SE436772C - PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE - Google Patents

PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE

Info

Publication number
SE436772C
SE436772C SE8006375A SE8006375A SE436772C SE 436772 C SE436772 C SE 436772C SE 8006375 A SE8006375 A SE 8006375A SE 8006375 A SE8006375 A SE 8006375A SE 436772 C SE436772 C SE 436772C
Authority
SE
Sweden
Prior art keywords
piles
rod
wall
rods
procedure
Prior art date
Application number
SE8006375A
Other languages
Swedish (sv)
Other versions
SE8006375L (en
SE436772B (en
Inventor
Edvin Lindell
Original Assignee
Edvin Lindell
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Edvin Lindell filed Critical Edvin Lindell
Priority to SE8006375A priority Critical patent/SE436772C/en
Publication of SE8006375L publication Critical patent/SE8006375L/en
Publication of SE436772B publication Critical patent/SE436772B/en
Publication of SE436772C publication Critical patent/SE436772C/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/48Foundations inserted underneath existing buildings or constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

6006375-3 sontella krafter, av vilka pålarna påverkas via de snedställda stängerna upptages av stången och varigenom belastningen från väggen kan införas centriskt i pålarna. 6006375-3 solar forces, of which the piles are actuated via the inclined rods are absorbed by the rod and whereby the load from the wall can be introduced centrally in the piles.

Nedan beskrivs uppfinningen närmare i anslutning till ett par utförings~ former samt bifogade ritning, där - fig. 1 visar ett vertikalt snitt genom en vägg med en första utförings- form av en anordning enl. uppfinningen samt - fig. 2 på motsvarande sätt visar en del av en andra utföringsform av en anordning enl. uppfinningen.The invention is described in more detail below in connection with a pair of embodiments and the accompanying drawing, in which - Fig. 1 shows a vertical section through a wall with a first embodiment of a device according to the invention and - Fig. 2 correspondingly shows a part of a second embodiment of a device according to the invention.

Enl. uppfinningen förefinns par 1,1 av varandra motstående pålar 1 anord- nade i anslutning till väggen 2 hos byggnaden, d.v.s. mitt emot varandra på båda sidor om väggen.According to. According to the invention, there are pairs 1,1 of opposite piles 1 arranged in connection with the wall 2 of the building, i.e. opposite each other on both sides of the wall.

I väggen 2 i anslutning till nämnda par 1,1 förefinns snedställda hål 3 borrade antingen snett nedåt, såsom i fig. 1 eller snett uppåt i riktning från pålarnas 1 topp 7. l varje hål 3 förefinns en stålstång '-1 införd och fastinjekterad, vilka stänger Ä är förbundna med var sin påles 1 topp 7, varvid förankring i påltoppen 7 sker med en stålplatta, balk eller liknan- de.In the wall 2 in connection with said pair 1,1 there are inclined holes 3 drilled either obliquely downwards, as in Fig. 1 or obliquely upwards in the direction from the top 7 of the piles 1. In each hole 3 there is a steel rod -1 inserted and fixedly injected, which rods Ä are connected to the top 7 of each pile 1, whereby anchoring in the pile top 7 takes place with a steel plate, beam or the like.

Mellan pålarnas 1,1 topp 7 förefinns ett hål 5 borrat genom väggen 2, i vilket en stålstång 8 förefinns införd och fastinjekterad, vilken är för- ankrad i pålarnas topp 7. 1 fig. 2 visas en utföringsform, där stängerna Å är försedda med en för- ankringsplatta 6 i stängernas nedre ände.Between the top 7 of the piles 1,1 there is a hole 5 drilled through the wall 2, in which a steel rod 8 is inserted and fixedly injected, which is anchored in the top 7 of the piles. Fig. 2 shows an embodiment in which the rods Å are provided with an anchoring plate 6 in the lower end of the rods.

Funktionen hos anordningen enl. uppfinningen samt förfarandet torde till väsentlig del framgått ovan. Belastningen från byggnaden överförs således till pålarna 1 medelst stängerna Å,8. De horisontella krafter, av vilka pålarna påverkas via de snedställda stängerna Å upptages av stången 8, varigenom belastningen Q från väggen 2 kan införas centriskt i pålarna 1.The function of the device according to the invention and the method should be substantially stated above. The load from the building is thus transferred to the piles 1 by means of the bars Å, 8. The horizontal forces, of which the piles are actuated via the inclined rods Å, are absorbed by the rod 8, whereby the load Q from the wall 2 can be introduced centrally in the piles 1.

Härvid är stängerna förankrade i pålarnas topp 7 så att detta möjliggörs.In this case, the rods are anchored in the top 7 of the piles so that this is possible.

Genom att spänna stålstängerna med domkrafter kan belastningen från bygg- naden påföras pålarna utan att sättningar hos byggnaden behöver ske. Ge- nom sådan förspänning kan även provbelastning av pålarna ske. &0O6375 -3 Ovan har ett par utföringsformer av uppfinningen beskrivits. Naturligtvis kan fler utföringsformer och mindre förändringar tänkas utan att uppfin- ningstanken därför frångås. Enl. de här visade utföringsformerna korsar således stängerna Å varandra i väggen 2. Vidare är enl. vad som här visas vinklarna C§(1,(§(2, som utbildas mellan stången 8 och resp. snedställd stång Ä olika. Vidare är enl. utföringsexemplet stången 8 ej horisontell, d.v.s. påltopparna 7 ligger på olika nivå.By tensioning the steel bars with jacks, the load from the building can be applied to the piles without settling of the building. Through such bias, test loads of the piles can also take place. A couple of embodiments of the invention have been described above. Of course, more embodiments and minor changes are conceivable without departing from the inventive concept. According to. the embodiments shown here thus cross the rods Å each other in the wall 2. Furthermore, acc. what is shown here are the angles C§ (1, (§ (2), which are formed between the rod 8 and the respective inclined rod Ä are different. Furthermore, according to the exemplary embodiment, the rod 8 is not horizontal, i.e. the pile tops 7 are at different levels.

Uppfinningen skall ej anses begränsad till ovan angivna utföringsformer, utan kan varieras inom dess av bifogade patentkrav angivna ram.The invention is not to be construed as limited to the embodiments set forth above, but may be varied within the scope of the appended claims.

Claims (8)

1. 8006375-3 Patentkrav Förfarande för grundförstärkning av befintliga byggnadsverk, där par av varandra motstående pålar anordnas i anslutning till en befintlig vägg, varefter belastning överförs från byggnaden till pålarna, där snedstälida hål borras i väggen och där en stålstång införs och in-V jekteras fast i varje hål samt där förbindning sker mellan pâlar och stänger, k ä n n e t e c k'n a t a v, att en stång (M) anordnas i an- slutning till varje påle (l) i ett företrädesvis icke genomgående, sned- ställt hål (3) på i och för sig väsentligen känt sätt samt separat för- binds med toppen (7) hos påien (1) i anslutning till vilken stången (H) är anordnad, samt av, att mellan topparna (7) hos varje par (1,1) av pålar (I) borras ett hål (5), i vilket en stålstång (8) införs och in- jekteras fast samt förankras i pålarnas (1,1) topp (7), varvid horison- tella krafter, av vilka pålarna (l) påverkas vid de snedställda stängerna (M), upptages av stången (8) och varvid belastningen (Q) från väggen (2) kan införas centriskt i pålarna (l). I8006375-3 Claims claim Procedure for basic reinforcement of existing structures, where pairs of opposing piles are arranged adjacent to an existing wall, after which load is transferred from the building to the piles, where inclined holes are drilled in the wall and where a steel bar is inserted and in-V is fixed in each hole and where connection is made between piles and rods, it is known that a rod (M) is arranged next to each pile (1) in a preferably non-continuous, inclined hole ( 3) in a manner known per se and connected separately to the top (7) of the pad (1) in connection with which the rod (H) is arranged, and by the fact that between the tops (7) of each pair (1 , 1) of piles (I) a hole (5) is drilled, in which a steel bar (8) is inserted and injected firmly and anchored in the top (7) of the piles (1,1), horizontal forces, of which the piles (1) are actuated at the inclined bars (M), are taken up by the bar (8) and the load (Q) fr than the wall (2) can be inserted centrally in the piles (1). IN 2. Förfarandeeni. krav l, k ä n n e t e c k n a t a v, att de vink- lar (0ß1.çL2), som utbildas mellan den mellan påltopparna (7) löpande stången (8) och resp. snedställd stång (b) är olika.2. Procedure. claim 1, characterized in that the angles (0ß1.çL2) formed between the rod (8) running between the pile tops (7) and resp. oblique rod (b) are different. 3. Förfarande enl. krav i eller 2, k ä n n e t e c k n a t a v, att de snedställda stängerna (N) förspänns så att belastningen (Q) från väg- gen kan påföras påiarna utan risk för sättningar. 0. förfarande enl. krav i, 2 eller 3, där nämnda snedställda hål bor- ras snett nedåt i väggen, k ä n n e t e c k n a t a v, att de snedställda stängerna (0) förses med en stålplatta (6), vilken förankras i stängernas3. Procedure acc. requirement i or 2, characterized in that the inclined rods (N) are prestressed so that the load (Q) from the wall can be applied to the beams without risk of settling. 0. procedure according to claim 2, 2 or 3, wherein said inclined holes are drilled obliquely downwards in the wall, characterized in that the inclined rods (0) are provided with a steel plate (6), which is anchored in the rods. 4. (N) nedre ände. i4. (N) lower end. in 5. Anordning vid grundförstärkning av befintliga byggnadsverk, där par av-varandra motstående pålar förefinns anordnade i anslutning till en befintlig vägg. till vilka belastning från byggnaden är avsedd att överföras och där snedställda hål förefinns borrade i väggen och där en stålstång förefinns införd och fastinjekterad i varje hål sant där förbind- ning är avsedd att förefinnas mellan pålar och stänger, k ä n n e t e c k - n a d a v, att en stång (N) förefinns anordnad i anslutning till varje påle (1) l ett företrädesvis icke genomgående, snedställt hål (3) på i och ^ för sig väsentligen känt sätt samt separat förbundenmed toppen (7) hos pålen (I), i s sooaávs-3 anslutning till vilken stången (Ä) är anordnad, samt av, att mellan topparna (7) hos varje par (l,i) av pålar (1) förefinns ett hål (S) borrat, i vilket en stålstång (8) föreflnns införd och fastinjekterad samt förankrad i pålarnas (l,l) topp (7), varigenom horisontella kraf- ter, av vilka pålarna påverkas via de snedställda stängerna (H) kan upp- tagas av stången (8) och varigenom belastningen ( Q) från väggen kan införas eentriskt l pålarna (I).Device for basic reinforcement of existing structures, where pairs of opposing piles are arranged in connection with an existing wall. to which load from the building is intended to be transferred and where inclined holes are drilled in the wall and where a steel rod is inserted and fixedly injected into each hole true where connection is intended to be present between piles and rods, characterized in that a rod (N) is arranged in connection with each pile (1) in a preferably non-through, oblique hole (3) in a manner known per se and separately connected to the top (7) of the pile (I), so-called 3 connection to which the rod (Ä) is arranged, and by the fact that between the tops (7) of each pair (1, i) of piles (1) there is a hole (S) drilled, in which a steel rod (8) is inserted and fixedly injected and anchored in the top (7) of the piles (1, 1), whereby horizontal forces, of which the piles are actuated via the inclined rods (H) can be absorbed by the rod (8) and whereby the load (Q) from the wall can be inserted uniformly into the piles (I). 6. Anordning enl. krav 5, k ä n n e t e c k n a d a v, att de vink- lar (¿K,l, 0L2l, som förefinns utbildade mellan den mellan påltopparna (7) löpande stången (8) och resp. snedställd stång (H), är olika.6. Device according to claim 5, characterized in that the angles (¿K, l, 0L2l, which are formed between the rod (8) running between the pile tops (7) and the respective inclined rod (H), are different. 7. Anordning enl. krav 5 eller 6, där nämnda snedställda hål är bor- rade snett nedåt i väggen, k ä n n e t e c k n a d a v, att de sned- ställda stängerna (N) är försedda med en stålplatta (6), vilken forank- ras i stängernas (M) nedre ände.7. Device according to claim 5 or 6, wherein said inclined holes are drilled obliquely downwards in the wall, characterized in that the inclined rods (N) are provided with a steel plate (6), which is anchored in the lower of the rods (M) End. 8. _Anordnlng enl. krav S, 6 eller 7, k ä n n e t e e k n a d a v, att de snedställda stängerna (H) korsar varandra i väggen (2).8. _Anordnlng enl. claim S, 6 or 7, characterized in that the inclined rods (H) cross each other in the wall (2).
SE8006375A 1980-09-11 1980-09-11 PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE SE436772C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SE8006375A SE436772C (en) 1980-09-11 1980-09-11 PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE8006375A SE436772C (en) 1980-09-11 1980-09-11 PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE

Publications (3)

Publication Number Publication Date
SE8006375L SE8006375L (en) 1982-03-12
SE436772B SE436772B (en) 1985-01-21
SE436772C true SE436772C (en) 1986-05-26

Family

ID=20341711

Family Applications (1)

Application Number Title Priority Date Filing Date
SE8006375A SE436772C (en) 1980-09-11 1980-09-11 PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE

Country Status (1)

Country Link
SE (1) SE436772C (en)

Also Published As

Publication number Publication date
SE8006375L (en) 1982-03-12
SE436772B (en) 1985-01-21

Similar Documents

Publication Publication Date Title
CN109056548B (en) Steel arch construction method
US8695142B2 (en) Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same
CN112726409B (en) Hoisting device for bridge water surface pile tie beam and construction method thereof
KR20120117364A (en) Pier bracket supporting main girder used in movable scaffolding system
CN108999085B (en) Construction support and construction method for sea area cast-in-place box girder
CN110018045B (en) Counterforce device for pier stud pseudo-static test
CN105568870A (en) Triangle hanging basket suspended casting device used for overpass bridge construction and construction method thereof
SE416417B (en) BACKGROUND BASE FOR STEEL CONCRETE CONSTRUCTIONS
US4866803A (en) Bridge structure with inclined towers
SE436772C (en) PROCEDURE FOR BASIC REINFORCEMENT OF EXISTING CONSTRUCTION WORKS AND DEVELOPMENT PROCEDURE
CN203238950U (en) Concrete beam formwork supported by trusses suspended in air
WO2006118528A1 (en) Method for production of a floor structure of steel and concrete
CN111877127B (en) Construction method of continuous arch bridge
JP2010281034A (en) Structure for reinforcing masonry wall, and masonry structure
US4319374A (en) Method of constructing a stayed girder bridge
CN106703388A (en) Construction scaffold platform erected in super-high-layer building elevator shaft
CN108374323B (en) Cable tower bundling anchoring structure for arch-supporting cable-stayed bridge
CN108060781B (en) Multi-beam connecting structure and hoisting construction method thereof
CN220927918U (en) Assembled pier cap anchor structure
US1938491A (en) Structural units for steel frame buildings and the like
CN103321449A (en) Processing method of building story adding through frame structure
SU912895A1 (en) Metal earthquake-proof framework of multistorey building
US2410778A (en) Construction of piers
CN216973082U (en) Novel assembled bridge structure
CN210766841U (en) Underground pile foundation structure

Legal Events

Date Code Title Description
NUG Patent has lapsed

Ref document number: 8006375-3

Effective date: 19900703

Format of ref document f/p: F