RU95108731A - Method for development of oil deposit - Google Patents

Method for development of oil deposit

Info

Publication number
RU95108731A
RU95108731A RU95108731/03A RU95108731A RU95108731A RU 95108731 A RU95108731 A RU 95108731A RU 95108731/03 A RU95108731/03 A RU 95108731/03A RU 95108731 A RU95108731 A RU 95108731A RU 95108731 A RU95108731 A RU 95108731A
Authority
RU
Russia
Prior art keywords
oil
wells
injection
working agent
rows
Prior art date
Application number
RU95108731/03A
Other languages
Russian (ru)
Other versions
RU2065938C1 (en
Inventor
Р.Х. Муслимов
Ф.Т. Хамитова
Н.З. Муртазин
В.Г. Халтурин
В.А. Горюнов
Original Assignee
Акционерное общество открытого типа "Булгарнефть"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество открытого типа "Булгарнефть" filed Critical Акционерное общество открытого типа "Булгарнефть"
Priority to RU95108731/03A priority Critical patent/RU2065938C1/en
Application granted granted Critical
Publication of RU2065938C1 publication Critical patent/RU2065938C1/en
Publication of RU95108731A publication Critical patent/RU95108731A/en

Links

Landscapes

  • Cosmetics (AREA)
  • Lubricants (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

FIELD: oil production industry. SUBSTANCE: this can be used in development of nonuniform oil deposit. According to method, deposit is developed by taking oil from rows of producing wells with pumping in working agent through rows of injection wells so as to achieve reservoir pressure equal to 80-85% of initial value. Selected are flow lines of injected working agent to be perpendicular to rows of injection wells. On flow lines, flooded producing wells are converted into injection wells. Development of deposit is continued in mode of maintaining reservoir pressure. Selected are deposit zones with reduced porosity, permeability, oil saturation, worked out reserves and flooding speed, and with increased clay content. Additional producing wells are arranged in separated zone and/or beyond separated zone at opposite side from nearest row of injection wells. Additional producing wells are perforated in roof part of productive reservoir. Oil is taken at depression not below 85% of initial reservoir pressure. Used as working agent is accompanying Devonian water with density of 1.08-1.10 g/cm3. Working agent is pumped in cyclic operating mode: 10-20 days pumping , 10-20 days stoppage, with ensured ratio of volumes of oil taking and liquid pumping for 3 months of development. EFFECT: high efficiency.

Claims (1)

Изобретение относится к нефтяной промышленности и может найти применение при разработке неоднородной нефтяной залежи. Разрабатывают залежь, отбирая нефть через ряды добывающих скважин и закачивая рабочий агент через ряды нагнетательных скважин, до достижения пластового давления 80 - 85% от первоначального. Выделяют линии тока закачиваемого рабочего агента, перпендикулярные рядам нагнетательных скважин. На линиях тока переводят обводненные добывающие скважины в нагнетательные. Продолжают разработку залежи в режиме поддержания пластового давления. Выделяют зоны залежи с пониженной пористостью, проницаемостью, нефтенасыщенностью, выработанностью запасов и скоростью обводнения и повышенной глинистостью. Размещают дополнительные добывающие скважины в выделенной зоне и/или за выделенной зоной с противоположной стороны от ближайшего ряда нагнетательных скважин. Перфорируют дополнительные добывающие скважины в кровельной части продуктивного пласта. Отбор нефти осуществляют при депрессии не ниже 85% от начального пластового давления. В качестве рабочего агента используют попутную девонскую пластовую воду плотностью 1,08 - 1,10 г/см3. Закачку рабочего агента осуществляют в циклическом режиме: 10 - 20 сут. закачка, 10 - 20 сут. остановка при обеспечении соответствия объемов отбора и закачки жидкости за три месяца разработки.The invention relates to the oil industry and may find application in the development of a heterogeneous oil reservoir. Develop a reservoir by taking oil through the rows of producing wells and pumping a working agent through the rows of injection wells, until the reservoir pressure reaches 80 - 85% of the initial one. Allocate the streamlines of the injected working agent, perpendicular to the rows of injection wells. On current lines, waterlogged production wells are transferred to injection wells. Continue to develop reservoirs in the mode of maintaining reservoir pressure. Allocate zones of deposits with reduced porosity, permeability, oil saturation, depleted reserves and watering rate and increased clay content. Additional production wells are placed in the allocated zone and / or behind the allocated zone on the opposite side from the nearest row of injection wells. Additional production wells are perforated in the roofing of the reservoir. The selection of oil is carried out with a depression of at least 85% of the initial reservoir pressure. Associated Devonian formation water with a density of 1.08 - 1.10 g / cm 3 is used as a working agent. The injection of the working agent is carried out in a cyclic mode: 10 - 20 days. injection, 10 - 20 days. shutdown while ensuring compliance with the volumes of selection and injection of fluid for three months of development.
RU95108731/03A 1995-06-08 1995-06-08 Method of developing oil pool RU2065938C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU95108731/03A RU2065938C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU95108731/03A RU2065938C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Publications (2)

Publication Number Publication Date
RU2065938C1 RU2065938C1 (en) 1996-08-27
RU95108731A true RU95108731A (en) 1997-05-27

Family

ID=20168249

Family Applications (1)

Application Number Title Priority Date Filing Date
RU95108731/03A RU2065938C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Country Status (1)

Country Link
RU (1) RU2065938C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106224779A (en) * 2016-08-31 2016-12-14 西安长庆科技工程有限责任公司 A kind of current stabilization water distribution integrating device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2453689C1 (en) * 2011-09-06 2012-06-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method
RU2607133C1 (en) * 2016-02-29 2017-01-10 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method for development of non-homogeneous oil deposit
CN111985747B (en) * 2019-05-22 2024-04-30 中国石油天然气股份有限公司 Oil reservoir development method and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106224779A (en) * 2016-08-31 2016-12-14 西安长庆科技工程有限责任公司 A kind of current stabilization water distribution integrating device

Also Published As

Publication number Publication date
RU2065938C1 (en) 1996-08-27

Similar Documents

Publication Publication Date Title
RU94042933A (en) Method for intensification of oil recovery from diatomic formation of low permeability
RU95108731A (en) Method for development of oil deposit
RU2007104999A (en) METHOD FOR IMPLEMENTING VERTICAL FILLING OF OIL DEPOSIT
RU2135747C1 (en) Process of extraction of water from boreholes with use of vacuum
RU2136872C1 (en) Method of developing oil deposit
RU95108733A (en) Method for development of oil deposit
RU2095549C1 (en) Method for development of nonuniform oil bed
RU2070287C1 (en) Method for treatment of producing well bottom-hole formation zone
RU2209951C1 (en) Method of oil pool development
RU2060366C1 (en) Method for developing oil deposit
RU95108718A (en) Method for development of oil deposit
RU2105870C1 (en) Method for development of oil deposit
RU2084620C1 (en) Method for development of multiple-bed oil pool
SU966231A1 (en) Method of treating seam near-face zone
RU2099512C1 (en) Method for development of oil pools
SU972145A1 (en) Method of hydraulic working of high-gas coal seam
RU2117142C1 (en) Method for development of nonuniform oil deposit
RU95108726A (en) Method for development of oil deposit
RU2047748C1 (en) Oil pool development method
RU2053351C1 (en) Method for development of oil pool
RU2334086C1 (en) Method of oil pool development
SU1084464A1 (en) Coal bed moistening method
SU1500792A1 (en) Method of degassing coal seam
RU2149985C1 (en) Method of oil pools development
RU95108732A (en) Method for development of oil deposit

Legal Events

Date Code Title Description
PC4A Invention patent assignment

Effective date: 20051226

PC41 Official registration of the transfer of exclusive right

Effective date: 20101208