SU1021785A1 - Method of constructing ferroconcrete tunnel lining - Google Patents

Method of constructing ferroconcrete tunnel lining Download PDF

Info

Publication number
SU1021785A1
SU1021785A1 SU823389485A SU3389485A SU1021785A1 SU 1021785 A1 SU1021785 A1 SU 1021785A1 SU 823389485 A SU823389485 A SU 823389485A SU 3389485 A SU3389485 A SU 3389485A SU 1021785 A1 SU1021785 A1 SU 1021785A1
Authority
SU
USSR - Soviet Union
Prior art keywords
section
tunnel
sections
constructing
area
Prior art date
Application number
SU823389485A
Other languages
Russian (ru)
Inventor
Леонид Васильевич Муравьев
Юрий Израилевич Левитин
Владимир Павлович Самойлов
Владимир Иосифович Ресин
Том Петрович Садовский
Адольф Никандрович Мишуков
Геннадий Абрамович Соколин
Валентин Григорьевич Лернер
Анатолий Петрович Свечкопалов
Original Assignee
Специальное Конструкторско-Технологическое Бюро Главмосинжстроя При Мосгорисполкоме
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Специальное Конструкторско-Технологическое Бюро Главмосинжстроя При Мосгорисполкоме filed Critical Специальное Конструкторско-Технологическое Бюро Главмосинжстроя При Мосгорисполкоме
Priority to SU823389485A priority Critical patent/SU1021785A1/en
Application granted granted Critical
Publication of SU1021785A1 publication Critical patent/SU1021785A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

СПОСОБ СООРУЖЕНИЯ ЖЕЛЕЗОБЕТОННОЙ ОБДЕЛКИ ТОННЕЛЯ, включающий монтгик секционной опалубки, опирае/х У ЛОО Si COiVOsJ ГЧччУСхчК мой на внутреникио поверхность тоннел , установку звеньев секций в рабочее положение, совместное бетонирование заопа лубочного пространства всех секций, склсщьшание шарнирно-сочлененных звеньев секций и перемещение секций вдоль оси тоннел , отличающийс  тем, что, с целью повышени  скорости сооружени  железобетонной обделки тоннел  путем бетонировани  по всему периметру сечени , : после перемещени  каждой предЕДцущей секции под.ее задний конец подвод т стационарную опору и убирают из заопалубочного пространства задние вьщвижные опоры этой секции, а после перемещени  каждой последующей секции их g передние вьщвижные опоры опираютс  и задний конец предьшущей секции. 1чЭ М СХ) ел 4г./METHOD OF CONSTRUCTING YOUR CONSTRUCTING OF AREA OF THE TUNNEL, INCLUDING THE AREA OF AREA, CONSTRUCTING AREA OF A CONFERENCE OF A TURNAL OF A TONNEL, INCLUDING A CREW OF A CREW AREA, A CONSTRUCTING OF AREA, A CONCRETE CREWING A CREW OF A CREW CREW a tunnel axis, characterized in that, in order to increase the speed of construction of a reinforced concrete lining of a tunnel by concreting along the entire perimeter of the section, after moving each EDtsuschey rear end section pod.ee supply ie stationary support and removed from the rear space zaopalubochnogo vschvizhnye support this section and, after each successive movement sections of g vschvizhnye abut front bearing and a rear end section predshuschey. 1CH M SH) ate 4g. /

Description

Изобретение относитс  к горной lipo мышленности, а именно к способу сооружени  железобетонной обделки/ и может быть использовано при сооружении внутренней железобетонной обделки тоннел  с применением опалубок. .Известен способ сооружени  железо бетонной обделки, включающий установку в.тоннеле многосекционной переносной опалубки, поочередное отсоединение задних секций, складывание их звеньев в транспортное положение, перенос сложенных секций с помощью самоходного устройства вперед в незабетонированную часть тоннел , разжа-г тие звеньев в рабочее положение, присоединение переносных секций к остальным секци м и бетонирование заопалубочного пространства перенесенных секций 1. Недостатком данного способа  вл ютс  большие трудозатраты на установку , перемещение и монтаж-демонтаж опалубки. Известен также способ сооружени  железобетонной обделки тоннел , включающий установку в тоннеле секционной опалубки, опираемой на внутреннюю поверхность тоннел , складывание шарнирно сочлененных звеньев секций, перемещение секций вдоль оси тоннел  вплотную друг к другу, установку звеньев секций в рабочее положение и совместное бетонирование заопалубочного пространства всех секций 2 Недостатком известного способа  в л етс  то, что дл  его осуществлени  необходимо предварительное сооружение лотка, что повышает трудозатраты и снижает скорость сооружени  железобетонной обделки, .. Целью изобретени   вл етс  повышение скорости сооружени  железобетонной обделки тоннел . Эта цель достигаетс  тем, что согласно способу сооружени  железобетонной обделки тоннел , включагацему монтаж секционной опалубки, опираемой на внутреннюю поверхность тоннел , установку звеньев секций в рабочее положение, совместное бетонирование заопалубочного пространства всех секций , складывание шарнирно сочлененных звеньев секций и перемещение секций вдоль оси тоннел , после перемещени  каждой предыдущей секции под ее задний конец подвод т стационарную опору и убирают из заопалубочного пространства задние выдвижные опоры этой секуии, а после перемещени  каждой последующей секции их передние выдвижные опоры опираютс  на задний конец предыдущей секции. На фиг. 1 изображено предлагаемое устройство, исходное положение на фиг. 2 - положение секции в тоннеле после передвижки на заходку; на фиг.Э положение опалубки в тоннеле после передвижки на заходку; на фиг. 4 вид А на фиг. 2. Перед очередной заходкой складывают с помощью гидроцилиндра 11 шарнирно сочлененные звень  7 - 10 секций 1 и,2. При помощи механизма перемещени  перемещают секцию 1 вдоль оси тоннел  на длину, равную сумме DjaroB бетонировани  обеих секций, после чего под задний конец секции 1 loдвoд т стационарную опору 4 и убирают из запалубочного пространства задние вьщвижные опоры б секции 1. Затем вплотную к секции 1 перемещают секцию 2, опира  при этом передние выдвижные опоры 5 секции 2 на задний конец секции 1. Устанавливают торцевое уплотнение 3 и производ т совмеетное бетонирование заопалубочного пространства обеих секций. После набора бетоном необходимой прочности цикл повтор етс . Применение предлагаемого способа сооружени  железобетонной обделки тоннел  позвол ет повысить скорость сооружени  железобетонной обделки.The invention relates to a mountain lipo of thought, namely to a method for constructing a reinforced concrete lining / and can be used in the construction of an internal reinforced concrete lining of a tunnel using formwork. A known method of constructing iron concrete lining, including the installation of the tunnel multi-section portable formwork, alternately disconnecting the rear sections, folding their links in the transport position, moving the folded sections using a self-propelled device forward into the non-concreted part of the tunnel, unloading the links in the working position , the attachment of the portable sections to the remaining sections and the concreting of the floor space of the transferred sections 1. The disadvantage of this method is the large labor costs and the installation, movement and installation-disassembly of formwork. There is also known a method for constructing a reinforced concrete tunnel lining, which includes installing sectional formwork in the tunnel supported on the inner surface of the tunnel, folding articulated links of sections, moving sections along the tunnel axis close to each other, setting sections of sections to the working position and joint concreting of the underground space of all sections 2 The disadvantage of this method is that for its implementation it is necessary to pre-construct a tray, which increases labor costs and reduces t lining concrete construction applications speed .. The aim of the invention is to increase the speed of construction applications concrete tunnel lining. This goal is achieved by the fact that, according to the method of constructing a reinforced concrete lining of a tunnel, including the installation of sectional formwork supported on the inner surface of the tunnel, the installation of sections of sections in working position, joint concreting of the bottom sections of all sections, folding of articulated sections of sections and movement of sections along the axis of the tunnel, after moving each previous section, a stationary support is brought under its rear end and the rear extendable supports are removed from the post-section space this secuy, and after moving each subsequent section, their front extendable supports rest on the rear end of the previous section. FIG. 1 shows the proposed device, the initial position in FIG. 2 - the position of the section in the tunnel after shifting to the stope; Fig. E: the position of the formwork in the tunnel after shifting to the stop; in fig. 4 view A in FIG. 2. Before the next entry, the articulated links 7 - 10 sections 1 and 2 are folded using the hydraulic cylinder 11. Using the moving mechanism, section 1 is moved along the tunnel axis by a length equal to the sum of DjaroB concreting both sections, after which the rear end section 1 of the head and stationary support 4 is removed and the rear outboard supports B of section 1 are removed from the backspace. Then, close to section 1, they move section 2, while supporting the front retractable supports 5 of section 2 to the rear end of section 1. Install the mechanical seal 3 and make a concreting of the bottom section of both sections together. After the concrete has gained the necessary strength, the cycle is repeated. The application of the proposed method for the construction of a reinforced concrete lining of a tunnel allows to increase the speed of the construction of a reinforced concrete lining.

Фаг.2Phage.2

/XXv- // N yX Nx)/ XXv- // N yX Nx)

lГ.. svfOyJlГ .. svfOyJ

ЮYU

Claims (1)

СПОСОБ СООРУЖЕНИЯ ЖЕЛЕЗОБЕТОННОЙ ОБДЕЛКИ ТОННЕЛЯ, включающий монтаж секционной опалубки, опирае- мой на внутреннюю поверхность тоннеля, установку звеньев секций в рабочее положение, совместное бетонирование заопалубочного пространства всех секций, складывание шарнирно-сочлененных звеньев секций и перемещение секций вдоль оси тоннеля, о т л и чающийся тем, что, с целью повышения скорости сооружения железобетонной обделки тоннеля путем бетонирования по всему периметру сечения, ;после перемещения каждой предыдущей секции под ее задний конец подводят стационарную опору и убирают из заопалубочного пространства задние выдвижные опоры этой секции, а после перемещения каждой последующей секции их § передние выдвижные опоры опираются на задний конец предыдущей секции. №METHOD FOR CONSTRUCTING REINFORCED-CONCRETE TUNNEL LINING, including installation of sectional formwork, supported on the inner surface of the tunnel, setting the section links into working position, joint concreting of the formwork space of all sections, folding the articulated sections of the sections and moving the sections along the tunnel axis and along the tunnel axis sistent in that, in order to increase the speed of reinforced concrete tunnel lining structures by concreting around the cross section perimeter; after moving each previous section, a stationary support is brought under its rear end and the rear sliding supports of this section are removed from the formwork space, and after each subsequent section is moved, their § sliding front supports rest on the rear end of the previous section. No.
SU823389485A 1982-02-05 1982-02-05 Method of constructing ferroconcrete tunnel lining SU1021785A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823389485A SU1021785A1 (en) 1982-02-05 1982-02-05 Method of constructing ferroconcrete tunnel lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823389485A SU1021785A1 (en) 1982-02-05 1982-02-05 Method of constructing ferroconcrete tunnel lining

Publications (1)

Publication Number Publication Date
SU1021785A1 true SU1021785A1 (en) 1983-06-07

Family

ID=20995041

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823389485A SU1021785A1 (en) 1982-02-05 1982-02-05 Method of constructing ferroconcrete tunnel lining

Country Status (1)

Country Link
SU (1) SU1021785A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Ав торск ое евидетельет6 о СССР №334358, кл. Е 21 D 11/10, 04.05.70 2. Транспортное строительство. Сборник. М., Институт ВПТИТрансстрой , if 1981, с. 2-3. *

Similar Documents

Publication Publication Date Title
US4315701A (en) Shuttering for erecting a concrete tunnel lining
SU1021785A1 (en) Method of constructing ferroconcrete tunnel lining
EP3830393A1 (en) Equipment assembly
CN110847922A (en) Operation control device and heading equipment
US4222681A (en) Shield for constructing tunnels with in-situ formed concrete lining
US1823757A (en) Subway and tunnel
SU1583520A1 (en) Method and apparatus for constructing a solid lining of a canal
JPH09151471A (en) Movable form device and work execution method for underground structure using the device
SU599072A1 (en) Method of shifting two-row pneumatic roof support
SU1573187A1 (en) Method of making joint of underwater tunnel section
KR102451937B1 (en) Tunnelfoam that can be used both for lining and intermediate slab for double-level tunnel
SU1164425A1 (en) Method of constructing the station complex of deep underground railway
SU1726749A1 (en) Method of dismantling shield supports
JPS5991298A (en) Shield drilling apparatus
SU1082959A1 (en) Matching roof support
SU1694915A1 (en) Method and equipment for producing double-layer in-situ cast tunnel lining
SU1101561A1 (en) Movable support-formwork
SU1234295A1 (en) Tail portion of belt telescopic conveyer
SU903569A1 (en) Method and apparatus for dismantling a power roof support
SU1096363A1 (en) Forms for constructing a cylindrical tunnel
SU1006758A1 (en) Conjugating mining roof support
SU998763A1 (en) Form for tunnel lining structure
SU1583710A1 (en) Method and apparatus for constructing a secondary lining in tunnel
SU785499A1 (en) Entry-driving machinery set
SU853056A1 (en) Form for concreting the walls of a building deformation seam