RU94014968A - METHOD OF OIL DEPOSIT DEVELOPMENT - Google Patents

METHOD OF OIL DEPOSIT DEVELOPMENT

Info

Publication number
RU94014968A
RU94014968A RU94014968/03A RU94014968A RU94014968A RU 94014968 A RU94014968 A RU 94014968A RU 94014968/03 A RU94014968/03 A RU 94014968/03A RU 94014968 A RU94014968 A RU 94014968A RU 94014968 A RU94014968 A RU 94014968A
Authority
RU
Russia
Prior art keywords
oil
development
injection
wells
maps
Prior art date
Application number
RU94014968/03A
Other languages
Russian (ru)
Other versions
RU2072033C1 (en
Inventor
А.Р. Латыпов
А.М. Потапов
Т.Ф. Манапов
Н.И. Хисамутдинов
А.Г. Телин
М.М. Хасанов
Original Assignee
Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология"
Filing date
Publication date
Application filed by Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология" filed Critical Внедренческий научно-исследовательский инженерный центр "Нефтегазтехнология"
Priority to RU94014968/03A priority Critical patent/RU2072033C1/en
Priority claimed from RU94014968/03A external-priority patent/RU2072033C1/en
Publication of RU94014968A publication Critical patent/RU94014968A/en
Application granted granted Critical
Publication of RU2072033C1 publication Critical patent/RU2072033C1/en

Links

Claims (1)

Изобретение относится к нефтяной промышленности, а именно к способам доразработки нефтяных месторождений. Известен способ доразработки нефтяного месторождения, включающий нагнетание вытесняющего агента в нагнетательные скважины, добычу нефти через добывающие скважины и регулирование режима работы нагнетательных и добывающих скважин с учетом текущего состояния разработки залежи. С целью повышения эффективности способа за счет увеличения охвата и повышения конечной нефтеотдачи вовлечением в разработку слабодренируемых участков и "застойных" зон, необходимость регулирования режимов работы нагнетательных и добывающих скважин предварительно определяют по данным карт регулирования разработки изменением режимов закачки и отборов, отражающих желательность проведения регулирования; мероприятия по интенсификации притока нефти осуществляют на скважинах, выбранных по данным карт текущих потенциальных отборов, отражающих степень снижения продуктивности скважины с учетом естественного роста обводненности продукции; мероприятия по ограничению водопритока осуществляют на скважинах, выбранных по величине бобщенной функции желательности проведения ОПЗ, рассчитываемой по данным карт текущей обводненности, неоднородности фильтрационно-емкостных свойств пласта по разрезу, регулирования разработки изменением режимов отборов и остаточных извлекаемых запасов нефти; и комплексность регулирования разработки месторождения на поздней стадии достигают дополнительным анализом карт: текущей нефтенасыщенности, средневзвешенной по разрезу проницаемости, накопленного водонефтяного фактора и линии равного взаимодействия между скважинами, причем объемы и последовательность геолого-технических мероприятий (ГТМ) планируют на основе материального баланса отборов и закачки с учетом степени эффективности отдельных ГТМ. Способ промышленно применин и эффективен.The invention relates to the oil industry, and in particular to methods of additional development of oil fields. There is a method of additional development of an oil field, including the injection of a displacing agent in injection wells, oil production through production wells and regulation of the mode of operation of injection and production wells, taking into account the current state of the development of deposits. In order to increase the efficiency of the method by increasing the coverage and increasing the final oil recovery by involving low-drained sites and "stagnant" zones in development, the need to control the operating modes of injection and production wells is pre-determined according to the data of development control maps by changing the injection modes and selections reflecting the desirability of regulating; measures to intensify the flow of oil carried out on wells selected according to the maps of current potential selections, reflecting the degree of reduction in well productivity, taking into account the natural growth of water production; measures for limiting water inflow are carried out at wells selected by the magnitude of the generalized function of the desirability of conducting IPFs calculated from the current water-cut maps, heterogeneity of reservoir properties through the section, development control by changing the sampling modes and residual recoverable oil reserves; and the complexity of regulating the development of a field at a later stage reaches an additional analysis of the maps: current oil saturation, weighted average permeability, accumulated water-oil factor and a line of equal interaction between wells, and the volumes and sequence of geological and technical measures (GTM) are planned on the basis of the material balance of sampling and injection taking into account the degree of effectiveness of individual geological and technical measures. The method is industrially applicable and effective.
RU94014968/03A 1994-04-26 1994-04-26 Method for after-exploitation oil deposit RU2072033C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU94014968/03A RU2072033C1 (en) 1994-04-26 1994-04-26 Method for after-exploitation oil deposit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU94014968/03A RU2072033C1 (en) 1994-04-26 1994-04-26 Method for after-exploitation oil deposit

Publications (2)

Publication Number Publication Date
RU94014968A true RU94014968A (en) 1996-01-27
RU2072033C1 RU2072033C1 (en) 1997-01-20

Family

ID=20155107

Family Applications (1)

Application Number Title Priority Date Filing Date
RU94014968/03A RU2072033C1 (en) 1994-04-26 1994-04-26 Method for after-exploitation oil deposit

Country Status (1)

Country Link
RU (1) RU2072033C1 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2512150C2 (en) * 2012-05-11 2014-04-10 Гайдар Тимергалеевич Апасов Compound method for oil displacement out of bed by water-alternated-gas injection with use of well-head ejectors
RU2521245C1 (en) * 2013-02-19 2014-06-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Control method of oil pool development
RU2528343C1 (en) * 2013-05-06 2014-09-10 Открытое акционерное общество "Нефтяная компания "Роснефть" Method of water influx isolation and limitation to horizontal wells
RU2528185C1 (en) * 2013-06-24 2014-09-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Control method of oil pool development
RU2558093C1 (en) * 2014-07-04 2015-07-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Control method of oil pool development
CN105626055B (en) * 2014-11-07 2018-10-23 中国石油化工股份有限公司 Ultra-high water cut stage reservoir reserve employs quality evaluating method
RU2584025C1 (en) * 2014-12-02 2016-05-20 Открытое акционерное общество "Татнефть" им. В.Д.Шашина Method of reducing water influx to multilateral wells
RU2611097C1 (en) * 2015-11-19 2017-02-21 Юлий Андреевич Гуторов Method of developing oil deposits at late stage of operation
CN114427393B (en) * 2020-09-03 2024-04-30 中国石油化工股份有限公司 Pressure flooding water injection development method
CN114427397A (en) * 2020-09-11 2022-05-03 中国石油化工股份有限公司 Chemical flooding injection-production liquid amount determination method for refining to small layer and well group

Similar Documents

Publication Publication Date Title
RU94014968A (en) METHOD OF OIL DEPOSIT DEVELOPMENT
RU2072033C1 (en) Method for after-exploitation oil deposit
RU2100590C1 (en) Method of development of oil deposit
RU2200231C2 (en) Process of development of oil field
RU2191255C1 (en) Method of oil pool development
RU2105870C1 (en) Method for development of oil deposit
RU96106818A (en) METHOD FOR OIL DEPOSIT DEVELOPMENT
EA199900826A1 (en) METHOD FOR REMOVING IMPURITIES FROM HYDROCARBON FLUID ENVIRONMENT
RU2060367C1 (en) Method for development of oil deposit
RU1806261C (en) Process of development of hydrocarbon deposit
RU93006030A (en) METHOD FOR DETERMINING LEVEL OF LIQUID IN WELLS
McGraw et al. The Pickton field-review of a successful gas injection project
EA199900827A1 (en) METHOD FOR REMOVING IMPURITIES FROM RAW OIL AND GAS
RU2003785C1 (en) Method of exploitation of multipool oil field
RU2096606C1 (en) Method for development of oil deposit at early stage
RU2158820C1 (en) Method of development of oil and gas deposits
RU2185501C1 (en) Method of oil pool development with stabilization of filtration by propane
RU2209947C1 (en) Method of system cyclic development of oil pool at late stage
RU2061176C1 (en) Method for developing oil well
RU96101729A (en) METHOD FOR DEVELOPING OIL AND GAS DEPOSITS
RU1739697C (en) Method for development of low-permeable oil reservoirs
RU2059798C1 (en) Method for development of oil pool
RU95110726A (en) METHOD FOR DEVELOPING OIL AND GAS DEPOSITS
RU2064574C1 (en) Method for improving inflow of oil of critical zone treatment
RU2108449C1 (en) Method for development of oil deposit