RU2802098C1 - Ship sewage pumping plant - Google Patents

Ship sewage pumping plant Download PDF

Info

Publication number
RU2802098C1
RU2802098C1 RU2023114133A RU2023114133A RU2802098C1 RU 2802098 C1 RU2802098 C1 RU 2802098C1 RU 2023114133 A RU2023114133 A RU 2023114133A RU 2023114133 A RU2023114133 A RU 2023114133A RU 2802098 C1 RU2802098 C1 RU 2802098C1
Authority
RU
Russia
Prior art keywords
input
pump
output
controller
control unit
Prior art date
Application number
RU2023114133A
Other languages
Russian (ru)
Inventor
Олег Сергеевич Коновалов
Original Assignee
Общество с ограниченной ответственностью "ЯМЯ-ИНЖИНИРИНГ"
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "ЯМЯ-ИНЖИНИРИНГ" filed Critical Общество с ограниченной ответственностью "ЯМЯ-ИНЖИНИРИНГ"
Application granted granted Critical
Publication of RU2802098C1 publication Critical patent/RU2802098C1/en

Links

Images

Abstract

FIELD: sanitary equipment.
SUBSTANCE: intended for pumping wastewater, industrial water and raw sewage not passed through a grate for collecting and pumping a significant amount of wastewater, in all macroclimatic regions on land and at sea, both with moderately cold and tropical maritime climate. The plant for pumping ship sewage, designed for medium-sized river and sea vessels, taking into account cramped conditions of placement, has high reliability with constant monitoring of the continuity of operation due to the presence of upper and working level sensors installed additionally in the receiving tank, associated with pumps, each of which has its own control unit, which ensures continuous and reliable operation of pumps, and all these elements are not only interconnected, but also are under common control by the controller, and, if necessary, can be controlled from the operator's station. The reliability of the proposed plant for pumping ship sewage is also ensured by cyclic flushing of the receiving tank, carried out using a solenoid valve associated with pump control units located in the controller.
EFFECT: creation of a vacuum plant for the collection and pumping of ship sewage, which has high reliability with constant monitoring of the work continuity.
1 cl, 1 dwg

Description

Изобретение относится к санитарно - техническому оборудованию и предназначено для перекачивания сточных вод, технической воды и неочищенных сточных вод, не пропущенных через решетку для сбора и перекачивания значительного количества сточных вод, во всех макроклиматических районах на суше и на море, как с умеренно-холодным, так иThe invention relates to sanitary equipment and is intended for pumping wastewater, industrial water and raw sewage not passed through a grate for collecting and pumping a significant amount of wastewater, in all macroclimatic regions on land and at sea, both with moderately cold, so

с тропическим морским климатом.with a tropical maritime climate.

Установка разработана специально для грузовых судов, средних речных и морских судов с учетом стесненных условий размещения и жестких требований по минимальным массогабаритным характеристикам.The unit is designed specifically for cargo ships, medium-sized river and sea vessels, taking into account cramped placement conditions and stringent requirements for minimum weight and size characteristics.

Известно, что образование бытовых сточных вод на транспортных средствах, к которым относятся суда малого и среднего водоизмещения, носит прерывистый характер, что приводит к работе оборудования, обеспечивающего транспортирование бытовых сточных вод, в режиме чередования его включения и отключения, то есть к прерывистому режиму работы, зависящему от уровня жидкости в системе, вызывая тем самым ускорение износа всего транспортирующего оборудования, что приводит в целом к снижению надежности работы установки.It is known that the formation of domestic wastewater on vehicles, which include ships of small and medium displacement, is intermittent, which leads to the operation of equipment that ensures the transportation of domestic wastewater in the mode of alternating its on and off, that is, to intermittent operation. depending on the liquid level in the system, thereby causing accelerated wear of all conveying equipment, which generally leads to a decrease in the reliability of the installation.

Известно техническое решение, описанное в патенте Российской Федерации №2606039, МПКE03C1/00, E03F1/00, приоритет от 6 июля 2015 года на изобретение: “Система для оценки и прогнозирования сброса сточных вод”.Known technical solution described in the patent of the Russian Federation No. 2606039, MPKE03C1 / 00, E03F1 / 00, priority dated July 6, 2015 for the invention: “System for assessing and predicting wastewater discharges”.

Система содержит модуль перекачки воды, состоящий из, по меньшей мере, двух насосов с всасывающими и напорными трубопроводами, приёмный резервуар с подводящим трубопроводом и запорно-регулирующим устройством, модуль анализа диагностируемых параметров, содержащий блок анализа откачки воды из приёмного резервуара, блок вероятностного анализа водопритока, блок вероятностного анализа суммарной подачи насосов, блок вероятностного анализа накопительного расхода сточных вод Qнакоп= Qприт-Qкнс, где Qприт, Qкнс-– расход водопритока и суммарная подача насосов, блок анализа объёма сточных вод, сбрасываемых в окружающую среду, модуль контрольно-измерительных приборов, содержащий датчики подачи насосов, давления, измеритель потребляемой мощности.The system contains a water pumping module, consisting of at least two pumps with suction and pressure pipelines, a receiving tank with a supply pipeline and a shut-off and control device, a module for analyzing diagnosed parameters, containing a block for analyzing water pumping from a receiving tank, a block for probabilistic analysis of water inflow , a block for probabilistic analysis of the total flow of pumps, a block for probabilistic analysis of the cumulative flow of wastewater Q accum = Q inc -Q kns , where Q inc , Q kns - are the flow rate of water inflow and the total supply of pumps, a block for analyzing the volume of wastewater discharged into the environment, instrumentation module containing sensors for pumping, pressure, power consumption meter.

Наиболее близким аналогом по совокупности существенных признаков и назначению является техническое решение, описанное в патенте Российской Федерации № 2599331, МПК G01F3/00, G06Q50/00, приоритет от 25 мая 2015 года на изобретение: “Система оценки сбросов сточных вод в окружающую среду”, включающая модуль перекачки воды, содержащий, по меньшей мере, два насоса с всасывающими и напорными трубопроводами, приемный резервуар с подводящим трубопроводом, при этом всасывающие трубопроводы, по меньшей мере, двух насосов соединены с приемным резервуаром, модуль анализа диагностируемых параметров, модуль контрольно-измерительных приборов, содержащий или, по меньшей мере, два датчика подачи насоса, и/или, по меньшей мере, два датчика давления, установленных на напорных трубопроводах, и/или измеритель потребляемой мощности. Все датчики и измеритель потребляемой мощности модуля контрольно-измерительных приборов снабжены устройствами записи данных и каналами связи, блок ввода объемов приемного резервуара с каналом связи, блок анализа водопритока. Датчики подачи насосов выполнены с возможностью измерения подачи каждого насоса, измеритель потребляемой мощности выполнен с возможностью измерения силы тока и/или потребляемой мощности каждого насоса, блок ввода объемов приемного резервуара и блок анализа водопритока включены в состав модуля анализа диагностируемых параметров. Модуль анализа диагностируемых параметров дополнительно снабжен блоком ввода геометрических характеристик приемного резервуара, снабженного каналом связи, блоком ввода гидравлических характеристик подводящего трубопровода, снабженного каналом связи, блоком анализа откачки воды из приемного резервуара, снабженного устройством записи данных и каналом связи, блоком вероятностного анализа водопритока, снабженного каналом связи, блоком вероятностного анализа суммарной подачи насосов, снабженного каналом связи, блоком ввода вероятностных и технологических показателей надежности насосов, снабженного каналом связи, блоком вероятностного анализа накопительного расхода сточных вод Qнакоп=Qприт-Qкнс, где Qприт, Qкнс - расход водопритока и суммарная подача насосов, снабженного каналом связи, блоком анализа объема сточных вод, сбрасываемых в окружающую среду, блок анализа водопритока дополнительно снабжен двумя каналами связи, соединяющими его выход с входами блока вероятностного анализа водопритока и блока анализа объема сточных вод, сбрасываемых в окружающую среду, выход блока вероятностного анализа водопритока при помощи канала связи подключен к входу блока вероятностного анализа накопительного расхода сточных вод, а выход блока ввода вероятностных и технологических показателей надежности насосов при помощи канала связи подключен к входу блока вероятностного анализа суммарной подачи насосов, выход блока вероятностного анализа суммарной подачи насосов при помощи канала связи подключен к входу блока вероятностного анализа накопительного расхода сточных вод, выход которого при помощи канала связи подключен к входу блока анализа объема сточных вод, сбрасываемых в окружающую среду. Модуль контрольно-измерительных приборов дополнительно снабжен датчиком уровня воды, установленным на подводящем трубопроводе, и датчиком уровня воды, установленным в приемном резервуаре, снабженными устройствами записи данных и каналами связи. Модуль перекачки воды дополнительно снабжен запорно-регулирующим устройством с исполнительным органом, установленным на подводящем трубопроводе между датчиком уровня воды, установленным на подводящем трубопроводе, и приемным резервуаром, устройством управления, снабженным каналом связи. Блок вероятностного анализа накопительного расхода сточных вод выполнен с возможностью определения функции плотности вероятности накопительного расхода. Блок анализа водопритока выполнен с возможностью определения графика водопритока, поступающего в подводящий трубопровод перед приемным резервуаром, и корреляционной зависимости между продолжительностью подтопления подводящего трубопровода и накопительным расходом Qнакоп сточных вод, выход устройства записи данных датчика уровня воды, установленного в приемном резервуаре, при помощи каналов связи подключен к входу устройства управления и входу блока анализа водопритока, выход устройства управления - к входу исполнительного органа запорно-регулирующего устройства. Устройство управления выполнено с возможностью формирования сигналов управления на исполнительный орган запорно-регулирующего устройства, выход блока ввода объема приемного резервуара, выходы устройств записи данных, по меньшей мере, двух датчиков подачи насоса, двух датчиков давления и измерителя потребляемой мощности при помощи каналов связи подключены к входу блока анализа откачки воды из приемного резервуара, выход устройства записи данных датчика уровня воды, установленного на подводящем трубопроводе, при помощи канала связи подключен к входу блока анализа водопритока, выходы блоков ввода геометрических характеристик приемного резервуара, ввода гидравлических характеристик подводящего трубопровода и устройства записи данных блока анализа откачки воды из приемного резервуара при помощи каналов связи подключены к входу блока анализа водопритока.The closest analogue in terms of essential features and purpose is the technical solution described in the patent of the Russian Federation No. 2599331, IPC G01F3 / 00, G06Q50 / 00, priority dated May 25, 2015 for the invention: “System for assessing wastewater discharges into the environment”, including a water pumping module containing at least two pumps with suction and pressure pipelines, a receiving tank with a supply pipeline, while the suction pipelines of at least two pumps are connected to the receiving tank, a module for analyzing diagnosed parameters, a module for control and measuring devices containing or at least two pump flow sensors, and/or at least two pressure sensors installed on pressure pipelines, and/or a power consumption meter. All sensors and the power consumption meter of the instrumentation module are equipped with data recording devices and communication channels, a block for inputting volumes of a receiving tank with a communication channel, and a water inflow analysis block. The pump flow sensors are configured to measure the flow rate of each pump, the power consumption meter is configured to measure the current strength and/or power consumption of each pump, the unit for inputting the volumes of the receiving tank and the water inflow analysis unit are included in the module for analyzing the diagnosed parameters. The module for analyzing the diagnosed parameters is additionally equipped with a block for entering the geometric characteristics of the receiving tank, equipped with a communication channel, a block for entering the hydraulic characteristics of the supply pipeline, equipped with a communication channel, a block for analyzing water pumping out of the receiving tank, equipped with a data recording device and a communication channel, a block for probabilistic analysis of water inflow, equipped with a communication channel, a block for probabilistic analysis of the total supply of pumps, equipped with a communication channel, a block for inputting probabilistic and technological indicators of the reliability of pumps, equipped with a communication channel , a block for probabilistic analysis of the cumulative flow of wastewater flow rate of water inflow and total flow of pumps, equipped with a communication channel, a block for analyzing the volume of wastewater discharged into the environment, the block for analyzing water inflow is additionally equipped with two communication channels connecting its output with the inputs of the block for probabilistic analysis of water inflow and the block for analyzing the volume of wastewater discharged into the environment environment, the output of the block for probabilistic analysis of water inflow is connected via a communication channel to the input of the block for probabilistic analysis of the accumulative flow of wastewater, and the output of the block for input of probabilistic and technological indicators of the reliability of pumps is connected via a communication channel to the input of the block for probabilistic analysis of the total flow of pumps, the output of the block for probabilistic analysis total pump flow is connected via a communication channel to the input of the unit for probabilistic analysis of the cumulative flow of wastewater, the output of which is connected via a communication channel to the input of the unit for analyzing the volume of wastewater discharged into the environment. The instrumentation module is additionally equipped with a water level sensor installed on the supply pipeline and a water level sensor installed in the receiving tank, equipped with data recording devices and communication channels. The water pumping module is additionally equipped with a shut-off and control device with an actuator installed on the supply pipeline between the water level sensor installed on the supply pipeline and a receiving tank, a control device equipped with a communication channel. The unit for probabilistic analysis of the cumulative wastewater flow is configured to determine the probability density function of the cumulative flow. The water inflow analysis unit is configured to determine the schedule of water inflow entering the inlet pipeline in front of the receiving tank, and the correlation between the duration of the inlet pipeline flooding and the cumulative flow rate Q of the wastewater storage , the output of the data recorder of the water level sensor installed in the receiving tank, using channels connection is connected to the input of the control device and the input of the water inflow analysis unit, the output of the control device is connected to the input of the executive body of the shut-off and control device. The control device is configured to generate control signals to the executive body of the shut-off and control device, the output of the block for inputting the volume of the receiving tank, the outputs of the data recording devices of at least two pump flow sensors, two pressure sensors and a power consumption meter are connected via communication channels to the input of the analysis unit for pumping water from the receiving tank, the output of the data recorder of the water level sensor installed on the inlet pipeline is connected to the input of the water inflow analysis unit by means of a communication channel, the outputs of the blocks for entering the geometric characteristics of the receiving tank, the input of the hydraulic characteristics of the supply pipeline and the data recording device the analysis unit for pumping water from the receiving tank is connected to the input of the water inflow analysis unit using communication channels.

Недостаток описанного выше известного технического решения заключается в том, что оно не обладает высокой надежностью, так как не обеспечивают постоянного контроля непрерывности работы, а также контроля, возникающих в процессе работы системы ошибок, так как неисправность единственного датчика, установленного в приемном резервуаре, не позволяет постоянно контролировать процесс перекачки сточных вод, что требуется выполнять с учетом стесненных условий размещения приемного резервуара в средних речных и морских судах.The disadvantage of the known technical solution described above is that it does not have high reliability, since it does not provide constant monitoring of the continuity of operation, as well as monitoring that occurs during the operation of the system. errors, since the failure of the only sensor installed in the receiving tank does not allow to constantly monitor the process of pumping wastewater, which must be done taking into account the cramped conditions for placing the receiving tank in medium-sized river and sea vessels.

Кроме того, в известном техническом решении отсутствует возможность периодической промывки приемного резервуара, что также снижает надежность работы устройства в целом.In addition, in the known technical solution there is no possibility of periodic flushing of the receiving tank, which also reduces the reliability of the device as a whole.

Задачей заявляемого изобретения является создание установки для перекачки судовых сточных вод, обладающей высокой надежностью при постоянном контроле непрерывности работы.The objective of the claimed invention is to create a plant for pumping ship sewage, which has high reliability with constant monitoring of the continuity of work.

Поставленная задача решается за счет того, что установка для перекачки судовых сточных вод, содержащая первый и второй насосы, соединенные первыми входами через трубопроводы с приемным резервуаром, первый вход которого через трубопровод связан со стоками из системы канализации, в приемном резервуаре установлен датчик нижнего уровня заполнения воды, а также блок управления согласно изобретению дополнительно содержит датчики верхнего и рабочего уровней заполнения воды, установленные в приемном резервуаре, электромагнитный клапан промывки приемного резервуара, подключенный первым входом к водопроводу, а выходом – к входу приемного резервуара, при этом блок управления выполнен в виде контроллера, содержащего узлы управления работой первого и второго насосов, блоки отключения первого и второго насосов при непрерывной работе более 15 минут, блок перемены очередности запуска первого и второго насосов и задержки запуска дублирующего насоса, причем первый вход узла управления работой первого насоса, являющийся первым входом контроллера, связан с первым выходом первого насоса и через первый выход контроллера связан с постом оператора, второй вход узла управления работой первого насоса связан с первым выходом блока отключения первого насоса, вход которого, являющийся вторым входом контроллера, подключен ко второму выходу первого насоса, третий вход узла управления работой первого насоса соединен с первым выходом блока очередности запуска насосов, первый вход которого соединен с выходом узла управления работой первого насоса, являющимся вторым выходом контроллера, который соединен со вторым входом первого насоса и со вторым входом клапана промывки приемного резервуара, четвертый вход узла управления работой первого насоса связан с первым входом узла управления работой второго насоса, являющимся третьим входом контроллера, связан с выходом датчика нижнего уровня воды, пятый вход узла управления работой первого насоса соединен со вторым входом узла управления работой второго насоса, являющимся четвертым входом контроллера и подключен к выходу датчика рабочего уровня заполнения воды, шестой вход узла управления работой первого насоса соединен с третьим входом узла управления работой второго насоса, являющимся пятым входом контроллера, связан с каналом “аварийное отключение”, а также связан через третий выход контроллера с постом оператора, седьмой вход узла управления работой первого насоса подключен к четвертому входу узла, являющемуся шестым входом контроллера и связан с выходом датчика верхнего уровня заполнения воды, а также через четвертый выход контроллера соединен с постом оператора, восьмой вход узла управления работой первого насоса подключен к восьмому входу узла управления работой второго насоса, являющемуся девятым входом контроллера, связанным с каналом “включение автоматического режима”, пятый вход узла управления работой второго насоса связан с первым выходом блока отключения второго насоса при непрерывной работе более 15 минут, второй выход которого соединен с вторым выходом блока отключения первого насоса при непрерывной работе более 15 минут и через пятый выход контроллера соединен с постом оператора, при этом вход блока отключения второго насоса при непрерывной работе более 15 минут, являющийся седьмым входом контроллера, соединен с первым выходом второго насоса, второй выход которого через восьмой вход контроллера связан с шестым входом узла управления работой второго насоса и через шестой выход контроллера подключен к посту оператора, седьмой вход узла управления работой второго насоса соединен со вторым выходом блока перемены очередности запуска насосов и задержки запуска дублирующего насоса, второй вход которого связан с выходом узла управления работой второго насоса и через седьмой выход контроллера соединен со вторым входом второго насоса, и со вторым входом электромагнитного клапана откачки, причем третьи выходы первого и второго насосов объединены и подключены к системе слива.The problem is solved due to the fact that the installation for pumping ship sewage, containing the first and second pumps connected by the first inputs through pipelines to the receiving tank, the first input of which is connected through the pipeline with effluents from the sewage system, in the receiving tank there is a sensor of the lower filling level water, as well as the control unit according to the invention additionally contains sensors for the upper and working levels of water filling installed in the receiving tank, an electromagnetic valve for washing the receiving tank, connected by the first inlet to the water supply, and by the output - to the inlet of the receiving tank, while the control unit is made in the form a controller containing control units for the operation of the first and second pumps, blocks for shutting down the first and second pumps during continuous operation for more than 15 minutes, a block for changing the order of starting the first and second pumps and delaying the start of the backup pump, the first input of the control unit for the operation of the first pump being the first input of the controller is connected to the first output of the first pump and through the first output of the controller is connected to the operator's station, the second input of the control unit for the operation of the first pump is connected to the first output of the shutdown unit of the first pump, the input of which, being the second input of the controller, is connected to the second output of the first pump, the third the input of the control unit for the operation of the first pump is connected to the first output of the pump start sequence block, the first input of which is connected to the output of the control unit for the operation of the first pump, which is the second output of the controller, which is connected to the second input of the first pump and to the second input of the valve for flushing the receiving tank, the fourth input the control unit for the operation of the first pump is connected to the first input of the control unit for the operation of the second pump, which is the third input of the controller, is connected to the output of the low water level sensor, the fifth input of the control unit for the operation of the first pump is connected to the second input of the control unit for the operation of the second pump, which is the fourth input of the controller and is connected to the output of the sensor of the working level of water filling, the sixth input of the control unit for the operation of the first pump connected to the third input of the control unit for the operation of the second pump, which is the fifth input of the controller, is connected to the “emergency shutdown” channel, and is also connected through the third output of the controller to the operator’s station, the seventh input of the node for controlling the operation of the first pump is connected to the fourth input of the node, which is the sixth input of the controller and is connected to the output of the sensor of the upper level of water filling , and also through the fourth output of the controller is connected to the operator's station, the eighth input of the first pump operation control unit is connected to the eighth input of the second pump operation control unit, which is the ninth input of the controller associated with the “automatic mode activation” channel, the fifth input of the second pump operation control unit is connected to the first output of the second pump shutdown unit during continuous operation for more than 15 minutes , the second output of which is connected to the second output of the block for shutting off the first pump during continuous operation for more than 15 minutes and through the fifth output of the controller is connected to the operator’s station, while the input of the block for shutting off the second pump during continuous operation for more than 15 minutes, which is the seventh input of the controller, is connected to the first output of the second pump, the second output of which, through the eighth input of the controller, is connected to the sixth input of the control unit for the operation of the second pump and through the sixth output of the controller is connected to the operator’s station, the seventh input of the control unit for the operation of the second pump is connected to the second output of the block for changing the order of starting the pumps and delaying the start of the backup pump, the second input of which is connected to the output of the control unit for the operation of the second pump and is connected through the seventh output of the controller to the second input of the second pump, and to the second input of the pumping electromagnetic valve, the third outputs of the first and second pumps being combined and connected to the drain system.

На чертеже представлена блок - схема установки для перекачки судовых сточных вод. В соответствии с чертежом установка для перекачки судовых сточных вод содержит первый 6 и второй 7 насосы, соединенные первыми входами через трубопроводы с приемным резервуаром 2, вход которого через трубопровод связан со стоками из системы канализации. Датчики 3, 4 и 5 соответственно верхнего, рабочего и нижнего уровней установлены в приемном резервуаре 2, вход которого соединен с выходом электромагнитного клапана 1 промывки приемного резервуара 2, первый вход клапана 1 подключен водопроводу. Блок управления выполнен в виде контроллера 8, содержащего узлы 11, 13 управления работой первого и второго насосов 6, 7, блоки 9, 12 отключения первого и второго насосов 6, 7 при непрерывной работе более 15 минут, блок 10 перемены очередности запуска первого и второго насосов 6, 7 и задержки запуска дублирующего насоса, причем первый вход узла 11 управления работой первого насоса, являющийся первым входом контроллера 8, связан с первым выходом первого насоса 6, и через первый выход контроллера 8 связан с постом оператора, второй вход узла 11 управления работой первого насоса 6 связан с первым выходом блока 9 отключения первого насоса 6, вход которого являющийся вторым входом контроллера 8, подключен ко второму выходу первого насоса 6, третий вход узла 11 управления работой первого насоса 6 соединен с первым выходом блока 10 очередности запуска насосов 6, 7, первый вход которого соединен с выходом узла 11 управления работой первого насоса 6, являющимся вторым выходом контроллера 8, который соединен со вторым входом первого насоса 6 и со вторым входом клапана 1 промывки приемного резервуара 2, четвертый вход узла 11 управления работой первого насоса 6 связан с первым входом узла 13 управления работой второго насоса 7, являющимся третьим входом контроллера 8, связан с выходом датчика 5 нижнего уровня воды, пятый вход узла 11 управления работой первого насоса 6 соединен со вторым входом узла 13 управления работой второго насоса 7, являющимся четвертым входом контроллера 8 и подключен к выходу датчика 4 рабочего уровня заполнения воды, шестой вход узла 11 управления работой первого насоса 6 соединен с третьим входом узла 13 управления работой второго насоса 7, являющимся пятым входом контроллера 8, связан с каналом “аварийное отключение”, а также связан через третий выход контроллера 8 с постом оператора, седьмой вход узла 11 управления работой первого насоса 6 подключен к четвертому входу узла 13 управления работой второго насоса 7, являющемуся шестым входом контроллера 8 и связан с выходом датчика 3 верхнего уровня заполнения воды, а также через четвертый выход контроллера 8 соединен с постом оператора, восьмой вход узла 11 управления работой первого насоса 6 подключен к восьмому входу узла 13 управления работой второго насоса 7, являющемуся девятым входом контроллера 8, связанным с каналом “включение автоматического режима”, пятый вход узла 12 управления работой второго насоса 7 связан с первым выходом блока 12 отключения второго насоса 7 при непрерывной работе более 15 минут, второй выход которого соединен с вторым выходом блока 9 отключения первого насоса 6 при непрерывной работе более 15 минут и через пятый выход контроллера 8 соединен с постом оператора, при этом вход блока 12 отключения второго насоса 7 при непрерывной работе более 15 минут, являющийся седьмым входом контроллера 8, соединен с первым выходом второго насоса 7, второй выход которого через восьмой вход контроллера 8 связан с шестым входом узла 13 управления работой второго насоса 7 и через шестой выход контроллера 8 подключен к посту оператора, седьмой вход узла 13 управления работой второго насоса 7 соединен со вторым выходом блока 10 перемены очередности запуска насосов и задержки запуска дублирующего насоса, второй вход которого связан с выходом узла 13 управления работой второго насоса 7 и через седьмой выход контроллера 8 соединен со вторым входом второго насоса 7 откачки и со вторым входом электромагнитного клапана 1 откачки, причем третьи выходы первого 6 и второго 7 насосов объединены и подключены к системе слива. The drawing shows a block diagram of a plant for pumping ship sewage. In accordance with the drawing, the installation for pumping ship sewage contains the first 6 and second 7 pumps connected by the first inputs through pipelines to the receiving tank 2, the input of which is connected through the pipeline with effluent from the sewerage system. The sensors 3, 4 and 5, respectively, of the upper, working and lower levels are installed in the receiving tank 2, the input of which is connected to the output of the solenoid valve 1 for washing the receiving tank 2, the first input of the valve 1 is connected to the water supply. The control unit is made in the form of a controller 8, containing units 11, 13 for controlling the operation of the first and second pumps 6, 7, blocks 9, 12 for shutting down the first and second pumps 6, 7 during continuous operation for more than 15 minutes, a block 10 for changing the order of starting the first and second pumps 6, 7 and a delay in starting the backup pump, the first input of the node 11 controlling the operation of the first pump, which is the first input of the controller 8, is connected to the first output of the first pump 6,and through the first output of the controller 8 is connected to the operator's station, the second input of the node 11 to control the operation of the first pump 6 is connected to the first output of the block 9 of the shutdown of the first pump 6, the input of which is the second input of the controller 8, is connected to the second output of the first pump 6, the third input of the node 11 to control the operation of the first pump 6 is connected to the first output of the block 10 of the order of starting pumps 6, 7, the first input of which is connected to the output of the node 11 of the control of the operation of the first pump 6, which is the second output of the controller 8, which is connected to the second input of the first pump 6 and with the second input of the valve 1 for flushing the receiving tank 2, the fourth input of the node 11 for controlling the operation of the first pump 6 is connected to the first input of the node 13 for controlling the operation of the second pump 7, which is the third input of the controller 8, is connected to the output of the lower water level sensor 5, the fifth input of the node 11 to control the operation of the first pump 6 is connected to the second input of the node 13 to control the operation of the second pump 7, which is the fourth input of the controller 8 and is connected to the output of the sensor 4 of the working level of water filling, the sixth input of the node 11 control of the operation of the first pump 6 is connected to the third input of the node 13 to control the operation of the second pump 7, which is the fifth input of the controller 8, is connected to the "emergency shutdown" channel, and is also connected through the third output of the controller 8 to the operator's station, the seventh input of the node 11 to control the operation of the first pump 6 is connected to the fourth input of the node 13 to control the operation of the second pump 7, which is the sixth input of the controller 8 and is connected to the output of the sensor 3 of the upper level of water filling, and also through the fourth output of the controller 8 is connected to the operator's station, the eighth input of the node 11 to control the operation of the first pump 6 is connected to the eighth input of the node 13 to control the operation of the second pump 7, which is the ninth input of the controller 8 associated with the channel "turn on the automatic mode", the fifth input unit 12 for controlling the operation of the second pump 7 is connected to the first output of the block 12 for shutting down the second pump 7 during continuous operation for more than 15 minutes, the second output of which is connected to the second output of the block 9 for shutting down the first pump 6 during continuous operation for more than 15 minutes and through the fifth output of the controller 8 is connected with the operator's station, while the input of the block 12 shutdown of the second pump 7 during continuous operation for more than 15 minutes, which is the seventh input of the controller 8, is connected to the first output of the second pump 7, the second output of which, through the eighth input of the controller 8, is connected to the sixth input of the work control unit 13 of the second pump 7 and through the sixth output of the controller 8 is connected to the operator's station, the seventh input of the node 13 for controlling the operation of the second pump 7 is connected to the second output of the block 10 for changing the order of starting the pumps and delaying the start of the backup pump, the second input of which is connected to the output of the node 13 for controlling the operation of the second pump 7 and through the seventh output of the controller 8 is connected to the second input of the second pump 7 evacuation and the second input of the solenoid valve 1 evacuation, and the third outputs of the first 6 and second 7 pumps are combined and connected to the drain system.

Установка для перекачки судовых сточных вод работает следующим образом.Installation for pumping ship sewage operates as follows.

Для запуска одного из насосов необходимо подать сигнал “включение автоматического режима” на вход 8 узла управления 11 первым насосом 6 и на вход 8 узла управления 13 вторым насосом 7. Приемный резервуар 2 заполняется сточными водами. При достижении уровня жидкости в приемном резервуаре 2 датчика нижнего уровня 5 датчик выдает сигнал на узлы контроллера 8: на вход 4 узла управления 11 первым насосом 6 и вход 1 узла управления 13 вторым насосом 7. Далее, при достижении уровня жидкости в приемном резервуаре 2 датчика рабочего уровня 4, датчик срабатывает и выдает сигнал на вход 5 узла 11 управления первым насосом 6 и вход 2 13 узла управления вторым насосом 7. Блок 10 перемены очередности запуска насосов и задержки пуска дублирующего насоса контролирует работу насосов 6 и 7, получая сигналы от узлов 11, 13 управления насосами 6,7 и выдает сигнал на запуск первого насоса 6 и с задержкой 5 секунд выдает сигнал на запуск второго насоса 7. При этом на вход 3 узла 11 управления насосом 6 поступает сигнал с выхода блока 10. В результате на выходе узла 11 появляется сигнал, который запускает насос 6. Через 5 сек блок 10 выдает сигнал на вход 7 узла 13 управления вторым насосом 7, в результате на выходе узла 13 появляется сигнал на запуск насоса 7. Насосы 6 и 7 работают одновременно и откачивают жидкость из приемного резервуара 2. Уровень в приемном резервуаре 2 снижается и последовательно отключаются сигналы датчика 4 рабочего уровня и датчика 5 нижнего уровня. При отключении сигнала датчика 5 нижнего уровня сигналы на выходе узлов управления 11 и 13 отключаются, также отключаются насосы 6 и 7. При отключении насосов 6, 7 блок 10 переключает очередность запуска насосов: выдает сигнал на разрешение пуска на вход 7 узла 13 управления вторым насосом 7 и не выдает сигнал на разрешение пуска на вход 3 узла 11 управления первым насосом 6. В приемный резервуар 2 собираются сточные воды, при этом уровень в приемном резервуаре 2 растет и, достигая датчика 4 рабочего уровня, сигнал от датчика 4 включает вход 2 узла 13 управления вторым насосом 7. При этом запускается второй насос 7 и затем через 5 секунд блок 10 выдает сигнал на вход 5 узла 11 и включается насос 6. Далее работа насосов повторяется по описанному выше циклу, при этом в каждом цикле включения насосов очередность запуска насосов меняется.To start one of the pumps, it is necessary to send a signal “enable automatic mode” to input 8 control unit 11 with the first pump 6 and at the inlet 8 of the control unit 13 with the second pump 7. The receiving tank 2 is filled with sewage. When the liquid level in the receiving tank 2 of the lower level sensor 5 is reached, the sensor sends a signal to the nodes of the controller 8: to the input 4 of the control unit 11 by the first pump 6 and to the input 1 of the control unit 13 by the second pump 7. Further, when the liquid level in the receiving tank 2 of the sensor is reached operating level 4, the sensor is triggered and outputs a signal to input 5 of node 11 of the control of the first pump 6 and input 2 13 of the control node of the second pump 7. The unit 10 for changing the order of starting the pumps and delaying the start of the backup pump controls the operation of pumps 6 and 7, receiving signals from the nodes 11, 13 control pumps 6,7 and gives a signal to start the first pump 6 and with a delay of 5 seconds gives a signal to start the second pump 7. In this case, the input 3 of the node 11 of the pump control 6 receives a signal from the output of the block 10. As a result, the output node 11, a signal appears that starts pump 6. After 5 seconds, unit 10 sends a signal to input 7 of node 13 to control the second pump 7, as a result, a signal appears at the output of node 13 to start pump 7. Pumps 6 and 7 operate simultaneously and pump out liquid from receiving tank 2. The level in the receiving tank 2 decreases and the signals of the working level sensor 4 and the lower level sensor 5 are successively switched off. When the signal of the low level sensor 5 is turned off, the signals at the output of control units 11 and 13 are turned off, and pumps 6 and 7 are also turned off. 7 and does not issue a start permission signal to the input 3 of the control unit 11 of the first pump 6. Wastewater is collected in the receiving tank 2, while the level in the receiving tank 2 grows and, reaching the working level sensor 4, the signal from the sensor 4 turns on the input 2 of the node 13 control of the second pump 7. This starts the second pump 7 and then after 5 seconds the block 10 sends a signal to the input 5 of the node 11 and the pump 6 is turned on. is changing.

Для исключения переполнения приемного резервуара 2 предусмотрен датчик 3 верхнего уровня. При повышении уровня жидкости в приемном резервуаре 2 до датчика 3 верхнего уровня датчик выдает сигнал, который поступает на вход 7 узла 11, вход 4 узла 13 контроллера 8. При этом включаются выходы этих узлов и поступают сигналы на входы насосов 6,7 они включаются, и сбор жидкости в приемный резервуар 2 продолжается.To prevent overflow of the receiving tank 2, an upper level sensor 3 is provided. When the liquid level in the receiving tank 2 rises to the upper level sensor 3, the sensor generates a signal that is fed to input 7 of node 11, input 4 of node 13 of controller 8. In this case, the outputs of these nodes turn on and signals are received at the inputs of pumps 6,7, they turn on, and the collection of liquid in the receiving tank 2 continues.

Для защиты насосов от аварии на линии откачки (засорение) предусмотрено автоматическое выключение насосов при непрерывной работе насосов более 10 мин.To protect the pumps from an accident on the pumping line (clogging), automatic shutdown of the pumps is provided for continuous operation of the pumps for more than 10 minutes.

При работе насосов 6, 7 от них на блоки 9 и 12 задержки отключения насоса при длительной работе контроллера 8 подается сигнал о работе насоса. Если сигнал подается в течении более 10 мин, то на выходе узлов 9 и 12 возникает сигнал, который затем передается на вход 2 узла 11 и вход 5 узла 13, при этом отключается сигнал на выходе узлов 11 и 13 управления, в результате отключаются насосы 6,7.When the pumps 6, 7 are operating, they send a pump operation signal to the blocks 9 and 12 of the pump shutdown delay during prolonged operation of the controller 8. If the signal is given for more than 10 minutes, then a signal appears at the output of nodes 9 and 12, which is then transmitted to input 2 of node 11 and input 5 of node 13, while the signal is turned off at the output of control nodes 11 and 13, as a result, pumps 6 are turned off .7.

При возникновении сигнала о неисправности насосов 6 или 7 предусмотрено их отключение. Сигналы неисправности от насосов 6 или 7 поступают на вход 1 узла 11 управления первым насосом 6 или на вход 6 узла 13 управления вторым насосом 7, при этом отключаются сигналы на выходах узла 11 управления первым насосом 6 или узла 13 управления вторым насосом 7, что, в результате, отключает насосы 6 или 7.If a signal about a malfunction of pumps 6 or 7 occurs, their shutdown is provided. Malfunction signals from pumps 6 or 7 are fed to input 1 of node 11 of control of the first pump 6 or to input 6 of node 13 of control of the second pump 7, while the signals at the outputs of node 11 of control of the first pump 6 or node 13 of control of the second pump 7 are turned off, which, as a result, turns off pumps 6 or 7.

При возникновении сигнала “аварийное отключение”, который поступает на вход 6 узла 11 управления первым насосом 6, вход 3 узла 13 управления вторым насосом 7, при этом сигнал на выходах этих узлов отключается, что вызывает остановку насосов 6 и 7. When an “emergency shutdown” signal occurs, which is fed to input 6 of node 11 of the control of the first pump 6, input 3 of the node 13 of control of the second pump 7, while the signal at the outputs of these nodes is turned off, which causes the pumps 6 and 7 to stop.

Промывка приемного резервуара 2 осуществляется в соответствии с чередованием циклов работы установки.Flushing of the receiving tank 2 is carried out in accordance with the alternation of the plant operation cycles.

В первом цикле работы установки промывка приемного резервуара 2 осуществляется следующим образом. Одновременно с подачей сигнала на включение насоса 6 сигнал от узла 11 поступает на клапан 1 промывки приемного резервуара 2. При поступлении сигнала от блока 11 клапан 1 открывается и вода из водопровода поступает на промывку приемного резервуара 2. При повторном сигнале от узла 13 клапан 1 не реагирует на него и продолжает оставаться в открытом положении. При одновременном выключении насосов 6 и 7 сигнал от узлов 11 и 13 одновременно отключается и закрывается клапан 1, промывка приемного резервуара заканчивается.In the first cycle of the plant operation, the receiving tank 2 is flushed as follows. Simultaneously with the signal to turn on pump 6, a signal from node 11 is sent to valve 1 for flushing the receiving tank 2. When a signal is received from block 11, valve 1 opens and water from the water supply system flows to flush the receiving tank 2. When the signal from node 13 is repeated, valve 1 does not reacts to it and remains in the open position. When pumps 6 and 7 are turned off simultaneously, the signal from units 11 and 13 is simultaneously turned off and valve 1 closes, flushing of the receiving tank ends.

В следующем цикле работы установки промывка приемного резервуара 2 осуществляется следующим образом. Одновременно с подачей сигнала на включение насоса 7 сигнал от узла 13 поступает на клапан 1 промывки приемного резервуара 2. При поступлении сигнала от блока 13 клапан 1 открывается и вода из водопровода поступает на промывку приемного резервуара 2. При повторном сигнале от узла 11 клапан 1 не реагирует на него и продолжает оставаться в открытом положении. При одновременном выключении насосов 6 и 7 сигнал от узлов 11 и 13 одновременно отключается и закрывается клапан 1, промывка приемного резервуара 2 заканчивается.In the next cycle of the installation, the receiving tank 2 is flushed as follows. Simultaneously with the signal to turn on pump 7, a signal from node 13 is sent to valve 1 for flushing the receiving tank 2. When a signal is received from unit 13, valve 1 opens and water from the water supply system flows to flush the receiving tank 2. When the signal from node 11 is repeated, valve 1 does not reacts to it and remains in the open position. When pumps 6 and 7 are turned off simultaneously, the signal from units 11 and 13 is simultaneously turned off and valve 1 closes, flushing of receiving tank 2 ends.

В системе также предусмотрена связь с постом оператора, при этом сигнал о неисправности для оператора включается при следующих условиях: уровень сточных вод в приемном резервуаре 2 достиг датчика 3 верхнего уровня; возникновение неисправности насосов 6,7; отключении насосов 6,7 при длительной работе; при поступлении сигнала “аварийное отключение”.The system also provides for communication with the operator's station, and the alarm for the operator turns on under the following conditions: the level of wastewater in the receiving tank 2 has reached the upper level sensor 3; occurrence of malfunction of pumps 6.7; shutdown of pumps 6.7 during long-term operation; when an emergency stop signal is received.

- При срабатывании датчика 3 верхнего уровня сигнал поступает в контроллер 8 и далее на пост оператора, контролирующего установку (на схеме не показан).- When the upper level sensor 3 is triggered, the signal goes to the controller 8 and then to the operator's station controlling the installation (not shown in the diagram).

- При возникновении неисправности первого насоса 6 или второго насоса 7 сигналы от насосов поступают в контроллер 8 и далее на пост оператора (на схеме не показан).- In the event of a malfunction of the first pump 6 or the second pump 7, the signals from the pumps go to the controller 8 and then to the operator's station (not shown in the diagram).

- При работе первого насоса 6 сигнал о его работе поступает на блок 9 отключения первого насоса 6. Если первый насос 6 непрерывно работает более 10 мин, то на выходе блока 9 возникает сигнал, который поступает на пост оператора (на схеме не показан).- When the first pump 6 is operating, a signal about its operation is sent to the block 9 for shutting down the first pump 6. If the first pump 6 has been running continuously for more than 10 minutes, then a signal appears at the output of block 9, which is sent to the operator's station (not shown in the diagram).

- При работе второго насоса 7 сигнал о его работе поступает на блок 12 отключения второго насоса 7. Если второй насос 7 непрерывно работает более 10 мин на выходе блока 12 возникает сигнал, который поступает на пост оператора- When the second pump 7 is operating, a signal about its operation is sent to the block 12 for shutting down the second pump 7. If the second pump 7 has been running continuously for more than 10 minutes, a signal occurs at the output of block 12, which is sent to the operator's station

(на схеме не показан).(not shown in the diagram).

- При подаче сигнала “аварийное отключение” сигнал поступает в контроллер 8 и далее на пост оператора (на схеме не показан).- When the “emergency shutdown” signal is given, the signal goes to the controller 8 and then to the operator’s station (not shown in the diagram).

При получении сигнала о неисправности оператор подходит к установке, проводит осмотр и принимает решение о проведении работ по ремонту установки.Upon receiving a signal about a malfunction, the operator approaches the unit, inspects it and decides to carry out work to repair the unit.

Заявляемая установка для перекачки судовых сточных вод, предназначенная для средних речных и морских судов с учетом стесненных условий размещения, обладает высокой надежностью при постоянном контроле непрерывности работы по сравнению с ближайшим аналогом за счет наличия установленных дополнительно в приемном резервуаре датчиков верхнего и рабочего уровней, связанных с насосами откачки, каждый из которых имеет свой узел управления, обеспечивающий непрерывную и надежную работу насосов откачки, причем все указанные элементы связаны не только между собой, но и находятся под общим управлением, осуществляемым контроллером, а также, в случае необходимости, могут контролироваться с поста оператора.The inventive installation for pumping ship sewage, designed for medium-sized river and sea vessels, taking into account cramped conditions of placement, is highly reliable with constant monitoring of the continuity of operation compared to the closest analogue due to the presence of additional sensors installed in the receiving tank of the upper and working levels associated with pumping pumps, each of which has its own control unit, which ensures continuous and reliable operation of the pumping pumps, and all these elements are not only interconnected, but also under common control by the controller, and, if necessary, can be controlled from the post operator.

Надежность работы заявляемой установки для перекачки судовых сточных вод обеспечивается также за счет циклической промывки приемного резервуара, осуществляемой с помощью электромагнитного клапана, связанного с блоками управления насосами, расположенными в контроллере.The reliability of the proposed installation for pumping ship sewage is also ensured by cyclic flushing of the receiving tank, carried out using a solenoid valve associated with pump control units located in the controller.

Claims (1)

Установка для перекачки судовых сточных вод, содержащая первый и второй насосы, соединенные первыми входами через трубопроводы с приемным резервуаром, первый вход которого через трубопровод связан со стоками из системы канализации, в приемном резервуаре установлен датчик нижнего уровня заполнения воды, а также блок управления, отличающаяся тем, что дополнительно содержит датчики верхнего и рабочего уровней заполнения воды, установленные в приемном резервуаре, электромагнитный клапан промывки приемного резервуара, подключенный первым входом к водопроводу, а выходом – к входу приемного резервуара, при этом блок управления выполнен в виде контроллера, содержащего узлы управления работой первого и второго насосов, блоки отключения первого и второго насосов при непрерывной работе более 15 минут, блок перемены очередности запуска первого и второго насосов и задержки запуска дублирующего насоса, причем первый вход узла управления работой первого насоса, являющийся первым входом контроллера, связан с первым выходом первого насоса и через первый выход контроллера связан с постом оператора, второй вход узла управления работой первого насоса связан с первым выходом блока отключения первого насоса, вход которого, являющийся вторым входом контроллера, подключен ко второму выходу первого насоса, третий вход узла управления работой первого насоса соединен с первым выходом блока очередности запуска насосов, первый вход которого соединен с выходом узла управления работой первого насоса, являющимся вторым выходом контроллера, который соединен с вторым входом первого насоса и с вторым входом клапана промывки приемного резервуара, четвертый вход узла управления работой первого насоса связан с первым входом узла управления работой второго насоса, являющимся третьим входом контроллера, связан с выходом датчика нижнего уровня воды, пятый вход узла управления работой первого насоса соединен со вторым входом узла управления работой второго насоса, являющимся четвертым входом контроллера, и подключен к выходу датчика рабочего уровня заполнения воды, шестой вход узла управления работой первого насоса соединен с третьим входом узла управления работой второго насоса, являющимся пятым входом контроллера, связан с каналом «варийное отключение» а также связан через третий выход контроллера с постом оператора, седьмой вход узла управления работой первого насоса подключен к четвертому входу узла управления работой второго насоса, являющемуся шестым входом контроллера, и связан с выходом датчика верхнего уровня заполнения воды, а также через четвертый выход контроллера соединен с постом оператора, восьмой вход узла управления работой первого насоса подключен к восьмому входу узла управления работой второго насоса, являющемуся девятым входом контроллера, связанным с каналом «включение автоматического режима», пятый вход узла управления работой второго насоса связан с первым выходом блока отключения второго насоса при непрерывной работе более 15 минут, второй выход которого соединен со вторым выходом блока отключения первого насоса при непрерывной работе более 15 минут и через пятый выход контроллера соединен с постом оператора, при этом вход блока отключения второго насоса при непрерывной работе более 15 минут, являющийся седьмым входом контроллера, соединен с первым выходом второго насоса, второй выход которого через восьмой вход контроллера связан с шестым входом узла управления работой второго насоса и через шестой выход контроллера подключен к посту оператора, седьмой вход узла управления работой второго насоса соединен со вторым выходом блока перемены очередности запуска насосов и задержки запуска дублирующего насоса, второй вход которого связан с выходом узла управления работой второго насоса и через седьмой выход контроллера соединен со вторым входом второго насоса и со вторым входом электромагнитного клапана откачки, причем третьи выходы первого и второго насосов объединены и подключены к системе слива.Installation for pumping ship sewage, containing the first and second pumps connected by the first inputs through pipelines to the receiving tank, the first input of which is connected through the pipeline with effluents from the sewerage system, in the receiving tank there is a sensor of the lower filling level of water, as well as a control unit, which differs the fact that it additionally contains sensors for the upper and working levels of water filling installed in the receiving tank, an electromagnetic valve for washing the receiving tank, connected by the first inlet to the water supply, and by the output - to the inlet of the receiving tank, while the control unit is made in the form of a controller containing control units operation of the first and second pumps, blocks for shutting down the first and second pumps during continuous operation for more than 15 minutes, a block for changing the order of starting the first and second pumps and delaying the start of the backup pump, the first input of the control unit for the operation of the first pump, which is the first input of the controller, is connected to the first by the output of the first pump and through the first output of the controller is connected to the operator's station, the second input of the control unit for the operation of the first pump is connected to the first output of the shutdown block of the first pump, the input of which, which is the second input of the controller, is connected to the second output of the first pump, the third input of the control unit for the operation of the first of the pump is connected to the first output of the pump start sequence block, the first input of which is connected to the output of the first pump operation control unit, which is the second output of the controller, which is connected to the second input of the first pump and to the second input of the receiving tank flushing valve, the fourth input of the first pump operation control unit connected to the first input of the second pump operation control unit, which is the third input of the controller, is connected to the low water level sensor output, the fifth input of the first pump operation control unit is connected to the second input of the second pump operation control unit, which is the fourth controller input, and is connected to the sensor output operating level of water filling, the sixth input of the first pump operation control unit is connected to the third input of the second pump operation control unit, which is the fifth input of the controller, is connected to the "emergency shutdown" channel and is also connected through the third output of the controller to the operator's station, the seventh input of the operation control unit of the first pump is connected to the fourth input of the second pump operation control unit, which is the sixth input of the controller, and is connected to the output of the upper water level sensor, and is also connected to the operator’s station through the fourth controller output, the eighth input of the first pump operation control unit is connected to the eighth input of the unit control of the operation of the second pump, which is the ninth input of the controller associated with the channel "turn on the automatic mode", the fifth input of the control unit for the operation of the second pump is connected to the first output of the shutdown unit of the second pump during continuous operation for more than 15 minutes, the second output of which is connected to the second output of the shutdown unit of the first pump during continuous operation for more than 15 minutes and through the fifth output of the controller is connected to the operator's station, while the input of the shutdown block of the second pump during continuous operation for more than 15 minutes, which is the seventh input of the controller, is connected to the first output of the second pump, the second output of which is through the eighth input of the controller is connected to the sixth input of the second pump operation control unit and through the sixth output of the controller is connected to the operator's station, the seventh input of the second pump operation control unit is connected to the second output of the unit for changing the order of starting the pumps and delaying the start of the backup pump, the second input of which is connected to the output of the control unit operation of the second pump and through the seventh output of the controller is connected to the second input of the second pump and to the second input of the pumping electromagnetic valve, and the third outputs of the first and second pumps are combined and connected to the drain system.
RU2023114133A 2023-05-30 Ship sewage pumping plant RU2802098C1 (en)

Publications (1)

Publication Number Publication Date
RU2802098C1 true RU2802098C1 (en) 2023-08-22

Family

ID=

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU765472A2 (en) * 1979-01-15 1980-09-23 Предприятие П/Я А-1158 Unit for pumping waste water
SU1114618A1 (en) * 1981-03-12 1984-09-23 Ленинградский Институт Водного Транспорта Ship water purification plant
WO2015193416A1 (en) * 2014-06-19 2015-12-23 Ozono Elettronica Internazionale S.R.L. Plant for the treatment of waste water on board of vessels
RU2599331C1 (en) * 2015-05-25 2016-10-10 ООО "Ассоциация инженеров и учёных по водоснабжению и водоотведению" System for assessing wastewaters discharges into environment
RU2606039C1 (en) * 2015-07-06 2017-01-10 Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" System for estimation and forecast of discharges of waste water

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU765472A2 (en) * 1979-01-15 1980-09-23 Предприятие П/Я А-1158 Unit for pumping waste water
SU1114618A1 (en) * 1981-03-12 1984-09-23 Ленинградский Институт Водного Транспорта Ship water purification plant
WO2015193416A1 (en) * 2014-06-19 2015-12-23 Ozono Elettronica Internazionale S.R.L. Plant for the treatment of waste water on board of vessels
RU2599331C1 (en) * 2015-05-25 2016-10-10 ООО "Ассоциация инженеров и учёных по водоснабжению и водоотведению" System for assessing wastewaters discharges into environment
RU2606039C1 (en) * 2015-07-06 2017-01-10 Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" System for estimation and forecast of discharges of waste water

Similar Documents

Publication Publication Date Title
CN103858005A (en) Ultrasound system for measuring both flow rate and density using
RU94291U1 (en) ENERGY CONSUMPTION MANAGEMENT SYSTEM DURING OPERATION OF SEWER PUMP STATIONS (SPS)
EP3408462B1 (en) Method for controlling a vacuum sewage system for a building or for a marine vessel
GB2447867A (en) A method of monitoring a submerged sewerage pump
RU2328597C1 (en) Process and device of oil well yield measurement at group facilities
RU2802098C1 (en) Ship sewage pumping plant
KR20130117518A (en) Water sealed apparatus for gas conduit
JP2006037354A (en) Method and equipment for controlling water intake of run-of-river type hydro-electric power plant
JP4439831B2 (en) Water quality improvement control device for combined sewerage treatment facilities
RU2599331C1 (en) System for assessing wastewaters discharges into environment
RU2596029C2 (en) Water inflow diagnostic system
RU2557349C1 (en) System of diagnostic of water flowrate
JP4690970B2 (en) Rainwater drainage pump system
KR101257709B1 (en) Drainage control system of first flush
CN108867722A (en) The simulation experiment system of piping lane drainage system safety detection
KR20100020104A (en) Undercurrent tank watergate administration system
CN209956666U (en) Oil depot oil leakage protection system
CN209366438U (en) A kind of Sewage from Ships discharge maintenance device
KR101478976B1 (en) Smart flowmeter
RU2538140C1 (en) Station for transfer and separation of multiphase mix
RU2102563C1 (en) Sewerage pumping station
RU198459U1 (en) DEVICE FOR CONTROL AND MONITORING OF PROCEDURES FOR DRAINING AND FILLING OF LIQUID PRODUCTS IN THE TANK RESERVOIRS
KR20210085030A (en) Thermosalinograph System for High Resolution and Real-time Data Aquisition
JPH10311068A (en) Water feed control system of building
RU2606039C1 (en) System for estimation and forecast of discharges of waste water