RU95116762A - STEAM GAS INSTALLATION - Google Patents

STEAM GAS INSTALLATION

Info

Publication number
RU95116762A
RU95116762A RU95116762/06A RU95116762A RU95116762A RU 95116762 A RU95116762 A RU 95116762A RU 95116762/06 A RU95116762/06 A RU 95116762/06A RU 95116762 A RU95116762 A RU 95116762A RU 95116762 A RU95116762 A RU 95116762A
Authority
RU
Russia
Prior art keywords
compressor
stage
gas
turbine
gas turbine
Prior art date
Application number
RU95116762/06A
Other languages
Russian (ru)
Other versions
RU2078230C1 (en
Inventor
В.Ю. Бурлов
Г.В. Наздрюхина
Original Assignee
Акционерное общество закрытого типа "Энко-Центр"
Filing date
Publication date
Application filed by Акционерное общество закрытого типа "Энко-Центр" filed Critical Акционерное общество закрытого типа "Энко-Центр"
Priority to RU95116762A priority Critical patent/RU2078230C1/en
Priority claimed from RU95116762A external-priority patent/RU2078230C1/en
Application granted granted Critical
Publication of RU2078230C1 publication Critical patent/RU2078230C1/en
Publication of RU95116762A publication Critical patent/RU95116762A/en

Links

Claims (1)

Парогазовая установка, содержащая газотурбинную установку, включающую в себя воздушный компрессор, газовую турбину с электрогенератором, камеру сгорания, воздухозаборник, котел-утилизатор, дымовую трубу, газовоздухопроводы, паротурбинную установку, включающую в себя паровую турбину с электрогенератором, конденсатор, конденсатные и питательные насосы, подогреватели конденсата и питательной воды, деаэратор и соединяющие их трубопроводы пара и воды, отличающаяся тем, что она снабжена двумя дополнительными газоходами, компрессор выполнен из двух частей: компрессора первой ступени и компрессора второй ступени, газовая турбина выполнена из двух частей - приводной газовой турбины и силовой газовой турбины, вход компрессора первой ступени подсоединен к воздухозаборнику, выход компрессора первой ступени подсоединен первым дополнительным газоходом к камере сгорания, вход компрессора второй ступени подсоединен к второму дополнительному газоходу, а выход - к камере сгорания, второй дополнительный газоход размещен между входом компрессора второй ступени и входом силовой газовой турбины, котел-утилизатор размещен между приводной газовой турбиной и вторым дополнительным газоходом.Combined-cycle plant comprising a gas turbine installation including an air compressor, a gas turbine with an electric generator, a combustion chamber, an air intake, a waste heat boiler, a chimney, gas and air ducts, a steam turbine installation including a steam turbine with an electric generator, a condenser, condensate and feed pumps, condensate and feed water heaters, a deaerator and steam and water pipelines connecting them, characterized in that it is equipped with two additional gas ducts, the compressor is made n of two parts: the compressor of the first stage and the compressor of the second stage, the gas turbine is made of two parts - the driving gas turbine and the power gas turbine, the input of the compressor of the first stage is connected to the air intake, the output of the compressor of the first stage is connected by the first additional gas duct to the combustion chamber, the compressor input the second stage is connected to the second additional gas duct, and the output is to the combustion chamber, the second additional gas duct is placed between the compressor inlet of the second stage and the power gas inlet new turbine, a waste heat boiler is located between the drive gas turbine and the second additional gas duct.
RU95116762A 1995-09-28 1995-09-28 Steam-and-gas plant RU2078230C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU95116762A RU2078230C1 (en) 1995-09-28 1995-09-28 Steam-and-gas plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU95116762A RU2078230C1 (en) 1995-09-28 1995-09-28 Steam-and-gas plant

Publications (2)

Publication Number Publication Date
RU2078230C1 RU2078230C1 (en) 1997-04-27
RU95116762A true RU95116762A (en) 1997-08-20

Family

ID=20172461

Family Applications (1)

Application Number Title Priority Date Filing Date
RU95116762A RU2078230C1 (en) 1995-09-28 1995-09-28 Steam-and-gas plant

Country Status (1)

Country Link
RU (1) RU2078230C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2482292C2 (en) * 2011-05-04 2013-05-20 Государственное образовательное учреждение высшего профессионального образования Самарский государственный технический университет Power plant steam-gas unit

Similar Documents

Publication Publication Date Title
RU99113947A (en) MIXED TYPE POWER PLANT WITH GAS AND STEAM TURBINES
EP0900921A3 (en) Hydrogen burning turbine plant
RU2005107887A (en) ENERGY INSTALLATION
RU95116762A (en) STEAM GAS INSTALLATION
RU96108097A (en) STEAM GAS INSTALLATION
RU2769044C1 (en) Steam-gas plant with compressor steam turbine drive and high-pressure steam generator with intermediate steam superheater
RU2783424C1 (en) Combined-cycle plant with a steam turbine compressor drive, a regenerative air heater and a high-pressure steam generator
RU2078230C1 (en) Steam-and-gas plant
RU2168041C2 (en) Gas turbine plant
RU2092704C1 (en) Combined-cycle plant
SU1195020A1 (en) Steam-gas plant
SU1240925A1 (en) Steam-gas heat supply installation
RU2122131C1 (en) Combined gas turbine plant
RU2101528C1 (en) Combined-cycle plant
RU2092705C1 (en) Combined cycle plant
RU95104009A (en) Steam-gas plant
RU95104008A (en) Steam-gas plant
SU941642A1 (en) Steam-gas installation
RU2116559C1 (en) Multi-stage evaporation plant of steam-gas recovery type
SU1693271A1 (en) Steam-gas plant
JPS5523357A (en) Gas turbine for driving compressor using steam turbine
BG101245A (en) Method and installation with steam gas turbine for the recuperation of heat from the combustion of gaseous and liquid fuels
RU36126U1 (en) STEAM-GAS STATION WITH ADDITIONAL POWER INSTALLATION
RU93018231A (en) ELECTRIC POWER PLANT
RU2027026C1 (en) Combined steam-gas plant