет за собой повышение затрат на крепление выработки. Цель изобретени  - снижение затрат на крепление выработки за счет повышенной прочности забутовки . Эта цель достигаетс  тем, что согласно способу креплени  выработ ки, включающему установку рам креп межрамных ограждений, заполнение закрепленного пространства и нагружение крепи посредством распорного устройства до величины, равной ее несущей способности, заполнение закрепного I пространства производ т с использованием в жущего материала с периодом набора прочности , соответствующим периоду распора крепи, продолжительность которого выбирают равным времени подвигани  забо  выработки на длину размещенного в нем технологического проходческого оборудовани . Технологи  способа креплени  выработки заключаетс  в следующем. После выемки породы в проходческом забое на длину заходки производ т установку рам податливой крепи с соединением верхн ков и стоек между собой путем их нахлестки и скреплени  с помощью замков. Затем устанавливают межрамные ограждени  (например железобетонную зат жку), заполн ют закрепное пространство, например , породой, полученной при проходке , и в породу с помощью форсунки подают в жущий материал (например , на основе синтетических смол), который должен иметь период набора прочности, равный по продолжительности времени подвигани  забо  на длину размещенного в нем технологического проходческого оборудовани  . По мере прохода технологического проходческого оборудовани  устанавливают распорные устройства., например стойки ГС с удлин ю:щими насадками , которые размещают ripcepeдине выработки с упором одного конца в верхн к крепи, а другого - в почву. После этого ослабл ют замки крепи и производ т ее нагружение, осуществл   контроль нагрузки по манометру гидргзстойки. Нс1гружение крепи производ т до величины, равной ее несущей способности, после чего зат гивают замки крепи и по истечении периода набора прочности в жущего материала забутовхи стойки ГС удал ют. Экономический эффект от применени  предлагаемого способа достигаетс  за счет повышени  устойчивости выработки.The invention relates to a method of securing underground mines in the coal and mining industries. There is a known method of fixing production, including the installation of support frames and interframe barriers and the filling of anchored space, in which passive support of the support, resulting from displacement of host rocks Ci, is used to ensure the stability of the development. The disadvantage of this method lies in the absence of a reliable contact of the support with the production contour due to the weak lining during the construction of the support. The closest to the invention in technical essence and achievable result is a method of fixing production, including mounting the support frames, interframe fencing, filling the fixed space and loading the support by means of a spacer to a value equal to its carrying capacity. The fact is that after the removal of the dispersed device, the surrounding workings deform with time and are displaced inside the excavation, just this non-interlocking backing material does not prevent this displacement. In order to limit the displacement of rocks, it is necessary to increase the support density, which entails an increase in the cost of fixing the excavation. The purpose of the invention is to reduce the cost of fixing production due to the increased strength of the packing. This goal is achieved by the fact that according to the method of fastening the production, which includes installing frames of crepe frames, filling the fixed space and loading the lining by means of a spacer up to a value equal to its carrying capacity, the fixed space I is filled using fixed material with a set period strength, corresponding to the period of strut lining, the duration of which is chosen to be equal to the time of the development of the slaughter for the length of the technological heading equipment. The method of fastening production is as follows. After the excavation of the rock in the subsoil for the length of the inlet, the frames of the flexible support are mounted with a joint of the tops and the uprights between them by overlapping them and fastening them with locks. Then interframe barriers are installed (for example, reinforced concrete tightening), the fixing space is filled with, for example, rock obtained during sinking, and into the rock using a nozzle is fed into a cinder material (for example, based on synthetic resins), which should have a period of curing, equal in duration to the time of the advancement of the length of the technological tunneling equipment placed in it. As technological tunneling equipment passes through, spacers are installed, for example, racks of HSs with elongated nozzles, which place the riping center of production with an emphasis of one end upwards to the support, and the other into the ground. After that, lining locks are loosened and its loading is effected, by monitoring the load on the gauge. Hc1 lining is carried out to a value equal to its carrying capacity, after which the lugs are fastened and, after the curing strength of the tamping material, the obstacles of the GS stand are removed. The economic effect of the application of the proposed method is achieved by increasing the sustainability of production.

Claims (1)

СПОСОБ КРЕПЛЕНИЯ ВЫРАБОТКИ, включающий установку рам крепи. межрамных ограждений, заполнение закрепного пространства и нагружение крепи посредством распорного устройства,до величины,равной ее не— сущей способности, отличающийся тем, что, с целью снижения затрат на крепление выработки за счет повышенной прочности забутовки, заполнение закрепного пространства производят с использованием Вяжущего материала с периодом набора прочности, соответствующим периоду распора крепи, продолжительность которого выбирают равным времени подвигания забоя выработки на длину размещенного в нем технологического проходческого оборудования.! qMETHOD OF FASTENING OF PRODUCTION, including the installation of support frames. interframe fencing, filling the securing space and loading the lining by means of a spacer device, to a value equal to its load bearing capacity, characterized in that, in order to reduce the costs of securing the mine due to the increased strength of the backfill, the filling of the securing space is carried out using Binder material with the period of curing, corresponding to the period of expansion of the lining, the duration of which is chosen equal to the time of movement of the bottom face of the mine for the length of the technological th tunneling equipment.! q
SU813349610A 1981-07-24 1981-07-24 Method of supporting working SU1040167A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813349610A SU1040167A1 (en) 1981-07-24 1981-07-24 Method of supporting working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813349610A SU1040167A1 (en) 1981-07-24 1981-07-24 Method of supporting working

Publications (1)

Publication Number Publication Date
SU1040167A1 true SU1040167A1 (en) 1983-09-07

Family

ID=20980994

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813349610A SU1040167A1 (en) 1981-07-24 1981-07-24 Method of supporting working

Country Status (1)

Country Link
SU (1) SU1040167A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР №618558, кл. Е 21 D 13/04, 1978. 2. Авторское свидетельство СССР . №887812, кл. Е 21 D 11/00, 1979 (прототип). *

Similar Documents

Publication Publication Date Title
US2667037A (en) Suspension roof support
Biron et al. Design of supports in mines
RU2125652C1 (en) Method of extracting operations
CN105019924A (en) Strong roof support pier column and method for protecting section coal pillar
CA1139322A (en) Method of mining
US4174135A (en) Underground formed wall single-entry mining method
SU1040167A1 (en) Method of supporting working
RU2128773C1 (en) Method for supporting mining workings with loose roof rock by anchor support
RU2087720C1 (en) Method of support of mine workings and device for its embodiment
CN208534517U (en) A kind of combined anchor anchor cable support apparatus
CN106121678A (en) The detection of a kind of top board empty top zone based on the radar exploration technique and roadway repair method
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
SU887812A1 (en) Method of controlling a preparation working with yielding frame-type roof support
CN108625889A (en) A kind of combined anchor anchor cable support apparatus
CN220929426U (en) Colliery goaf tunnel reinforcing apparatus
RU2000438C1 (en) Method of securing rock workings
SU1032189A1 (en) Frame roof support for mine working
RU2005882C1 (en) Method for reconditioning and supporting of workings caved with enclosing rocks
RU2004811C1 (en) Method for tunnel lining with monolithic concrete
SU1668681A1 (en) Support for mine working
RU2164293C2 (en) Process of working of coal seams
SU1008459A1 (en) Method for supporting preparation working with yilding mining roof support
SU1446344A1 (en) Method of reinforcing filling-up mass
SU1168719A1 (en) Method of securing and filling-up a void outside a mine working support
SU1758245A1 (en) Mine fill stopping