RU95108720A - Method for development of oil deposit - Google Patents

Method for development of oil deposit

Info

Publication number
RU95108720A
RU95108720A RU95108720/03A RU95108720A RU95108720A RU 95108720 A RU95108720 A RU 95108720A RU 95108720/03 A RU95108720/03 A RU 95108720/03A RU 95108720 A RU95108720 A RU 95108720A RU 95108720 A RU95108720 A RU 95108720A
Authority
RU
Russia
Prior art keywords
injection
oil
wells
months
days
Prior art date
Application number
RU95108720/03A
Other languages
Russian (ru)
Other versions
RU2065935C1 (en
Inventor
Ш.Ф. Тахаутдинов
А.Т. Панарин
М.Ш. Залятов
Р.Н. Дияшев
А.А. Просвирин
Original Assignee
Акционерное общество открытого типа "Булгарнефть"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Акционерное общество открытого типа "Булгарнефть" filed Critical Акционерное общество открытого типа "Булгарнефть"
Priority to RU95108720/03A priority Critical patent/RU2065935C1/en
Application granted granted Critical
Publication of RU2065935C1 publication Critical patent/RU2065935C1/en
Publication of RU95108720A publication Critical patent/RU95108720A/en

Links

Landscapes

  • Cosmetics (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
  • Fats And Perfumes (AREA)

Abstract

FIELD: oil production industry. SUBSTANCE: this can be used in development of oil deposit at later stage. According to method, oil is taken through producing wells. Burning of oil bed is initiated in injection wells and air is injected. After taking-out of 75-80% of available reserve, pumped into injection wells is accompanying Devonian water with density of 1.06-1.09 g/cm3 at average yearly volume of outputs from producing wells at down-hole pressure in producing wells not below 0.6 of initial bed pressure. Injection of accompanying Devonian water is effected in cyclic duty: during 5-7 months - injection, another 5-7 months - stoppage. In injection, additional cyclic mode is carried out: 10-20 days - injection, another 10-20 days - stoppage. EFFECT: high efficiency.

Claims (1)

Изобретение относится к нефтяной промышленности и может найти применение при разработке нефтяного месторождения на поздней стадии. В способе разработки нефтяной залежи отбирают нефть через добывающие скважины. В нагнетательных скважинах осуществляют розжиг нефтяного пласта и закачивают воздух. После извлечения 75 - 80 % извлекаемых запасов в нагнетательные скважины закачивают попутную девонскую воду плотностью 1,06 - 1,09 г/см3 в среднегодовом объеме дебитов добывающих скважин при забойных давлениях в добывающих скважинах не менее 0,6 от начального пластового давления. Закачку попутной девонской воды осуществляют в циклическом режиме: 5 - 7 месяцев нагнетание - 5 - 7 месяцев остановка, при этом при нагнетании выполняют дополнительный циклический режим: 10 - 20 суток нагнетание - 10 - 20 суток остановка.The invention relates to the oil industry and may find application in the development of an oil field at a late stage. In a method for developing an oil reservoir, oil is taken through production wells. In injection wells, an oil reservoir is ignited and air is pumped. After extracting 75 - 80% of the recoverable reserves, the Devonian associated water is pumped into the injection wells with a density of 1.06 - 1.09 g / cm 3 in the average annual production rate of production wells at bottomhole pressures in production wells of at least 0.6 of the initial reservoir pressure. Associated Devonian water is pumped in a cyclic mode: 5–7 months, injection - 5–7 months, a stop; while pumping, an additional cyclic mode is performed: 10–20 days, pumping — 10–20 days, a stop.
RU95108720/03A 1995-06-08 1995-06-08 Method of developing oil pool RU2065935C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU95108720/03A RU2065935C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU95108720/03A RU2065935C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Publications (2)

Publication Number Publication Date
RU2065935C1 RU2065935C1 (en) 1996-08-27
RU95108720A true RU95108720A (en) 1997-05-27

Family

ID=20168238

Family Applications (1)

Application Number Title Priority Date Filing Date
RU95108720/03A RU2065935C1 (en) 1995-06-08 1995-06-08 Method of developing oil pool

Country Status (1)

Country Link
RU (1) RU2065935C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2457322C1 (en) * 2011-02-15 2012-07-27 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Oil deposit development method

Also Published As

Publication number Publication date
RU2065935C1 (en) 1996-08-27

Similar Documents

Publication Publication Date Title
RU94042933A (en) Method for intensification of oil recovery from diatomic formation of low permeability
CA2343827A1 (en) Method and system for separating and injecting gas and water in a wellbore
AU4976396A (en) Method for improved water well production
RU95108720A (en) Method for development of oil deposit
RU95108718A (en) Method for development of oil deposit
RU96112657A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU97102596A (en) METHOD FOR TREATING A BOREHOLE BOTTOM ZONE
RU94029783A (en) Method for development of oil deposit with wedging-out zone
RU2103486C1 (en) Method for development of oil deposit
RU94032642A (en) Method of exploitation of inhomogeneous oil field
RU97109048A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU96101241A (en) METHOD FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS OF CRACKED TYPE
RU95108727A (en) Method for development of oil deposit
RU2148155C1 (en) Method of oil formation development
SU972145A1 (en) Method of hydraulic working of high-gas coal seam
RU96112663A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU97109047A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU95108728A (en) Method for development of oil deposit
RU96110676A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
RU1786247C (en) Method for working out oil pool
RU95101978A (en) Method for increasing field oil recovery
RU95108721A (en) Method for development of oil deposit
RU95104600A (en) Method for developing oil deposit using in-stratum combustion
RU94028984A (en) Method of increasing injectivity of terrigenous clay-grouted bed
RU94008060A (en) Method for displacing oil from carbonate strata of inhomogeneous permeability

Legal Events

Date Code Title Description
PC4A Invention patent assignment

Effective date: 20051226

PC41 Official registration of the transfer of exclusive right

Effective date: 20110203