SU1017375A1 - Apparatus for automatic control of gas drying process - Google Patents

Apparatus for automatic control of gas drying process Download PDF

Info

Publication number
SU1017375A1
SU1017375A1 SU823378971A SU3378971A SU1017375A1 SU 1017375 A1 SU1017375 A1 SU 1017375A1 SU 823378971 A SU823378971 A SU 823378971A SU 3378971 A SU3378971 A SU 3378971A SU 1017375 A1 SU1017375 A1 SU 1017375A1
Authority
SU
USSR - Soviet Union
Prior art keywords
temperature
input
control unit
adsorbent
output
Prior art date
Application number
SU823378971A
Other languages
Russian (ru)
Inventor
Анатолий Викторович Абрамов
Александр Иванович Андрюшин
Владислав Владимирович Плотников
Александр Геннадьевич Агупов
Борис Александрович Сорокин
Татьяна Федоровна Красовицкая
Original Assignee
Предприятие П/Я А-3605
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я А-3605 filed Critical Предприятие П/Я А-3605
Priority to SU823378971A priority Critical patent/SU1017375A1/en
Application granted granted Critical
Publication of SU1017375A1 publication Critical patent/SU1017375A1/en

Links

Description

Изобретение относитс .к устройствам автоматического управлени  работой адсорбционных аппаратов в процес се осушки газа и может найти применение в химической и криогенной технике . Известно устройство дл  автоматического управлени  процессом осушки газа, содержащее блок программного управлени , соединенный с приводными устройствами арматуры и осуществл ющий автоматическое переключение адспрбентов из стадии адсэрбции в стадию регенерации f 1 . Наиболее близким к предлагаемому по технической сущности  вл етс  уст ройство дл  автоматического управлени  процессом осушки газа, содержащее блок программного управлени  и блоки регулировани  темпе|эатуры ад сорбента , каждый из которых содержит регул тор, первый задатчик, датчик и регул торы температуры процесса ре генерации температуры адсорбента и регенерирующего газа 23. Однако известное устройство не об ладает достаточно широкими функциональными возможност ми и ограничивают прЪведение процесса регенерации адсорбента заданием одного уровн  регулировани  температуры процесса регенерации. Целью изобретени   вл етс  повышение качества процесса регенерации адсорбента и экономии энергозатрат за счет расширени  функциональных возможностей устройства дл  автоматического управлени  процессом осушки газа. Поставленна  цель достигаетс  тем :что каждый блок регулировани  температуры адсорбента снабжен вторым задатчиком , инверторами, элементом задержки , элементами И, коммутатором и сигнализаторами температуры, при это выход первого сигнализатора температуры соединен с первым входом первого элемента И, второй вход которого через первый инвертор соединен с выходом второго сигнализатора температуры , подключенного также к первому входу второго элемента И, второй вхо которого через второй инвертор соединен с выходом элемента задержки, подклюненного к блоку программного управлени , а вход элемента задержки соединен с выходом третьего сигнализатора температуры, вход которого подключен к датчику температуры регенерирующего газа, соединенного также с входом первого и второго сигнализаторов температуры, выходы первого и второго элементов И подключены к блоку программного управлени  и к коммутатору, а выходы первого и второго задатчиков через коммутатор соединены с регул тором температуры, св занным с блоком Программного управлени 4 . На череже приведена блок-схема устройства дл  автоматического управлени  процессом осушки газа. Устройство дл  автоматического управлени  процессом осушки газа содержит блок программного управлени  1, осуществл ющий переключение адсорберов 2 и 3 из стадии адсорбции В стадию регенерации, воздейству  на исполнительные элементы -12 и два блока регулировани  13 и 1 температуры в адсорберах 2 и 3 соответственно . Блок регулировани  13 ( HV температуры адсорбента состоит из трех сигнализаторов температуры 15, 1Ь и 17, соединенных с датчиком температуры 18 (19) регенерирующего газа на выходе из адсорбера 2 (З )и настроенных на три различные температуры Т , Т , Т соответственно. Выход первого сигнализатора температуры 15 соединен с первым входом первого элемента И 20, второй вход которого через первый инвертор 21 соединен с выходом второго сигнализатора температуры 16 подключенного также к первому входу второго элемента И 22, второй вход которого через второй и 1вертор 23 соединен с выходом элемента задержки 2f, подключенного также к блоку Программного управлени  1, а вход элемента задержки 2 соединен с выходом третьего сигнализатора температуры 17. Дл  автоматического регулировани  температуры адсорбента при проведении процесса регенерации в состав блока регулировани  температуры 13 (1) входит регул тор- температуры 25, который включаетс  и отключаетс  блоком программного управлени  1 и управл ет работой электроподогревател  26 (27) по сигналам от датчика температуры 28 (29) адсорбента и задатчиком 30 и 31, подключаемых к регул тору с помощью коммутатора 32, входы которого соединены с выходами первого 20 и второго 22 элементов И, а также с выходами первого и второго задатчиков 30 и 31. Устройство работает следующим образом . При переключении адсорбера 2 в стадию регенерации блок программного управлени  открывает исполнительные элементы и 10, закрывает испол нительные элементы 6, 8 и дает коман ду на подачу предварительно подогретого регенерирующего газа в адсорбер 2, При достижении температуры регенерирующего газа на выходе из адсорбера значени  Т на выходе первого сигнализатора температуры 15 по вл етс  сигнал, который поступает на первый вход первого элемента И 20 Если температура регенерирующего газа не превышает значени  12 то на выходе второго сигнализатора температуры 16 отсутствует сигнал, а так как выход второго сигнализатора температуры 16 соединен с первым элементом И 20 через первый инвертор 21 то и на второй вход первого элемента И 20 поступает сигнал, сформированный инвертором 21. Первый элемент И 20 срабатывает и на его выходе по вл етс -сигнал, который, поступив на вход коммутатора 32, подключает к регул тору температуры 25 первый задатчик 30, настроенный на определенный уровень температуры регенерируемого адсорбента и начальный период процесса регенерации и, поступив в блок программного управлени , сформирует команду на включение регул тора дл  поддержани  задан ного задатчиком 30 значени  температуры адсорбентаj измер емого датчи ком температуры 28, с помощью электроподогревател  26. При достижении температуры регене рирующего газа на выходе из адсорбера значени  Т на выходе второго сигнализатора температуры 16 по вл етс  сигнал, который, поступив на первый вход второго элемента И 22 и на первый инвертор 21, снимет сигнал с выхода первого элемента И 20 и формирует сигнал на выходе второго элемента И 22, что приводит к отключению от регул тора 25 первого задатчика 3Q и подключению к нему второго задатчика. 31 настроенного на более высокий уровень температуры регенерируемого адсорбента. Кроме того, по сигналу второго элемента И 22 блок программного управлени  1 закрывает исполнителькмй элемент 12, что приводит к уменьшению расхода регенерирующего газ, подаваемого в адсорбер, и повышению его температуры на выходе из . Регедерирующий газ при этом поступает в адсор- ; бер через байпасную лигйюо исполнительного элемента 12, При повышении температуры регенерирующего газа до значени  Т срабатывает третий сигнализатор температуры 17, который включает элемент задержки 24, определ ющий врем  проведени  процесса регенерации адсорбента . По истечению Зс|Данного време ни элемент задержки формирует сигнал блоку программного управлени  сЛ окончании процесса регенерации, который отключает регул тор температуры 25. Блок регулировани  И темгшратуры адсорбента работает -аналогично. Введение в состав блоков регули- ровани  температуры адсорбента второго задатчика, двух инверторов, элемента задержки, двух элементов И, коммутатора и трех сигнализаторов температуры обеспечивает возможность более качественного проведени  процесса регенерации адсорбента на различных уровн х температуры и при различных расходах регенерирующего) газа. Предлагаемое устройство обеспечивает улучшение Качества процесса регенерации адсорбента в результате проведени  процесса регенерации адсорбента на различных уровн х температуры, уменьшение времени проведени  процесса регенерации за счет ступенчатого повышени  температуры адсорбента в процессе его регенерации, уменьшение затрат регенерирующегогаза (азота) на проведение процесса регенерации вследствие того, что при достижении температуры регенерирующего газа на выходе из адсорбера значени  Т2 блок программного управлени  1 закрывает исполнитель12 , и подача ре генерируный элемент ющего газа в адсорбер производитс  по байпасной линии исполнительного элемента 12 с меньшей пропускной способностью, а также за счет уменьшени  времени проведени  процесса регенерации, уменьшение затрат электроэнергии на процесс регенерацииThe invention relates to devices for the automatic control of the operation of adsorption apparatuses in the process of gas drying and can be used in chemical and cryogenic engineering. A device for automatic control of the gas drying process is known, comprising a software control unit connected to actuator actuators and automatically switching the adrbents from the adsarption stage to the regeneration stage f 1. The closest to the proposed technical entity is a device for automatic control of the gas drying process, which contains a software control unit and an adsorbent temperature control unit, each of which contains a controller, a first setter, a sensor, and temperature controllers for the temperature regeneration process. adsorbent and regenerating gas 23. However, the known device does not have sufficiently broad functionality and limits the implementation of the regeneration process of the adsorbent set One level control the temperature of the regeneration process. The aim of the invention is to improve the quality of the process of regeneration of the adsorbent and save energy costs by expanding the functionality of the device for automatic control of the gas drying process. The goal is achieved by the fact that each adsorbent temperature control unit is equipped with a second unit, inverters, delay element, AND elements, switch and temperature alarms, and the output of the first temperature indicator is connected to the first input of the first element I, the second input of which through the first inverter is connected to the output of the second temperature detector, also connected to the first input of the second element And, the second input of which through the second inverter is connected to the output of the delay element, connected to the program control unit, and the input of the delay element is connected to the output of the third temperature detector, the input of which is connected to the temperature sensor of the regenerating gas, also connected to the input of the first and second temperature detectors, the outputs of the first and second elements I are connected to the program control unit and to the switch , and the outputs of the first and second setters through the switch are connected to a temperature controller connected to the Software Control Unit 4. Below is a block diagram of a device for automatically controlling the gas drying process. The device for automatic control of the gas drying process contains a software control unit 1 that switches adsorbers 2 and 3 from the adsorption stage. In the regeneration stage, the actuators -12 and two control units 13 and 1 of temperature in adsorbers 2 and 3, respectively, are affected. The control unit 13 (HV adsorbent temperature consists of three temperature detectors 15, 1b and 17 connected to temperature sensor 18 (19) of the regenerating gas at the outlet of adsorber 2 (3) and tuned to three different temperatures T, T, T, respectively. Output The first temperature detector 15 is connected to the first input of the first element I 20, the second input of which through the first inverter 21 is connected to the output of the second temperature detector 16 also connected to the first input of the second element 22, the second input of which through the second and The inverter 23 is connected to the output of the delay element 2f, also connected to the Software control unit 1, and the input of the delay element 2 is connected to the output of the third temperature detector 17. To automatically control the temperature of the adsorbent during the regeneration process, the regulator torus-temperature 25, which is turned on and off by the program control unit 1 and controls the operation of the electric heater 26 (27) by signals from the temperature sensor 28 (29) of the adsorbent and the unit 3 0 and 31, connected to the controller using the switch 32, the inputs of which are connected to the outputs of the first 20 and second 22 And elements, as well as the outputs of the first and second setters 30 and 31. The device operates as follows. When switching the adsorber 2 to the regeneration stage, the program control unit opens the actuators and 10, closes the executive elements 6, 8 and gives the command to supply the preheated regenerating gas to the adsorber 2. When the temperature of the regenerating gas at the outlet of the adsorber reaches the output T The first temperature detector 15 appears a signal that arrives at the first input of the first element AND 20. If the temperature of the regenerating gas does not exceed a value of 12, then at the output of the second signal Ator temperature 16 there is no signal, and since the output of the second temperature detector 16 is connected to the first element AND 20 through the first inverter 21, then the second input of the first element AND 20 receives a signal formed by the inverter 21. The first element And 20 also operates at its output at is a signal which, arriving at the input of the switch 32, connects to the temperature controller 25 the first unit 30, which is set to a certain temperature level of the regenerated adsorbent and the initial period of the regeneration process and, having entered the progr The AMM control forms a command to turn on the regulator to maintain the adsorbent temperature set by the unit 30 that is measured by the temperature sensor 28 using the electric heater 26. When the temperature of the regenerating gas at the outlet from the adsorber reaches T, the output of the second temperature indicator 16 will reach signal, which, arriving at the first input of the second element And 22 and the first inverter 21, will remove the signal from the output of the first element And 20 and generates a signal at the output of the second element And 22, which leads to disconnect from the controller 25 of the first setting device 3Q and connect to it the second setting device. 31 tuned to a higher temperature level of the regenerated adsorbent. In addition, according to the signal of the second element And 22, the program control unit 1 closes the executive element 12, which leads to a decrease in the flow rate of the regenerating gas supplied to the adsorber and to an increase in its outlet temperature. In this case, the recording gas enters the adsor-; When the regenerating gas temperature rises to the value T, a third temperature detector 17 triggers, which includes a delay element 24, which determines the duration of the regeneration process of the adsorbent. On the expiration of the ZS | This time, the delay element generates a signal to the program control unit to complete the regeneration process, which turns off the temperature controller 25. The control unit And the adsorbent temperature works in a similar way. The introduction of a second controller, two inverters, a delay element, two AND elements, a switch and three temperature alarms into the composition of the temperature control units of the adsorbent provides an opportunity for a more qualitative process of regeneration of the adsorbent at different temperature levels and at different flow rates of the regenerating gas. The proposed device provides an improvement in the Quality of the adsorbent regeneration process as a result of carrying out the adsorbent regeneration process at various temperature levels, reducing the time required for the regeneration process due to a stepwise increase in the temperature of the adsorbent during its regeneration, reducing the regenerative gas (nitrogen) costs due to the fact that when the temperature of the regenerating gas at the outlet from the adsorber reaches the value of T2, the program control unit 1 closes the contractor 12, and the supply of the regenerating gas element to the adsorber is carried out along the bypass line of the actuating element 12 with a lower capacity, as well as by reducing the time spent for the regeneration process, reducing the cost of electricity for the regeneration process

Claims (1)

УСТРОЙСТВО ДЛЯ АВТОМАТИЧЕСКОГО УПРАВЛЕНИЯ ПРОЦЕССОМ ОСУШКИ ГАЗА, содержащее блок программного управления и блоки регулирования температуры адсорбента, каждый из которых содержит регулятор, первый задатчик, датчики температуры адсорбента и регенерирующего газа, отличающее ся тем, что, с целью повышения качества процесса регенерации адсорбента и экономии энергозатрат за счет расширения функциональных возможностей устройства, каждый блок регулирования температуры адсорбента снабжен вторым задатчиком, инверторами, элементом задержки, элементами И, коммутатором и сигнализаторами температуры, при этом выход первого сигнализатора температуры соединен с первым входом первого элемента И, второй вход которого через первый инвертор соединен с выходом второго сигнализатора температуры, подключенного к первому входу второго элемента И, второй вход которого через второй инвертор соединен с выхо-> дом элемента задержки, подключенного к блоку программного управления, а вход элемента задержки соединен с g выходом третьего сигнализатора температуры, вход которого подключен к датчику температуры регенерирующего газа, соединенного с входами первого и второго сигнализаторов температуры, выходы первого и второго элементов И подключены к блоку программного управления и к коммутатору, а выходы первого и второго задатчиков через коммутатор соединены с регулятором температуры, связанным с блоком программного управления.DEVICE FOR AUTOMATIC CONTROL OF THE GAS DRYING PROCESS, comprising a program control unit and adsorbent temperature control units, each of which contains a regulator, a first setpoint, temperature sensors of the adsorbent and regenerating gas, characterized in that, in order to improve the quality of the adsorbent regeneration process and save energy costs by expanding the functionality of the device, each adsorbent temperature control unit is equipped with a second setter, inverters, delay element, elements And, a switch and temperature indicators, while the output of the first temperature indicator is connected to the first input of the first element And, the second input of which through the first inverter is connected to the output of the second temperature indicator connected to the first input of the second element And, the second input of which is connected through the second inverter with the output> the house of the delay element connected to the program control unit, and the input of the delay element is connected to the g output of the third temperature detector, the input of which is connected to yes the temperature sensor of the regenerating gas connected to the inputs of the first and second temperature sensors, the outputs of the first and second elements And are connected to the program control unit and to the switch, and the outputs of the first and second setpoints are connected through the switch to a temperature controller connected to the program control unit.
SU823378971A 1982-01-06 1982-01-06 Apparatus for automatic control of gas drying process SU1017375A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823378971A SU1017375A1 (en) 1982-01-06 1982-01-06 Apparatus for automatic control of gas drying process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823378971A SU1017375A1 (en) 1982-01-06 1982-01-06 Apparatus for automatic control of gas drying process

Publications (1)

Publication Number Publication Date
SU1017375A1 true SU1017375A1 (en) 1983-05-15

Family

ID=20991346

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823378971A SU1017375A1 (en) 1982-01-06 1982-01-06 Apparatus for automatic control of gas drying process

Country Status (1)

Country Link
SU (1) SU1017375A1 (en)

Similar Documents

Publication Publication Date Title
US4023940A (en) Regeneration cycle control for industrial air dryer
US3359706A (en) Adsorption gasd treating method and apparatus
US4324564A (en) Adsorption beds and method of operation thereof
EP0135921A2 (en) Control system for air fractionation by selective adsorption
SU1017375A1 (en) Apparatus for automatic control of gas drying process
JP3172729B2 (en) Method of supplying steam to CO2 removal device
JPH0854901A (en) Load discrimination control method and device
SU1579542A1 (en) Automatic control system for installation for drying compressed air
JPS5787550A (en) Defrosting controller
SU854424A1 (en) Method of automatic control of adsorbent regeneration process
JP2515886B2 (en) Method and device for controlling duct heater in adsorption device
SU1215104A1 (en) Device for controlling temperature of article in autoclave
SU732804A1 (en) Control system
JPS59139916A (en) Change-over control of treating tower
JP2847876B2 (en) Electronic temperature controller
SU474659A1 (en) System for automatic control of the temperature of fresh steam
JPS5782640A (en) Operation controlling device for air-conditioning unit
SU1179292A1 (en) Temperature controller
JPH0666484A (en) Heat treatment device
SU620670A1 (en) Compressor capacity regulation system
SU481757A1 (en) Device for controlling the thermal regime of mineral wool furnaces
SU684523A1 (en) Regulator of pressure and temperature of the process of saturation of solid bodies with gas
JPH1024211A (en) Dry air feeder
JPS5915752A (en) Air-conditioning apparatus
SU874155A1 (en) Apparatus for automatic control of catalyst regeneration process in multilayer reactor