RU98724U1 - CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS) - Google Patents

CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS) Download PDF

Info

Publication number
RU98724U1
RU98724U1 RU2010115919/11U RU2010115919U RU98724U1 RU 98724 U1 RU98724 U1 RU 98724U1 RU 2010115919/11 U RU2010115919/11 U RU 2010115919/11U RU 2010115919 U RU2010115919 U RU 2010115919U RU 98724 U1 RU98724 U1 RU 98724U1
Authority
RU
Russia
Prior art keywords
automated
monitored devices
devices
duty
malfunctions
Prior art date
Application number
RU2010115919/11U
Other languages
Russian (ru)
Inventor
Андрей Иванович Даньшин
Владимир Ромазович Одикадзе
Дмитрий Владимирович Родионов
Владислав Николаевич Соколов
Александр Николаевич Шабельников
Original Assignee
Открытое Акционерное Общество "Научно-Исследовательский И Проектно-Конструкторский Институт Информатизации, Автоматизации И Связи На Железнодорожном Транспорте"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Научно-Исследовательский И Проектно-Конструкторский Институт Информатизации, Автоматизации И Связи На Железнодорожном Транспорте" filed Critical Открытое Акционерное Общество "Научно-Исследовательский И Проектно-Конструкторский Институт Информатизации, Автоматизации И Связи На Железнодорожном Транспорте"
Priority to RU2010115919/11U priority Critical patent/RU98724U1/en
Application granted granted Critical
Publication of RU98724U1 publication Critical patent/RU98724U1/en

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

Контрольно-диагностический комплекс станционных устройств горочной автоматической централизации, содержащий модули ввода аналоговых и дискретных сигналов от контролируемых устройств, модуль контроля сопротивления изоляции, связанный с контролируемыми устройствами, удаленные автоматизированные рабочие места и объединенные локальной вычислительной сетью Ethernet шлюз, сервер баз данных и контроллер сбора информации на базе промышленного компьютера, который связан с модулем контроля сопротивления изоляции, модулями ввода аналоговых и дискретных сигналов и с сервером баз данных, связанным с автоматизированной системой управления сортировочным процессом, со шлюзом локальной вычислительной сети и автоматизированным рабочим местом дежурного электромеханика, отличающийся тем, что дополнительно содержит модуль мониторинга состояния и обнаружения неисправностей оборудования, связанный с контроллером сбора информации с автоматизированным рабочим местом дежурного электромеханика и с автоматизированной системой управления сортировочным процессом и предназначенный для сбора информации о сбоях в работе контролируемых устройств в режиме реального времени, и горочное табло коллективного пользования, связанное с модулем мониторинга состояния и обнаружения неисправностей оборудования, выполненное с возможностью визуального, голосового и звукового оповещения о сбое в работе контролируемых устройств, а шлюз локальной вычислительной сети и удаленные автоматизированные места связаны с корпоративной сетью передачи данных, обеспечивая отображение диагностической и статистической информации о работе о� The control and diagnostic complex of station devices for automatic automatic centralization, containing modules for inputting analog and discrete signals from monitored devices, an insulation resistance control module associated with monitored devices, remote workstations and an Ethernet gateway, a database server and an information collection controller connected by a local area network based on an industrial computer that is connected to an insulation resistance control module, analog input modules, and discrete signals and with a database server associated with an automated sorting process control system, with a local area network gateway and an electrician on duty duty station, characterized in that it further comprises a state monitoring and equipment failure detection module associated with an information collection controller with an automated worker the place of the on-duty electrician and with an automated sorting process control system and designed for To collect information about malfunctions in the operation of monitored devices in real time, and a collective display panel connected with the module for monitoring the status and detection of equipment malfunctions, made with the possibility of visual, voice and sound alerts about malfunctions of monitored devices, and a local computing gateway networks and remote automated locations are connected to the corporate data network, providing the display of diagnostic and statistical information about the work of

Description

Устройство относится к железнодорожному транспорту, а именно к устройствам автоматики и телемеханики, обеспечивающим контроль и диагностику состояния технических средств на сортировочных горках.The device relates to railway transport, and in particular to automation and telemechanics devices, providing control and diagnostics of the state of technical equipment on sorting slides.

Известен Контрольно-диагностический комплекс (КДК), являющийся подсистемой КГМ-ПК (А.Н.Шабельников, И.Г.Сапков Контрольно-диагностический комплекс автоматизированной сортировочной горки.- «Автоматика, связь, информатика», 2002, №4, с.8-12). Контрольно-диагностический комплекс отображает ход технологического процесса, отображает результаты диагностики напольных устройств, подключенных к КГМ ПК на основе логического анализа их работы, отображает протокол хода роспуска составов и действия оперативного персонала.Known Control and Diagnostic Complex (CDC), which is a subsystem of the KGM-PC (A.N.Shabelnikov, I.G. Sapkov, Control and Diagnostic Complex of an automated sorting slide. - "Automation, Communications, Informatics", 2002, No. 4, p. 8-12). The control and diagnostic complex displays the process flow, displays the diagnostic results of floor-mounted devices connected to the KGM PC based on the logical analysis of their operation, displays the protocol of the dissolution progress of the trains and the actions of operational personnel.

Недостатком данного КДК является отсутствие контроля электрических параметров в цепях электропитания, напряжений и токов сигналов исполнительных и контрольных устройств СЦБ, что не позволяет проводить техническое обслуживание и фиксировать предотказное состояние устройств СЦБ.The disadvantage of this KDK is the lack of control of electrical parameters in the power supply circuits, voltages and signal currents of signaling and control devices of signaling systems, which does not allow for maintenance and fixing the precautionary state of signaling devices.

Известен комплекс АДК-СЦБ (А.Н.Беляков, С.П.Комаров Комплекс диагностирования и контроля устройств СЦБ. - «Автоматика, связь, информатика», 2003, №12, с.28-30). Он осуществляет контроль, анализ состояния, предотказную диагностику устройств СЦБ, кратковременное архивирование информации, автоматизацию техобслуживания, поиск неисправностей устройств посредством децентрализовано размещенных модулей дистанционного съема сигналов.The well-known ADK-signaling system complex (A.N. Belyakov, S.P. Komarov Diagnostic and monitoring system for signaling and signaling devices. - “Automation, communication, computer science”, 2003, No. 12, p. 28-30). It carries out monitoring, state analysis, pre-failure diagnostics of signaling devices, short-term archiving of information, automation of maintenance, troubleshooting of devices through decentralized remote sensing modules.

Недостатком АДК-СЦБ является то, что он ориентирован только на контроль сигналов устройств, расположенных на значительном расстоянии от центрального блока связи и промышленного компьютера информационно-вычислительного комплекса (ИВК) с использованием информационных последовательных каналов связи модулей дистанционного съема сигналов (ДСС) с центральным блоком связи (ЦБС). Это ограничивает быстродействие АДК-СЦБ (не более 20 раз в секунду) и не позволяет выполнять осциллографирование сигналов и снятие точных эпюр быстро изменяющихся сигналов (до 3125 раз в секунду), что необходимо для своевременного выявления скрытых неисправностей и предотказной диагностики устройств СЦБ станций и сортировочных горок (СГ). Кроме того, АДК-СЦБ не обеспечивает измерение сопротивления изоляции и определение неисправных цепей электропитания. А отсутствие сервера баз данных не дает возможности накопления и долговременного хранения диагностической информации, что не позволяет производить статистический анализ работы контролируемых устройств.The disadvantage of ADK-signaling is that it is focused only on monitoring the signals of devices located at a considerable distance from the central communication unit and the industrial computer of the information and computer complex (IVK) using information serial communication channels of the remote signal pick-up modules (LSS) with the central unit communication (CBS). This limits the speed of the ADK-signaling system (no more than 20 times per second) and does not allow oscilloscopy of signals and the taking of exact diagrams of rapidly changing signals (up to 3125 times per second), which is necessary for the timely detection of hidden malfunctions and the precautionary diagnosis of signaling devices of stations and sorting stations hills (SG). In addition, ADK-STsB does not provide measurement of insulation resistance and identification of faulty power supply circuits. And the lack of a database server does not allow the accumulation and long-term storage of diagnostic information, which does not allow a statistical analysis of the operation of controlled devices.

Наиболее близким является устройство «Контрольно-диагностический комплекс станционных устройств горочной автоматической централизации» (патент №56308, B61L 17/00), в котором электрические цепи контролируемых устройств подключаются сигнальным кабелем непосредственно к промышленному компьютеру ИВК, что дает возможность снимать сигналы с большой частотой, ограничиваемой только возможностями устройств АЦП, модуль контроля сопротивления изоляции позволяет определить неисправности цепей питания, а сервер баз данных обеспечивает информацией о работоспособности контролируемых устройств за длительный промежуток времени (до нескольких лет).The closest is the device “Control and diagnostic complex of station devices of automatic automatic centralization” (patent No. 56308, B61L 17/00), in which the electrical circuits of the monitored devices are connected by a signal cable directly to the industrial computer of the IVK, which makes it possible to record signals with high frequency, limited only by the capabilities of the ADC devices, the insulation resistance control module allows you to determine the failure of the power supply circuit, and the database server provides information on the performance of controlled devices for a long period of time (up to several years).

Недостатком этого устройства является то, что оно предназначено для анализа собранной информации на основании произошедших событий и не имеет в своем составе модуля выявления опасных отказов оборудования в режиме реального времени, а также не имеет средств оперативного оповещения эксплуатационного персонала о выявленных отказах, например, оператора сортировочной горки, который имел бы возможность вовремя вмешаться в работу автоматизированной системы и предотвратить аварийные ситуации.The disadvantage of this device is that it is designed to analyze the information collected on the basis of the events and does not include a module for detecting dangerous equipment failures in real time, and also does not have the means of prompt notification of operational personnel about detected failures, for example, a sorting operator slides, which would be able to intervene in time in the operation of the automated system and prevent emergency situations.

Сущность полезной модели заключается в том, что контрольно-диагностический комплекс станционных устройств горочной автоматической централизации, содержащий модули ввода аналоговых и дискретных сигналов от контролируемых устройств, модуль контроля сопротивления изоляции, удаленные автоматизированные рабочие места и связанные через локальную вычислительную сеть Ethernet шлюз, сервер баз данных, контроллер сбора информации на базе промышленного компьютера и автоматизированное рабочее место дежурного электромеханика дополнительно содержит модуль мониторинга состояния и обнаружения неисправностей оборудования, связанный с контроллером сбора информации и автоматизированной системой управления сортировочным процессом и предназначенный для сбора информации о сбоях в работе контролируемых устройств в режиме реального времени и горочное табло коллективного пользования, выполненное с возможностью визуального, голосового и звукового оповещения о сбое в работе контролируемых устройств, а шлюз локальной вычислительной сети и удаленные автоматизированные места связаны с корпоративной сетью передачи данных ОАО «РЖД», обеспечивая отображение диагностической и статистической информации о работе оборудования в системах технического мониторинга и диагностики верхнего уровня.The essence of the utility model lies in the fact that the control and diagnostic complex of station devices for automatic automatic centralization contains modules for inputting analog and discrete signals from monitored devices, an insulation resistance control module, remote workstations and Ethernet gateway connected via a local area network, a database server , a controller for collecting information on the basis of an industrial computer and an automated workstation of an electrician on duty A module for monitoring the status and detection of equipment malfunctions is connected with the information collection controller and the automated sorting process control system and designed to collect information about malfunctions in the operation of controlled devices in real time and a collective display panel made with the possibility of visual, voice and sound alerts a malfunction of the controlled devices, and the local area network gateway and remote automated locations are connected with a corporate data network of Russian Railways, providing the display of diagnostic and statistical information on the operation of equipment in technical monitoring and top-level diagnostic systems.

Техническим результатом является своевременное диагностирование и уведомление оперативно-диспетчерского персонала сортировочной горки о выявленных отказах оборудования для предотвращения аварийных ситуаций во время роспуска составов и при проведении маневровых перестановок.The technical result is the timely diagnosis and notification of operational and dispatching personnel of the sorting hill about identified equipment failures to prevent emergency situations during the dissolution of trains and during shunting shifts.

Технический результат достигается тем, что предлагаемое устройство имеет в своем составе модуль мониторинга состояния и обнаружения неисправностей оборудования, который во время обработки сообщений о состоянии оборудования, поступающих от контроллера сбора информации и автоматизированных систем управления сортировочным процессом, выявляет опасные отказы устройств и сообщает о них в режиме реального времени оперативно-диспетчерскому персоналу СГ различными, дублирующими друг друга способами: звуковой сигнализацией, голосовым сообщением и отображением на горочном табло коллективного пользования, расположенном на посту управления СГ, на основании чего предпринимаются необходимые действия по предотвращению аварийных ситуаций в соответствии с инструкциями по эксплуатации.The technical result is achieved by the fact that the proposed device incorporates a module for monitoring the status and detection of equipment malfunctions, which, during processing of messages about the state of equipment received from the information collection controller and automated sorting process control systems, detects dangerous device failures and reports them to real-time to the operational dispatch personnel of the SG in various duplicating ways: sound alarms, voice messages reporting and displaying on the hump panel for collective use, located at the control post of the SG, on the basis of which the necessary actions are taken to prevent emergency situations in accordance with the operating instructions.

Конструктивно устройство выполнено в виде блоков, расположенных в ИВК на посту ЭЦ, горочного табло коллективного пользования, расположенного в помещении дежурного по горке в месте, визуально доступном для всех горочных операторов, а удаленные АРМы, в их числе может быть АРМ администратора дистанции, АРМ диспетчера дистанции и другие могут располагаться на соответствующих рабочих местах.Structurally, the device is made in the form of blocks located in the IVK at the EC station, a collective ledge located in the duty room on the hill in a place that is visually accessible to all hill operators, and remote AWPs, including remote administrator’s AWP, dispatcher’s AWP distances and others may be located at appropriate workplaces.

На фиг.1 представлена структурная схема Контрольно-диагностического комплекса станционных устройств горочной автоматической централизации (КДК СУ ГАЦ).Figure 1 presents the structural diagram of the Control and diagnostic complex of station devices of automatic automatic centralization (KDK SU GAC).

Предложенное устройство содержит модули ввода дискретных сигналов 1, модули ввода аналоговых сигналов 2, модуль измерения сопротивления изоляции 3, входы которых соединены сигнальным кабелем 4 с контролируемыми устройствами 5, а выходы подключены к контроллеру сбора информации на базе промышленного компьютера 6, выход которого по локальной сети Ethernet соединен с сервером баз данных 7, который по локальной сети соединен с автоматизированной системой управления сортировочным процессом 9, автоматизированным рабочим местом дежурного электромеханика 8 и шлюзом локальной вычислительной сети 12, соединенным через корпоративную сеть передачи данных ОАО «РЖД» 13 с удаленными рабочими местами 14 и системами технической диагностики и мониторинга верхнего уровня, модуль мониторинга состояния и обнаружения неисправностей оборудования 10, вход которого соединен с АСУ СС 9, другой вход соединен с выходом модуля КСИ 6, а выходы соединены с АРМ ШН СГ 8 и ГТКП 11, расположенным в помещении дежурного по горке.The proposed device contains input modules for discrete signals 1, input modules for analog signals 2, a module for measuring insulation resistance 3, the inputs of which are connected by a signal cable 4 to controlled devices 5, and the outputs are connected to a data acquisition controller based on an industrial computer 6, the output of which is via a local area network Ethernet is connected to the database server 7, which is connected via a local area network to the automated sorting process control system 9, the automated workstation of the standby electric Chanika 8 and a local area network gateway 12 connected via a corporate data network of Russian Railways 13 to remote workstations 14 and top-level technical diagnostics and monitoring systems, a status monitoring and fault detection module 10, the input of which is connected to ACS SS 9 , the other input is connected to the output of the KSI 6 module, and the outputs are connected to the AWS SHN SG 8 and GTKP 11 located in the duty room on the hill.

Устройство работает следующим образом.The device operates as follows.

После включения электропитания промышленный компьютер контроллера сбора информации 6 загружает с flash-диска операционную систему и автоматически запускает технологическую программу. После этого комплекс готов к работе.After turning on the power, the industrial computer of the information collection controller 6 loads the operating system from the flash-disk and automatically starts the technological program. After that, the complex is ready for work.

Дискретные сигналы контролируемых устройств поступают через модули 1 в контроллер сбора информации 6, в котором осуществляется фиксация срабатывания и диагностика исполнительных устройств.Discrete signals of controlled devices are transmitted through modules 1 to the information collection controller 6, in which the actuation is fixed and the actuators are diagnosed.

Сигналы контролируемых устройств 5 поступают посредством сигнального кабеля 4 к контроллеру сбора информации 6.The signals of the monitored devices 5 come through a signal cable 4 to the controller of the collection of information 6.

Уровни аналоговых сигналов поступают через модули 2 в контроллер сбора информации 6, в котором осуществляется измерение напряжений и токов, контроль значений сигналов, анализ состояния устройств, фиксация сбоев и отказов, предотказная диагностика. При необходимости, электромеханик с АРМ 8 имеет возможность вывести на экран АРМа осциллограммы сигналов нескольких устройств, технологически связанных друг с другом, для более точного определения характера неисправности. КДК СУ ГАЦ отображает осциллограммы, осуществляя 1600 измерений в секунду по каждому из контролируемых каналов. При необходимости визуального контроля очень скоротечных сигналов, осуществляется 3125 измерений в секунду по каждому из контролируемых каналов.The levels of analog signals are fed through modules 2 to the information collection controller 6, which measures voltages and currents, monitors signal values, analyzes the status of devices, fixes failures and failures, and performs precautionary diagnostics. If necessary, an electrician with AWP 8 has the ability to display waveforms of signals from several devices technologically connected with each other on the AWP screen to more accurately determine the nature of the malfunction. KDK SU GAC displays waveforms, performing 1600 measurements per second for each of the monitored channels. If necessary, visual control of very transient signals is carried out 3125 measurements per second for each of the monitored channels.

В процессе работы комплекса осуществляется измерение, математическая и логическая обработка сигналов, контроль и анализ состояния и уровней сигналов, отображение на АРМ электромеханика 8 состояния контролируемых устройств, формирование сигналов оповещения персонала при фиксации предотказного состояния и отказа устройств. Модуль мониторинга состояния и обнаружения неисправностей оборудования 10, обрабатывает сообщения о состоянии оборудования, поступающие от контроллера сбора информации 6 и автоматизированной системы управления сортировочным процессом 9, выявляет опасные отказы устройств и сообщает о них в режиме реального времени оперативно-диспетчерскому персоналу сортировочной горки путем отображения на горочном табло коллективного пользования 11, расположенном на посту управления СГ, звуковой сигнализацией и голосовыми сообщениями, на основании которых операторы предпринимают необходимые действия по предотвращению аварийных ситуаций в соответствии с инструкциями по эксплуатации.In the process of the complex’s operation, measurement, mathematical and logical processing of signals, monitoring and analysis of the state and signal levels, mapping of the status of monitored devices to the automated mechanic 8 on the automated workplace of the electromechanics, the formation of personnel alert signals when fixing the pre-failure condition and device failure are performed. The module for monitoring the status and detection of equipment malfunctions 10, processes messages on the state of equipment received from the information collection controller 6 and the automated sorting process control system 9, detects dangerous device failures and reports them in real time to the operational dispatch personnel of the sorting hill by displaying on collective hiding panel 11, located at the control post of the SG, sound alarms and voice messages, based on Otori operators take the necessary action to prevent emergency situations in accordance with the instructions for use.

Модуль контроля сопротивления изоляции 3 обеспечивает измерение сопротивления изоляции и определение неисправных цепей электропитания. По командам от контроллера сбора информации 6 модуль 3 подключает к измерительному каналу контроллера сбора информации 6 поочередно электрические цепи всех контролируемых источников электропитания. Контроллер сбора информации 6 измеряет ток утечки и анализирует его величину. В аварийных случаях контроллер сбора информации 6 фиксирует цепи с неисправной изоляцией и оповещает персонал через АРМ 8, АРМ 14 и ГТКП 11. Результаты измерений отображаются в АРМ 8 и 14 при вызове соответствующего меню программы.The insulation resistance control module 3 provides measurement of insulation resistance and identification of faulty power supply circuits. By commands from the information collection controller 6, module 3 connects to the measuring channel of the information collection controller 6 alternately the electrical circuits of all monitored power sources. The information collection controller 6 measures the leakage current and analyzes its magnitude. In emergency cases, the information collection controller 6 fixes the circuits with faulty isolation and notifies personnel through AWP 8, AWP 14 and GTKP 11. Measurement results are displayed in AWP 8 and 14 when the corresponding program menu is called up.

Сервер баз данных позволяет осуществлять накопление и долговременное хранение всей диагностической информации с последующим просмотром и анализом работы всех контролируемых устройств с помощью АРМ ШН.The database server allows the accumulation and long-term storage of all diagnostic information, followed by viewing and analyzing the operation of all monitored devices using AW workstation.

Вся диагностическая информация как в реальном времени с контроллера сбора информации 6, так и за длительный период с сервера баз данных 7 может быть передана на один или несколько АРМов ДК ШН, подключенных к корпоративной сети передачи данных ОАО «РЖД» 13 для обеспечения возможности передачи информации в АСУ хозяйства СЦБ (АСУ Ш), функционирующей на уровне железных дорог страны, при этом шлюз ЛВС 12 выполняет функции информационной защиты локальной вычислительной сети КДК СУ ГАЦ.All diagnostic information both in real time from the information collection controller 6, and over a long period of time from the database server 7 can be transferred to one or several DK SHN workstations connected to the corporate data network of Russian Railways 13 to ensure the possibility of information transfer in the automated control system of the central locking system (ACS Ш), operating at the level of the country's railways, while the LAN gateway 12 performs the functions of information protection of the local computer network of the KDK SU GAC.

1 - модули ввода дискретных сигналов1 - input modules of discrete signals

2 - модули ввода аналоговых сигналов2 - analog input modules

3 - модуль контроля сопротивления изоляции3 - insulation resistance control module

4 - сигнальный кабель4 - signal cable

5 - контролируемые устройства5 - controlled devices

6 - контроллер сбора информации6 - information collection controller

7 - сервер баз данных7 - database server

8 - автоматизированное рабочее место дежурного электромеханика8 - an automated workplace of an electrician on duty

9 - автоматизированная система управления сортировочным процессом9 - automated sorting process control system

10 - модуль мониторинга состояния и обнаружения неисправностей оборудования10 - module monitoring the status and detection of equipment malfunctions

11 - горочное табло коллективного пользования11 - hump panel for collective use

12 - шлюз локальной вычислительной сети12 - gateway of the local area network

13 - корпоративная сеть передачи данных ОАО «РЖД»13 - corporate data transmission network of JSC Russian Railways

14 - удаленные автоматизированные рабочие места14 - remote workstations

Claims (1)

Контрольно-диагностический комплекс станционных устройств горочной автоматической централизации, содержащий модули ввода аналоговых и дискретных сигналов от контролируемых устройств, модуль контроля сопротивления изоляции, связанный с контролируемыми устройствами, удаленные автоматизированные рабочие места и объединенные локальной вычислительной сетью Ethernet шлюз, сервер баз данных и контроллер сбора информации на базе промышленного компьютера, который связан с модулем контроля сопротивления изоляции, модулями ввода аналоговых и дискретных сигналов и с сервером баз данных, связанным с автоматизированной системой управления сортировочным процессом, со шлюзом локальной вычислительной сети и автоматизированным рабочим местом дежурного электромеханика, отличающийся тем, что дополнительно содержит модуль мониторинга состояния и обнаружения неисправностей оборудования, связанный с контроллером сбора информации с автоматизированным рабочим местом дежурного электромеханика и с автоматизированной системой управления сортировочным процессом и предназначенный для сбора информации о сбоях в работе контролируемых устройств в режиме реального времени, и горочное табло коллективного пользования, связанное с модулем мониторинга состояния и обнаружения неисправностей оборудования, выполненное с возможностью визуального, голосового и звукового оповещения о сбое в работе контролируемых устройств, а шлюз локальной вычислительной сети и удаленные автоматизированные места связаны с корпоративной сетью передачи данных, обеспечивая отображение диагностической и статистической информации о работе оборудования в системах технического мониторинга и диагностики верхнего уровня.
Figure 00000001
The control and diagnostic complex of station devices for automatic hiding centralization, containing modules for inputting analog and discrete signals from monitored devices, an insulation resistance control module associated with the monitored devices, remote workstations and an Ethernet gateway, a database server and an information collection controller connected by a local area network based on an industrial computer, which is connected to the insulation resistance control module, analog input modules and discrete signals and with a database server associated with an automated sorting process control system, with a local area network gateway and an electrician on duty duty station, characterized in that it further comprises a state monitoring and equipment failure detection module associated with an information collection controller with an automated worker the place of the on-duty electrician and with an automated sorting process control system and designed for To collect information about malfunctions in the operation of monitored devices in real time, and a collective display panel connected with the module for monitoring the status and detection of equipment malfunctions, made with the possibility of visual, voice and sound notification of a malfunction of the monitored devices, and a local computing gateway networks and remote automated locations are connected to the corporate data network, providing the display of diagnostic and statistical information about the operation of equipment in systems of technical monitoring and diagnostics of the upper level.
Figure 00000001
RU2010115919/11U 2010-04-21 2010-04-21 CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS) RU98724U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010115919/11U RU98724U1 (en) 2010-04-21 2010-04-21 CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010115919/11U RU98724U1 (en) 2010-04-21 2010-04-21 CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS)

Publications (1)

Publication Number Publication Date
RU98724U1 true RU98724U1 (en) 2010-10-27

Family

ID=44042475

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010115919/11U RU98724U1 (en) 2010-04-21 2010-04-21 CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS)

Country Status (1)

Country Link
RU (1) RU98724U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110208625A (en) * 2019-06-19 2019-09-06 河南辉煌科技股份有限公司 A kind of humping signal equipment on-line monitoring system and goat on-line monitoring method
CN110208624A (en) * 2019-06-19 2019-09-06 河南辉煌科技股份有限公司 A kind of humping signal equipment on-line monitoring system and retarder on-line monitoring method
CN110286282A (en) * 2019-06-19 2019-09-27 河南辉煌科技股份有限公司 A kind of long equipment on-line monitoring system and method for hump survey
RU2799173C1 (en) * 2023-02-17 2023-07-04 Общество с ограниченной ответственностью Строительная компания "МонолитЭнергоМонтаж" Repair and diagnostic system for trackside equipment of railway automatics and telemechanics

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110208625A (en) * 2019-06-19 2019-09-06 河南辉煌科技股份有限公司 A kind of humping signal equipment on-line monitoring system and goat on-line monitoring method
CN110208624A (en) * 2019-06-19 2019-09-06 河南辉煌科技股份有限公司 A kind of humping signal equipment on-line monitoring system and retarder on-line monitoring method
CN110286282A (en) * 2019-06-19 2019-09-27 河南辉煌科技股份有限公司 A kind of long equipment on-line monitoring system and method for hump survey
CN110208624B (en) * 2019-06-19 2024-02-20 河南辉煌科技股份有限公司 Hump signal equipment online monitoring system and speed reducer online monitoring method
CN110208625B (en) * 2019-06-19 2024-05-03 河南辉煌科技股份有限公司 Hump signal equipment online monitoring system and switch machine online monitoring method
RU2799173C1 (en) * 2023-02-17 2023-07-04 Общество с ограниченной ответственностью Строительная компания "МонолитЭнергоМонтаж" Repair and diagnostic system for trackside equipment of railway automatics and telemechanics

Similar Documents

Publication Publication Date Title
CN106655522B (en) A kind of main station system suitable for electric grid secondary equipment operation management
CN110941918B (en) Intelligent substation fault analysis system
CN110929898A (en) Hydropower station start-stop equipment operation and maintenance and fault monitoring online evaluation system and method
CA2903912A1 (en) Network for online monitoring of power transformer at intelligent substation
CN106571689B (en) Multi-data-source comparison technology diagnosis substation telemetry fault online monitoring system
CN112615436A (en) Health diagnosis and monitoring system and method for integrated automation device of transformer substation
CN104639587A (en) Robot fault monitoring system and method based on Internet of Things
CN103164775A (en) Automatic evaluation platform and method for power grid equipment status
CN110723166A (en) Turnout monitoring method and system
CN105785867A (en) Rapid positioning method for machine room equipment based on AST2400 remote management
CN203883361U (en) SF6 switch chamber intelligent monitoring system
CN203037628U (en) Gas chromatography on-line monitoring device for insulating oil of operating transformer
CN113514094A (en) Electric power monitoring and early warning system based on machine learning
RU98724U1 (en) CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS)
CN110365102B (en) Monitoring system and monitoring method for high-voltage direct-current circuit breaker
CN103279520A (en) Power substation secondary system failure reconnaissance method
RU2700302C1 (en) Method and device for remote monitoring and technical diagnostics of railway automation and telemechanics devices
CN112486304A (en) Real-time state monitoring and automatic defect processing system for secondary equipment of power transformation part
CN104467174A (en) Transformer station monitoring alarm information auxiliary processing system
CN102891443A (en) Application management system for infrared detection of electric transmission and transformation equipment
CN206281937U (en) Low-voltage distribution network running state analysis and early warning system
CN102608457B (en) System and method for automatic control and intelligent analysis in insulator pollution experiments
CN205941719U (en) Removal operation management end that power equipment detected
RU56308U1 (en) CONTROL AND DIAGNOSTIC COMPLEX OF STATIONARY DEVICES OF MOUNTAIN AUTOMATIC CENTRALIZATION (KDK SU GATS)
RU106873U1 (en) COMPLEX OF TECHNICAL MEANS OF DISPATCHING CENTRALIZATION (CCC DC)

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20130422

NF1K Reinstatement of utility model

Effective date: 20150127