RU95108731A - Method for development of oil deposit - Google Patents
Method for development of oil depositInfo
- Publication number
- RU95108731A RU95108731A RU95108731/03A RU95108731A RU95108731A RU 95108731 A RU95108731 A RU 95108731A RU 95108731/03 A RU95108731/03 A RU 95108731/03A RU 95108731 A RU95108731 A RU 95108731A RU 95108731 A RU95108731 A RU 95108731A
- Authority
- RU
- Russia
- Prior art keywords
- oil
- wells
- injection
- working agent
- rows
- Prior art date
Links
Landscapes
- Cosmetics (AREA)
- Lubricants (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
FIELD: oil production industry. SUBSTANCE: this can be used in development of nonuniform oil deposit. According to method, deposit is developed by taking oil from rows of producing wells with pumping in working agent through rows of injection wells so as to achieve reservoir pressure equal to 80-85% of initial value. Selected are flow lines of injected working agent to be perpendicular to rows of injection wells. On flow lines, flooded producing wells are converted into injection wells. Development of deposit is continued in mode of maintaining reservoir pressure. Selected are deposit zones with reduced porosity, permeability, oil saturation, worked out reserves and flooding speed, and with increased clay content. Additional producing wells are arranged in separated zone and/or beyond separated zone at opposite side from nearest row of injection wells. Additional producing wells are perforated in roof part of productive reservoir. Oil is taken at depression not below 85% of initial reservoir pressure. Used as working agent is accompanying Devonian water with density of 1.08-1.10 g/cm3. Working agent is pumped in cyclic operating mode: 10-20 days pumping , 10-20 days stoppage, with ensured ratio of volumes of oil taking and liquid pumping for 3 months of development. EFFECT: high efficiency.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95108731/03A RU2065938C1 (en) | 1995-06-08 | 1995-06-08 | Method of developing oil pool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU95108731/03A RU2065938C1 (en) | 1995-06-08 | 1995-06-08 | Method of developing oil pool |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2065938C1 RU2065938C1 (en) | 1996-08-27 |
RU95108731A true RU95108731A (en) | 1997-05-27 |
Family
ID=20168249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU95108731/03A RU2065938C1 (en) | 1995-06-08 | 1995-06-08 | Method of developing oil pool |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2065938C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106224779A (en) * | 2016-08-31 | 2016-12-14 | 西安长庆科技工程有限责任公司 | A kind of current stabilization water distribution integrating device |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2453689C1 (en) * | 2011-09-06 | 2012-06-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Oil deposit development method |
RU2607133C1 (en) * | 2016-02-29 | 2017-01-10 | Публичное акционерное общество "Татнефть" им. В.Д. Шашина | Method for development of non-homogeneous oil deposit |
CN111985747B (en) * | 2019-05-22 | 2024-04-30 | 中国石油天然气股份有限公司 | Oil reservoir development method and device |
-
1995
- 1995-06-08 RU RU95108731/03A patent/RU2065938C1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106224779A (en) * | 2016-08-31 | 2016-12-14 | 西安长庆科技工程有限责任公司 | A kind of current stabilization water distribution integrating device |
Also Published As
Publication number | Publication date |
---|---|
RU2065938C1 (en) | 1996-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU94042933A (en) | Method for intensification of oil recovery from diatomic formation of low permeability | |
RU95108731A (en) | Method for development of oil deposit | |
RU2007104999A (en) | METHOD FOR IMPLEMENTING VERTICAL FILLING OF OIL DEPOSIT | |
RU2135747C1 (en) | Process of extraction of water from boreholes with use of vacuum | |
RU2136872C1 (en) | Method of developing oil deposit | |
RU95108733A (en) | Method for development of oil deposit | |
RU2095549C1 (en) | Method for development of nonuniform oil bed | |
RU2070287C1 (en) | Method for treatment of producing well bottom-hole formation zone | |
RU2209951C1 (en) | Method of oil pool development | |
RU2060366C1 (en) | Method for developing oil deposit | |
RU95108718A (en) | Method for development of oil deposit | |
RU2105870C1 (en) | Method for development of oil deposit | |
RU2084620C1 (en) | Method for development of multiple-bed oil pool | |
SU966231A1 (en) | Method of treating seam near-face zone | |
RU2099512C1 (en) | Method for development of oil pools | |
SU972145A1 (en) | Method of hydraulic working of high-gas coal seam | |
RU2117142C1 (en) | Method for development of nonuniform oil deposit | |
RU95108726A (en) | Method for development of oil deposit | |
RU2047748C1 (en) | Oil pool development method | |
RU2053351C1 (en) | Method for development of oil pool | |
RU2334086C1 (en) | Method of oil pool development | |
SU1084464A1 (en) | Coal bed moistening method | |
SU1500792A1 (en) | Method of degassing coal seam | |
RU2149985C1 (en) | Method of oil pools development | |
RU95108732A (en) | Method for development of oil deposit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PC4A | Invention patent assignment |
Effective date: 20051226 |
|
PC41 | Official registration of the transfer of exclusive right |
Effective date: 20101208 |