RU29730U1 - The border is road - Google Patents

The border is road Download PDF

Info

Publication number
RU29730U1
RU29730U1 RU2001131738/20U RU2001131738U RU29730U1 RU 29730 U1 RU29730 U1 RU 29730U1 RU 2001131738/20 U RU2001131738/20 U RU 2001131738/20U RU 2001131738 U RU2001131738 U RU 2001131738U RU 29730 U1 RU29730 U1 RU 29730U1
Authority
RU
Russia
Prior art keywords
curb
border
height
road
technology
Prior art date
Application number
RU2001131738/20U
Other languages
Russian (ru)
Inventor
Ф.И. Калмыков
Original Assignee
Калмыков Федор Исаевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Калмыков Федор Исаевич filed Critical Калмыков Федор Исаевич
Priority to RU2001131738/20U priority Critical patent/RU29730U1/en
Application granted granted Critical
Publication of RU29730U1 publication Critical patent/RU29730U1/en

Links

Description

20011317382001131738

Щ|М ими ШШ МП IISH | M them SHSh MP II

Бордюр дорожныйThe border is road

Область техники, к которой относится изобретение.The technical field to which the invention relates.

Бордюр дорожный предназначен для обеспечения бокового ограничения, автомобильного или другого движущегося транспорта от пешеходных тротуаров.The road border is designed to provide lateral restrictions, road or other moving vehicles from pedestrian walkways.

Предлагаемый мной Бордюр дорожный конструктивно и геометрически несколько изменен от существующиего в настоящее время дорожного бордюра, а это дает возможность совершенно изменить технологию наращивания бордюра по высоте.The road border offered by me is structurally and geometrically slightly changed from the currently existing road border, and this makes it possible to completely change the technology for increasing the height of the border.

Предлагаемая мной новая технология наращивания бордюра по высоте ни в мировой, нив нашей российской практике аналогов не имеет.The new technology of building up the curb height that I propose does not have any analogues in the world, in our Russian practice.

Сущность изобретения.SUMMARY OF THE INVENTION

Мной предлагается новая технология наращивания дорожного бордюра по высоте с незначительным изменением геометрии и конструкции самого бордюра дорожного.I propose a new technology for building a road curb in height with a slight change in the geometry and design of the road curb itself.

Поясню суть вопроса.I will explain the essence of the issue.

На чертеже № 4 изображены тротуары для пешеходов а, сам бордюр б и полотно проезжей части автодороги в. Это как бы вновь построенная автомагистраль и высота бордюра обеспечивает безопасность от автодороги для пешеходов, идущих по тротуарам. Однако при эксплуатации автодорог идет периодический ремонт проезжего полотна автодороги в, при этом, естественно, происходит наращивание по высоте полотна автодороги, тогда как высота бордюра б остается на прежнем уровне см. черт. № 4 и бордюр утрачивает свою основную функцию бокового ограничителя от тротуара а.The drawing No. 4 shows the sidewalks for pedestrians a, the curb b and the roadway road c. This is like a newly built highway and the height of the curb provides road safety for pedestrians walking along the sidewalks. However, during the operation of the roads, the roadway c is periodically repaired, and naturally, the road’s road bed height increases, while the height of the curb remains at the same level, see the devil. No. 4 and the curb loses its main function as a side stop on the sidewalk a.

иишшнрresearch

Ч1 Q If 3Ч7R1 Q If 3CH7

Бордюр б по высоте не обеспечивает безопасность для пешеходов на тротуарах а от движущегося автотранспорта и поэтому требует обязательного либо замены бордюра б новым, либо наращивания (поднятия) на определенную высоту старого бордюра. Однако существующая на сегодняшний день технология наращивания бордюра по высоте очень трудоемкая и дорогостоящая.The height border does not provide safety for pedestrians on the sidewalks and from moving vehicles and therefore requires the mandatory either to replace the border with a new one or to build up (raise) it to a certain height of the old border. However, the current technology for increasing the height of the border is very laborious and expensive.

Например, для того, чтобы увеличить высоту бордюра, существующая технология предусматривает демонтаж всей обочины дороги, для того, чтобы либо заменить бордюр б на новый, либо поднять тот же бордюр на очень маленькую высоту (8-10 см) так как на большую высоту поднять невозможно из-за ограниченного размера бордюра см. черт. № 4, а уже через год-два эту же работу необходимо выполнять вновь и вновь, но уже с обязательной заменой бордюра на новый, более высокий.For example, in order to increase the height of the curb, the existing technology provides for the dismantling of the entire roadside, in order to either replace the curb with a new one, or raise the same curb to a very small height (8-10 cm) since to raise it to a high height impossible due to the limited size of the curb, see devil. No. 4, and after a year or two the same work must be done again and again, but with the mandatory replacement of the curb with a new, higher one.

Работа, как видите, проводится огромная, затраты большие, а толку от этой работы очень мало. Рассмотрев весь цикл существующего технологического процесса наращивания бордюра, я предлагаю незначительные конструктивные изменения самого бордюра дорожного, что в свою очередь позволит применить новую технологию наращивания по высоте. Это самое главное.The work, as you see, is huge, the costs are large, and there is very little use for this work. Having considered the entire cycle of the existing technological process of building the curb, I propose minor structural changes to the road curb itself, which in turn will allow us to use the new technology of building in height. It is most important.

Предлагаемый мной бордюр, как это видно на черт. № 1. Имеет либо одно, либо два сквозных отверстия, количество отверстий в бордюре зависит от его размеров по длине. Предлагаемое конструктивное отверстие в бордюре - является осоновой новой технологии, предлагаемого мной нового метода наращивания бордюра по высоте.The border offered by me, as you can see on the devil. No. 1. Has either one or two through holes, the number of holes in the curb depends on its length. The proposed constructive hole in the curb is the oson of a new technology, my new method of heightening the curb.

Предлагаю два размера бордюра: L 1000 мм имеет одно сквозное отверстие, при длине бордюра L 1500 мм предусматриваются два сквозных отверстия. Верхняя часть бордюра имеет сферическуюI offer two border sizes: L 1000 mm has one through hole, with a border length L 1500 mm two through holes are provided. The top of the curb is spherical

форму с плечиками под углом (10-12°) к центру оси бордюра см. черт. № 1.shape with shoulders at an angle (10-12 °) to the center of the axis of the curb, see devil. Number 1.

Первый нижний ярус, предлагаемого мной бордюра, см. черт. № 2 и 4, монтируется обычным способом, как это делается в настоящее время, с учетом особенностей измененных конструктивов, а вот когда требуется нарастить бордюр по высоте, то весь технологический процесс, предлагаемый мной, обновляется и упрощается. Суть процесса заключается в следующем. Дорожный бордюр, который необходимо нарастить по высоте, не требует демонтажа и это самое главное. Вновь изготовленный бордюр для увеличения высоты по своей геометрии и конструкции является в некотором роде зеркальным изображением бордюра, который был смонтирован ранее см. черт. № 1 и 4 и который теперь требуется увеличить по высоте см. черт. № 4.The first lower tier of the border offered by me, see the devil. Nos. 2 and 4 are mounted in the usual way, as is currently being done, taking into account the peculiarities of the modified constructs, but when it is required to increase the height of the curb, the whole technological process offered by me is updated and simplified. The essence of the process is as follows. The road curb, which must be increased in height, does not require dismantling and this is most important. The newly made border to increase the height in its geometry and design is in some way a mirror image of the border, which was mounted earlier, see the devil. No. 1 and 4, and which now needs to be increased in height, see devil. Number 4.

С помощью конструктивных элементов как это показано на черт. №№ 1,2,3 бордюр, предназначенный для наращивания по высоте, монтируется на бордюр ранее смонтированного и находящегося в дорожном полотне черт. № 2 и 4. Монтаж верхнего бордюра на нижний производится с помощью либо цементного раствора, либо другого скрепляющего вещества. В круглые отверстия, которые образуются из полусфер торцами бордюр черт.№ 1 и 2 так же заливаются цементным раствором или каким-либо другим скрепляющим веществом. Дополнительно для прочности наращиваемого бордюра, в технологические отверстия, предварительно заполненные скрепляющим материалом, пропускается металлический круглый или квадратный костыль см. черт. № 1,2,3. Таким образом, получается очень прочная и надежная конструкция, отвечающая техническим требованиям при эксплуатации дорожных бордюров.Using structural elements as shown in the devil. No. 1,2,3 the border intended for building on height, is mounted on the border of the line which is earlier mounted and being in a roadbed. No. 2 and 4. Installation of the upper border on the lower is carried out using either cement mortar or other bonding agent. In the round holes that are formed from the hemispheres by the ends, the border of Fig. 1 and 2 is also poured with cement mortar or some other fastening substance. Additionally, for the strength of the stacked border, a metal round or square crutch is passed into the technological holes pre-filled with fastening material, see fig. No. 1,2,3. Thus, a very strong and reliable design is obtained that meets the technical requirements for the operation of road curbs.

При новой технологии наращивания бордюра по высоте, предлагаемой мной, обеспечивается полная механизация процесса наращивания бордюра по высоте, возможность ведения работ в любое время года (круглогодично) без каких либо помех движущемуся транспорту, значительно сокращаются сроки выполнения объемов работ по сравнению со старой технологией наращивания бордюров по высоте. Мной предлагается выпуск бордюр по длине двух размеров L 1500 мм 1000 мм. Высота бордюр двух размеров h 200 мм -250 мм. Толщина бордюра t 180 мм.With the new height-enhancing curb technology that I propose, the mechanization of the height-enhancing curb is fully mechanized, work is possible at any time of the year (year-round) without any interference to moving vehicles, the time required to complete the work is significantly reduced compared to the old curb-building technology in height. I propose the release of a border along the length of two sizes L 1500 mm 1000 mm. The height of the border is two sizes h 200 mm -250 mm. Border thickness t 180 mm.

В каждом отдельном случае обязательно будет возможность выполнить спец заказы особых размеров по той же технологии, но суть технологии наращивания бордюра по высоте останется та же, которую я предлагаю.In each individual case, there will certainly be an opportunity to fulfill special orders of special sizes using the same technology, but the essence of the height-enhancing technology will remain the same as I offer.

Сведения, подтверждающие возможность осуществления изобретения.Information confirming the possibility of carrying out the invention.

Бордюр дорожный предлагаемый мной изготавливается из того же материала, из которого изготавливаются применяемый в настоящее время бордюр. Технология изготовления остается прежней, некоторые конструктивные изменения, предлагаемого мной Бордюра дорожного, не окажут никаких дополнительных трудностей в его изготовлении и легко исполнимы в наших производственных условиях по изготовлению железобетонных изделий.The road border offered by me is made of the same material from which the currently used border is made. The manufacturing technology remains the same, some design changes that I propose on the road border will not pose any additional difficulties in its manufacture and are easily enforceable in our production conditions for the manufacture of reinforced concrete products.

Формула изобретенияClaim

Бордюр дорожный представляет собой железобетонную геометрическую конструкцию предназначенную для наращивания бордюра дорожного по высоте отличается тем что является сборной конструкцией состоящей из нижней и верхней частей бордюра снабженных одним или двумя отверстиями по высоте бордюра такая конструкция бордюра позволяет производить наращивание по высоте бордюра без предварительного разрушения обочины дороги отличает с я тем что контактирующие площади верхнего бордюра с нижним являются геометрически зеркальными изображениями в торцах бордюра имеются выемки которые при монтаже с соседними деталями бордюра образуют цилиндр по всей высоте двух частей бордюра и заполняется жидким скрепляющим веществом и способствует увеличению жесткости и прочности конструкции в целом.The road border is a reinforced concrete geometric structure designed to build up the road curb in height; it is different in that it is a prefabricated structure consisting of the lower and upper parts of the curb equipped with one or two holes along the height of the curb. with the fact that the contacting areas of the upper border with the lower are geometrically mirror images at the ends of the curb there are recesses which, when mounted with adjacent parts of the curb, form a cylinder along the entire height of the two parts of the curb and are filled with liquid fastening substance and helps to increase the rigidity and strength of the structure as a whole.

Ф.И. КалмыковF.I. Kalmykov

ЧчHh

00

SS

Claims (1)

Бордюр дорожный представляет собой железобетонную геометрическую конструкцию, предназначенную для наращивания бордюра дорожного по высоте, что является сборной конструкцией, состоящей из нижней и верхней частей бордюра, снабженных одним или двумя отверстиями по высоте бордюра, такая конструкция бордюра позволяет производить наращивание по высоте бордюра без предварительного разрушения обочины дороги, отличающийся тем, что контактирующие площади верхнего бордюра с нижним являются геометрически зеркальными изображениями в торцах бордюра имеются выемки, которые при монтаже с соседними деталями бордюра образуют цилиндр по всей высоте двух частей бордюра, и заполняется жидким скрепляющим веществом, и способствует увеличению жесткости и прочности конструкции в целом.The road border is a reinforced concrete geometric structure designed to build up the road curb in height, which is a prefabricated structure consisting of the lower and upper parts of the curb, equipped with one or two holes along the height of the curb, such a border design allows building up the height of the curb without preliminary destruction roadsides, characterized in that the contacting areas of the upper border with the lower are geometrically mirror images at the ends of rdyura have recesses, which during assembly with adjacent components to form the curb cylinder over the whole height of the two parts of the curb, and filled with liquid bonding agent and helps to increase the rigidity and strength of the structure as a whole.
Figure 00000001
Figure 00000001
RU2001131738/20U 2001-11-26 2001-11-26 The border is road RU29730U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001131738/20U RU29730U1 (en) 2001-11-26 2001-11-26 The border is road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001131738/20U RU29730U1 (en) 2001-11-26 2001-11-26 The border is road

Publications (1)

Publication Number Publication Date
RU29730U1 true RU29730U1 (en) 2003-05-27

Family

ID=35365279

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001131738/20U RU29730U1 (en) 2001-11-26 2001-11-26 The border is road

Country Status (1)

Country Link
RU (1) RU29730U1 (en)

Similar Documents

Publication Publication Date Title
JP3930042B1 (en) Intersection with barrier-free pedestrian tunnel and its construction method
US6939078B1 (en) Tactile detectable warning ramps for pedestrian pathways
RU29730U1 (en) The border is road
CN101387095B (en) Full interchange crossroad
KR101179252B1 (en) Pillar cover apparatus for easy adjusting up and down
CN201738207U (en) High through capacity crossroad full intercommunication fly-over bridge
CN209652775U (en) A kind of road and bridge crack bracing means
RU52868U1 (en) CURRENT ROAD
CN214882871U (en) Steel construction overpass that can build fast
JP2008121403A (en) Crossing having barrier-free crosswalk tunnel
CN210797313U (en) Device for reinforcing lower border stone of bridge anti-collision guardrail
CN211113119U (en) Temporary bridge device
CN209760401U (en) Prefabricated reinforced concrete well periphery reinforcing structure
RU2003123129A (en) COMPLEX OF DEVICES DIVIDING TRANSPORT AND PEDESTRIAN FLOWS MOVING THROUGH THE CROSSROADS OF THE MAIN AND SECONDARY ROAD
JP2003268722A (en) Improvement work method for intersection and its adjacent part having bridge pier of viaduct on road median strip
KR20060026832A (en) A supporter of a mile post and a street lamp
KR101135350B1 (en) A block for construction of a bicycle lane
RU2233935C1 (en) Road kerb
CN210238190U (en) Crossing road surface additional strengthening who prevents rut
CN219430496U (en) Assembled overpass road structure
JP7291450B1 (en) Semi-flat culvert by sidewalk boundary block
CN211395210U (en) Crosswalk for people and vehicles to go straight in priority and for people and vehicles to go on their own roads respectively
KR200190054Y1 (en) Paving road using used tire block
CN211772993U (en) Stone pedestrian crossing line
CN216006476U (en) A apron of mating formation and curb structure for solving inspection shaft and curb conflict

Legal Events

Date Code Title Description
NF1K Reinstatement of utility model
ND1K Extending utility model patent duration
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20071127