SU1030550A1 - Method for working coal seams - Google Patents
Method for working coal seams Download PDFInfo
- Publication number
- SU1030550A1 SU1030550A1 SU813272643A SU3272643A SU1030550A1 SU 1030550 A1 SU1030550 A1 SU 1030550A1 SU 813272643 A SU813272643 A SU 813272643A SU 3272643 A SU3272643 A SU 3272643A SU 1030550 A1 SU1030550 A1 SU 1030550A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- preparatory
- carried out
- coal
- direction perpendicular
- development
- Prior art date
Links
Landscapes
- Solid Fuels And Fuel-Associated Substances (AREA)
Abstract
1. СПОСОБ РАЗРАБОТКИ УГОЛЬНЫХ ПЛАСТрВ.вкпючакиий проведе1ше подготовительных и очнсттлс вырабо ГОК и выемку угл очистными забо ми, отличающийс тем, что, с цепью повышени эффективное 1м paapajSoi к эе счет исключени Ъроведени нареэ ной тупиковой выработки, очиствые работы начинают из части подготовительной выработки, пройденной по пласту.вдоль нее и ведут их в направлении, перпендикул рном к этой выработке, причем часть подготовительной выработки, из которой ведут очистные .работы, провод т двухi этажной с расположением одного этажа в почве пласта, а другого в пласте. 24ebpco6nojnt. 1, отличающийс . тем, что, У работы по выемке угл ведут с развор1)том забо -вокруг одного из его концов по предварительно пробуренной из подготовительной выработки по крайней мере одной вентил ционной сква.- жине до пересечени с другой подготови- g |тельной выработкой, после чего дальнейсл шую отработку ведут в направлении, перпендикул рном к первоначальному. с1. METHOD FOR DEVELOPING COAL PLASTICS V. VOKPYUCHAKII held preparatory and on-site mining of ore and coal mining with clearing areas, characterized in that, with an effective circuit of 1m paapaiSoi, to this account, exclude the dead-end deadlines and no more subject blocks. traversed along the reservoir. Along it, they lead them in a direction perpendicular to this excavation, and part of the preparatory excavation, from which purification works are carried out, is carried out in two floors with one Ms. in the soil of the reservoir, and the other in the reservoir. 24ebpco6nojnt. 1, different. so that, at the work on excavation, coal is carried out with a spreading1) of a flank around one of its ends along pre-drilled from a preparatory development of at least one ventilation well. before the intersection with the other preparatory development, then Further testing is carried out in a direction perpendicular to the original. with
Description
СП Ori Изобрегение ртноситс к горной мышле ности и предназначено дл разрвботки угольных пластов. Известен способ разработ1С11 угольньо пластов ( Одна|со данный способ недостаточно аффективен. Известен опособ разработки угольных . плабтоЬг: блслючахшнй проведение подготоч внгельных и очистных выработок и выемiqr очистными забо ми СЯ. 3 Однако известный способ также характеризуетс недостаточной эффективностью. Целью изобретени вп ек: повышенна . вффективностн разработки за счет исклю-, чени проведени нарезной тупиковой выра :ботки. - ;, : . .;.;, . Поставленна цель достигаетс тем, (ЧТО согласно способу разрабыки угога.-, ных пластов, вкпючакшему проведение подготовительных к очистнмс|ныработок н выемку угл , очистными эвбо клн, вые рабопл начинают из части подгртови тельной выpaб6тки, пройденной по ппжРеу, вдоль нее н ведут их в направлении, пер енднкуп рнбм этой выработке, причем часть подготовнтельной выработки, нз которой ведут очистные, работы, провод т двухэтажной с расположением оцкого дта- жа, в пЬмве пласта,, а другого - ввйлаоте; ., . . Кровле того, рабо.ты по выемке угл ведуг с разворотом забо вокруг одного, из его концов по предварительно пробуренной из подготовительной выработки по крайней, мере одной вентил ционной скважине до пересечени с другой подго- говительной выработкой, после чего дальнейшую ,отработку ведут в направлегаш, перпендикуп рном|первоначальному. Способ осуществл етс следующим образом . Провод т подготовительные выработки . Часть одной из .подготовительных выра боток провод т двухэтажной с расположением одного атажа в почве пласта, а другого в - пласте. Очистные работы начинают из этой части подготовительной выработки и ведут их вдоль нее ;} направлении , перпендикул рном этой выработ ке. Работы по выемке угл ведут с разворотом забо вокруг одного из его конпов по предварительно пробуренной из подготовительной выработки по крайней мере одной вентип циорюй скважине дд пересечени с другой подготовительной выр.боткой, после чего дальнейшую оту работку ведут в - ншравлении, перпендикул рном перврначЁ 11Ьному. Предлагаемый способ позвол ет знатагельнО|Повьюить эффективность разработкиугольных пластов.SP Ori The isobregnation of mountainous thinking is intended for mining coal seams. The known method is the development of 1S11 coal seams (One | this method is not sufficiently affective. The development method for coal is known. Plaitt: perfect preparation of in-depth and clearing workings and removal of clearing pores. 3) However, the known method also has insufficient efficiency. development by eliminating the conduct of a rifled dead-end expression: treating. -;,:..;.;,.. The goal is achieved by (THAT according to the method of developing the threat. - In which the preparatory preparations for the cleaning of coal mining, the cleaning workshops, the workers, start from the part of the preparatory development, passed according to PPJReu, along it and lead them in the direction of the development of this development, and part of the preparation, which they cleaning, work, carried out a two-story with the location otskogo dtazh, in the pyme reservoir, and the other - in the vail.;.. the roof of that, dredging the coal lead with a turn around the bottom of one, from under otovitelnoy produce at, least one vent hole to intersect the other output of podgo- govitelnoy, whereupon further, testing of lead in napravlegash, perpendikup polar | original. The method is carried out as follows. Conducted preparatory development. A part of one of the preparatory works is carried out in a two-storeyed building with one layout in the soil of the formation, and the other in the formation. The cleaning works start from this part of the preparatory development and lead them along it;} a direction perpendicular to this development. The excavation of coal is carried out with a turn of the bottom around one of its cusps along the previously drilled from the preparatory development of at least one ventilation well at the intersection with the other preparatory development, after which further extraction is carried out in the direction perpendicular to the starting point 11b. The proposed method allows for knowledge of the efficiency of the development of coal seams.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813272643A SU1030550A1 (en) | 1981-04-08 | 1981-04-08 | Method for working coal seams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813272643A SU1030550A1 (en) | 1981-04-08 | 1981-04-08 | Method for working coal seams |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1030550A1 true SU1030550A1 (en) | 1983-07-23 |
Family
ID=20952290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813272643A SU1030550A1 (en) | 1981-04-08 | 1981-04-08 | Method for working coal seams |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1030550A1 (en) |
-
1981
- 1981-04-08 SU SU813272643A patent/SU1030550A1/en active
Non-Patent Citations (1)
Title |
---|
1. Мелыткоь Н. И. Проведение и креппенве горных выработок. М„ Недра, 1979, с. 281-291. 2. Авторское свндетепьстео СССР Ml 578457, кп. Е 21 С 41/О4, 1%75 (проготип). * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1030550A1 (en) | Method for working coal seams | |
SU1125333A1 (en) | Method of decreasing water inflow in mine workings in mining coal seams | |
RU2201507C1 (en) | Method of ventilation of excavation section during inverse order of development | |
SU1461941A1 (en) | Method of mining steep ore bodies | |
SU825958A1 (en) | Method of working thin coal seams | |
SU560982A1 (en) | The method of controlling the main roof in the development of flat and sloping coal seams | |
SU723141A1 (en) | Method of working gently sloping coal seams | |
SU842194A1 (en) | Method of mining sloping ore bodies | |
SU894210A1 (en) | Method of catching methane in excavated area of coal seam being worked | |
SU1089266A1 (en) | Method of mining thick coal beds | |
RU2149999C1 (en) | Method of mining flat seams prone to heaving | |
SU1273560A1 (en) | Method of preventing inflow of water into stoping faces | |
SU717342A1 (en) | Method of mining horizontal and gently sloping mineral beds | |
SU899952A1 (en) | Method of strip mining of minerals in adverse geologic conditions | |
SU663840A1 (en) | Method of excavating steep coal seams | |
SU907253A1 (en) | Method of working gently sloping and sloping coal beds | |
SU899957A1 (en) | Method of mining steep and sloping coal beds | |
SU605002A1 (en) | Method of mining thick slightly inclined mineral deposits | |
SU646055A1 (en) | Method of isolating fissured rock of water levels around mine shafts under construction | |
SU608949A1 (en) | Method of removing gas from blind workings | |
SU909176A1 (en) | Method of working thin and medium-thick coal beds | |
SU1208132A1 (en) | Method of restoring the water intake capacity of closed drainage | |
SU994735A1 (en) | Method of working coal seams with long stoping longwalls | |
SU951016A1 (en) | Air treatment method | |
SU643644A1 (en) | Method of mining thick steep coal seams |