SU1030550A1 - Method for working coal seams - Google Patents

Method for working coal seams Download PDF

Info

Publication number
SU1030550A1
SU1030550A1 SU813272643A SU3272643A SU1030550A1 SU 1030550 A1 SU1030550 A1 SU 1030550A1 SU 813272643 A SU813272643 A SU 813272643A SU 3272643 A SU3272643 A SU 3272643A SU 1030550 A1 SU1030550 A1 SU 1030550A1
Authority
SU
USSR - Soviet Union
Prior art keywords
preparatory
carried out
coal
direction perpendicular
development
Prior art date
Application number
SU813272643A
Other languages
Russian (ru)
Inventor
Аркадий Валентинович Аулов
Original Assignee
Aulov Arkadij V
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aulov Arkadij V filed Critical Aulov Arkadij V
Priority to SU813272643A priority Critical patent/SU1030550A1/en
Application granted granted Critical
Publication of SU1030550A1 publication Critical patent/SU1030550A1/en

Links

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

1. СПОСОБ РАЗРАБОТКИ УГОЛЬНЫХ ПЛАСТрВ.вкпючакиий проведе1ше подготовительных и очнсттлс вырабо ГОК и выемку угл  очистными забо ми, отличающийс  тем, что, с цепью повышени  эффективное 1м paapajSoi к  эе счет исключени  Ъроведени  нареэ ной тупиковой выработки, очиствые работы начинают из части подготовительной выработки, пройденной по пласту.вдоль нее и ведут их в направлении, перпендикул рном к этой выработке, причем часть подготовительной выработки, из которой ведут очистные .работы, провод т двухi этажной с расположением одного этажа в почве пласта, а другого в пласте. 24ebpco6nojnt. 1, отличающийс   . тем, что, У работы по выемке угл  ведут с развор1)том забо  -вокруг одного из его концов по предварительно пробуренной из подготовительной выработки по крайней мере одной вентил ционной сква.- жине до пересечени  с другой подготови- g |тельной выработкой, после чего дальнейсл шую отработку ведут в направлении, перпендикул рном к первоначальному. с1. METHOD FOR DEVELOPING COAL PLASTICS V. VOKPYUCHAKII held preparatory and on-site mining of ore and coal mining with clearing areas, characterized in that, with an effective circuit of 1m paapaiSoi, to this account, exclude the dead-end deadlines and no more subject blocks. traversed along the reservoir. Along it, they lead them in a direction perpendicular to this excavation, and part of the preparatory excavation, from which purification works are carried out, is carried out in two floors with one Ms. in the soil of the reservoir, and the other in the reservoir. 24ebpco6nojnt. 1, different. so that, at the work on excavation, coal is carried out with a spreading1) of a flank around one of its ends along pre-drilled from a preparatory development of at least one ventilation well. before the intersection with the other preparatory development, then Further testing is carried out in a direction perpendicular to the original. with

Description

СП Ori Изобрегение ртноситс  к горной мышле ности и предназначено дл  разрвботки угольных пластов. Известен способ разработ1С11 угольньо пластов ( Одна|со данный способ недостаточно аффективен. Известен опособ разработки угольных . плабтоЬг: блслючахшнй проведение подготоч внгельных и очистных выработок и выемiqr очистными забо ми СЯ. 3 Однако известный способ также характеризуетс  недостаточной эффективностью. Целью изобретени   вп ек:  повышенна . вффективностн разработки за счет исклю-, чени  проведени  нарезной тупиковой выра :ботки. - ;, : . .;.;, . Поставленна  цель достигаетс  тем, (ЧТО согласно способу разрабыки угога.-, ных пластов, вкпючакшему проведение подготовительных к очистнмс|ныработок н выемку угл , очистными эвбо клн, вые рабопл начинают из части подгртови тельной выpaб6тки, пройденной по ппжРеу, вдоль нее н ведут их в направлении, пер енднкуп рнбм этой выработке, причем часть подготовнтельной выработки, нз которой ведут очистные, работы, провод т двухэтажной с расположением оцкого дта- жа, в пЬмве пласта,, а другого - ввйлаоте; ., . . Кровле того, рабо.ты по выемке угл  ведуг с разворотом забо  вокруг одного, из его концов по предварительно пробуренной из подготовительной выработки по крайней, мере одной вентил ционной скважине до пересечени  с другой подго- говительной выработкой, после чего дальнейшую ,отработку ведут в направлегаш, перпендикуп рном|первоначальному. Способ осуществл етс  следующим образом . Провод т подготовительные выработки . Часть одной из .подготовительных выра боток провод т двухэтажной с расположением одного атажа в почве пласта, а другого в - пласте. Очистные работы начинают из этой части подготовительной выработки и ведут их вдоль нее ;} направлении , перпендикул рном этой выработ ке. Работы по выемке угл  ведут с разворотом забо  вокруг одного из его конпов по предварительно пробуренной из подготовительной выработки по крайней мере одной вентип циорюй скважине дд пересечени  с другой подготовительной выр.боткой, после чего дальнейшую оту работку ведут в - ншравлении, перпендикул рном перврначЁ 11Ьному. Предлагаемый способ позвол ет знатагельнО|Повьюить эффективность разработкиугольных пластов.SP Ori The isobregnation of mountainous thinking is intended for mining coal seams. The known method is the development of 1S11 coal seams (One | this method is not sufficiently affective. The development method for coal is known. Plaitt: perfect preparation of in-depth and clearing workings and removal of clearing pores. 3) However, the known method also has insufficient efficiency. development by eliminating the conduct of a rifled dead-end expression: treating. -;,:..;.;,.. The goal is achieved by (THAT according to the method of developing the threat. - In which the preparatory preparations for the cleaning of coal mining, the cleaning workshops, the workers, start from the part of the preparatory development, passed according to PPJReu, along it and lead them in the direction of the development of this development, and part of the preparation, which they cleaning, work, carried out a two-story with the location otskogo dtazh, in the pyme reservoir, and the other - in the vail.;.. the roof of that, dredging the coal lead with a turn around the bottom of one, from under otovitelnoy produce at, least one vent hole to intersect the other output of podgo- govitelnoy, whereupon further, testing of lead in napravlegash, perpendikup polar | original. The method is carried out as follows. Conducted preparatory development. A part of one of the preparatory works is carried out in a two-storeyed building with one layout in the soil of the formation, and the other in the formation. The cleaning works start from this part of the preparatory development and lead them along it;} a direction perpendicular to this development. The excavation of coal is carried out with a turn of the bottom around one of its cusps along the previously drilled from the preparatory development of at least one ventilation well at the intersection with the other preparatory development, after which further extraction is carried out in the direction perpendicular to the starting point 11b. The proposed method allows for knowledge of the efficiency of the development of coal seams.

Claims (2)

‘ ( 57) 1. СПОСОБ РАЗРАБОТКИ УГОЛЬНЫХ ПЛАСТОВ .включающий проведе-! вне подготовительных и очистных выработок и выемку угля очистными забоями, отличающийся тем, что, с далью повышения эффективности разработ^ ни за счет исключения проведения нарез ной тупиковой выработки, очистные работы начинают из части подготовительной выработки, пройденной по п лас ту, fвдоль нее и ведут их в направлении, перпендикулярном к этой выработке, причем часть подготовительной выработки, из которой ведут очистные , работы, проводя г двухэтажной с расположением одного этажа в почве пласта, а другого - в пласте.'(57) 1. METHOD OF DEVELOPING COAL PLASES. Including conduct-! outside the preparatory and treatment openings, and coal mining by the working faces, characterized in that, with a view to improving the development efficiency due to the exclusion of rifled dead-end working, treatment works begin from the part of the preparatory working, passed along the strip, f along it and they lead them in the direction perpendicular to this mine, and part of the preparatory mine, from which the sewage treatment works, spend two floors with the location of one floor in the soil of the formation, and the other in the formation. 2« Способ поп. 1, отпичающийс я . тем, что, / работы по выемке угля ведут с разворотом забоя вокруг одного из его концов по предварительно пробуренной из подготовительной выработки по крайней мере одной вентиляционной сква?.жине до пересечения с другой подготови- § ^тельной выработкой, после чего дальней- шую отработку ведут в направлении, пер- У пендикулярном к первоначальному. |10305502 "The method of pop. 1, repelling. by the fact that / the work on coal mining is carried out with the face turned around one of its ends according to the previously drilled from the preparatory mine workings of at least one ventilation hole? .. to the intersection with the other preparatory mine workings, after which further mining lead in the direction perpendicular to the original. | 1030550
SU813272643A 1981-04-08 1981-04-08 Method for working coal seams SU1030550A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813272643A SU1030550A1 (en) 1981-04-08 1981-04-08 Method for working coal seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813272643A SU1030550A1 (en) 1981-04-08 1981-04-08 Method for working coal seams

Publications (1)

Publication Number Publication Date
SU1030550A1 true SU1030550A1 (en) 1983-07-23

Family

ID=20952290

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813272643A SU1030550A1 (en) 1981-04-08 1981-04-08 Method for working coal seams

Country Status (1)

Country Link
SU (1) SU1030550A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Мелыткоь Н. И. Проведение и креппенве горных выработок. М„ Недра, 1979, с. 281-291. 2. Авторское свндетепьстео СССР Ml 578457, кп. Е 21 С 41/О4, 1%75 (проготип). *

Similar Documents

Publication Publication Date Title
SU1030550A1 (en) Method for working coal seams
SU1125333A1 (en) Method of decreasing water inflow in mine workings in mining coal seams
RU2201507C1 (en) Method of ventilation of excavation section during inverse order of development
SU1461941A1 (en) Method of mining steep ore bodies
SU825958A1 (en) Method of working thin coal seams
SU560982A1 (en) The method of controlling the main roof in the development of flat and sloping coal seams
SU723141A1 (en) Method of working gently sloping coal seams
SU842194A1 (en) Method of mining sloping ore bodies
SU894210A1 (en) Method of catching methane in excavated area of coal seam being worked
SU1089266A1 (en) Method of mining thick coal beds
RU2149999C1 (en) Method of mining flat seams prone to heaving
SU1273560A1 (en) Method of preventing inflow of water into stoping faces
SU717342A1 (en) Method of mining horizontal and gently sloping mineral beds
SU899952A1 (en) Method of strip mining of minerals in adverse geologic conditions
SU663840A1 (en) Method of excavating steep coal seams
SU907253A1 (en) Method of working gently sloping and sloping coal beds
SU899957A1 (en) Method of mining steep and sloping coal beds
SU605002A1 (en) Method of mining thick slightly inclined mineral deposits
SU646055A1 (en) Method of isolating fissured rock of water levels around mine shafts under construction
SU608949A1 (en) Method of removing gas from blind workings
SU909176A1 (en) Method of working thin and medium-thick coal beds
SU1208132A1 (en) Method of restoring the water intake capacity of closed drainage
SU994735A1 (en) Method of working coal seams with long stoping longwalls
SU951016A1 (en) Air treatment method
SU643644A1 (en) Method of mining thick steep coal seams