RU2786203C1 - Method for a comprehensive examination of a block of protective tubes of a nuclear reactor and a device for its implementation - Google Patents

Method for a comprehensive examination of a block of protective tubes of a nuclear reactor and a device for its implementation Download PDF

Info

Publication number
RU2786203C1
RU2786203C1 RU2022114335A RU2022114335A RU2786203C1 RU 2786203 C1 RU2786203 C1 RU 2786203C1 RU 2022114335 A RU2022114335 A RU 2022114335A RU 2022114335 A RU2022114335 A RU 2022114335A RU 2786203 C1 RU2786203 C1 RU 2786203C1
Authority
RU
Russia
Prior art keywords
block
bar
inspection shaft
bzt
compartments
Prior art date
Application number
RU2022114335A
Other languages
Russian (ru)
Inventor
Евгений Сергеевич Батарев
Original Assignee
Общество с ограниченной ответственностью "Пролог"
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Пролог" filed Critical Общество с ограниченной ответственностью "Пролог"
Application granted granted Critical
Publication of RU2786203C1 publication Critical patent/RU2786203C1/en

Links

Images

Abstract

FIELD: reactors.
SUBSTANCE: inventions group relates to a method and devices for monitoring the internals of a VVER-type reactor from the outside. A method for comprehensive inspection of the block of protective tubes of a nuclear reactor from the outside consists in taking readings when the block of protective tubes is removed from the reactor vessel and installed in the inspection shaft of the block of protective tubes using a bar. The bar is made in the form of a rectangular frame with at least two compartments with chamber modules in the form of metal boxes, where a television camera and an illuminator are located, and the bar is placed between the protective tube inspection shaft and the reactor vessel and readings are taken from the lower surface of the protective tube block using a bar in time of block movement from the reactor vessel to the inspection shaft. The ring device used for examination is made in the form of an annular frame with at least two compartments, and at least two supports are attached to the frame with their upper ends, and the compartments contain chamber modules in the form of metal boxes, where a television camera and an illuminator are located. The ring is installed on the top of the spacer of the inspection shaft of the protective tube block and readings are taken from the side surface of the protective tube block during installation of the block in the inspection shaft.
EFFECT: invention provides the ability to reduce the time of the control procedure by carrying it out simultaneously with the movement of the protective tube block from the reactor pressure vessel to the inspection shaft, as well as by simplifying the assembly, installation and dismantling of equipment for inspection, ensuring the availability of internal facilities during decontamination and operational reliability of the equipment.
3 cl, 5 dwg, 1 ex

Description

Группа изобретений относится к измерительной технике в области атомной энергетики, в частности к способу и устройствам для проведения контроля внутрикорпусных устройств реактора типа ВВЭР снаружи. Данная группа изобретений предназначена для проведения автоматизированного дистанционного контроля основного металла и сварных соединений блока защитных труб (БЗТ) реактора методом визуального и измерительного контроля с использованием телевизионных средств в период, предшествующий эксплуатации, и в период планового предупредительного ремонта.SUBSTANCE: group of inventions relates to measuring equipment in the field of nuclear energy, in particular to a method and devices for monitoring internal devices of a VVER type reactor from the outside. This group of inventions is intended for carrying out automated remote control of the base metal and welded joints of the block of protective tubes (BZT) of the reactor by the method of visual and measuring control using television means in the period preceding operation and during the period of scheduled preventive maintenance.

Объектами контроля БЗТ являются:The objects of BZT control are:

- основной металл шпоночных поверхностей, контактных поверхностей опорного бурта, в том числе выполняется измерение износа шпонок;- the base metal of the key surfaces, contact surfaces of the support shoulder, including the measurement of the wear of the keys;

- сварное соединение обечаек опорной части между собой;- welded connection of the shells of the supporting part to each other;

- сварное соединение приварки обечайки опорной к плите средней;- welded connection of welding of the support shell to the middle plate;

- сварные соединения приварки шпонок к обечайке;- welded joints for welding dowels to the shell;

- поверхности решетки нижней, сопрягаемые с головками ТВС;- surfaces of the lower grille, mating with the heads of the fuel assemblies;

- сварное соединение приварки конической обечайки к обечайке цилиндрической;- welded connection of welding of a conical shell to a cylindrical shell;

- сварное соединение приварки конической обечайки к обечайке решетки;- welded connection of welding of the conical shell to the grille shell;

- сварное соединение приварки плиты нижней к обечайке;- welded connection of welding of the bottom plate to the shell;

- сварное соединение приварки плиты средней к верхней обечайке полукорпуса;- welded connection of welding of the plate of the middle to the upper shell of the semi-hull;

- поверхности шпоночных пазов, контактирующих со шпонками средней обечайки ШВК, в том числе выполняется измерение износа шпоночных пазов.- surfaces of the keyways in contact with the keys of the middle shell of the SHVK, including measuring the wear of the keyways.

Контроль основного металла и сварных соединений БЗТ необходимо проводить с целью получения данных о состоянии металла контролируемых участков при вводе реакторной установки в эксплуатацию и при периодическом контроле в процессе эксплуатации АЭС.БЗТ обеспечивает размещение и защиту от динамического потока теплоносителя органов регулирования и сборок внутриреакторных детекторов.The control of the base metal and welded joints of the BZT should be carried out in order to obtain data on the state of the metal of the controlled areas during the commissioning of the reactor plant and during periodic monitoring during the operation of the NPP. The BZT provides placement and protection from the dynamic flow of the coolant of the control elements and assemblies of in-reactor detectors.

Известно устройство комплексного обследования элементов системы управления и защиты ядерного реактора по патенту RU2282261, содержащее телевизионную камеру, осветитель, средство перемещения телевизионной камеры, системный блок персонального компьютера, видеомонитор, отличающееся тем, что устройство снабжено дополнительными телевизионными камерами и осветителями, механическими узлами поворота телевизионных камер и осветителей в вертикальной и горизонтальной плоскостях, однокоординатными поворотными устройствами, системой управления фокусом и масштабом объективов телевизионной камеры, системой управления световым потоком осветителей, П-образной приборной рамой. Способ обследования заключается в наведении с помощью поворотных устройств телевизионных камер и осветителей на исследуемый участок стержня и снятие показаний, стержень также имеет возможность свободного вертикального перемещения в воронке направляющей, что в результате дает возможность полного его обследования. Недостатками устройства и способа обследования стержней системы управления и защиты являются сложность сборки и подготовки к работе, необходимость остановки основных технологических операций на время проведения контроля, необходимость перемещения, установки и настройки устройства контроля для каждого контролируемого элемента системы управления и защиты ядерного реактора, что делает данное обследование не эффективным по временным затратам.A device is known for a comprehensive examination of the elements of the control and protection system of a nuclear reactor according to patent RU2282261, containing a television camera, an illuminator, a means of moving a television camera, a system unit of a personal computer, a video monitor, characterized in that the device is equipped with additional television cameras and illuminators, mechanical units for turning television cameras and illuminators in the vertical and horizontal planes, one-coordinate rotary devices, a system for controlling the focus and scale of the lenses of a television camera, a system for controlling the luminous flux of illuminators, and a U-shaped instrument frame. The examination method consists in pointing television cameras and illuminators at the studied section of the rod with the help of rotary devices and taking readings, the rod also has the possibility of free vertical movement in the guide funnel, which as a result makes it possible to fully examine it. The disadvantages of the device and method for examining the rods of the control and protection system are the complexity of assembly and preparation for work, the need to stop the main technological operations for the duration of the control, the need to move, install and configure the control device for each controlled element of the control and protection system of a nuclear reactor, which makes this survey is not time efficient.

Наиболее близкой к заявляемой группе изобретений по решаемой задаче является Устройство контроля внутрикорпусных устройств реактора снаружи по патенту RU157811, содержащее вертикально ориентированную опорную раму и тележку, а также поворотно-наклонную телевизионную камеру, отличающееся тем, что введена поворотная консоль, закрепленная в верхней части тележки, выполненной с возможностью перемещения по вертикальным направляющим опорной рамы, причем поворотно-наклонная телевизионная камера закреплена на конце поворотной консоли. Способ контроля заключается в установке опорной рамы с помощью лебедки над шахтой ревизии реактора, перемещению тележки с поворотно-наклонной телевизионной камерой по направляющим шахты ревизии по заранее определенному пути, что обеспечивает проведения контроля блока защитных труб. Недостатками устройства и способа контроля являются сложность сборки и подготовки к работе, большие размеры, необходимость остановки основных технологических операций на время проведения контроля, необходимость использования полярного крана для проведения контроля, что делает данный контроль не эффективным по временным затратам. Также требуются большие временные и трудовые затраты на демонтаж и дезактивацию оборудования после проведения контроля.The closest to the claimed group of inventions in terms of the problem to be solved is the device for monitoring the internal devices of the reactor from the outside according to patent RU157811, containing a vertically oriented support frame and a trolley, as well as a pan-tilt television camera, characterized in that a rotary console is introduced, fixed in the upper part of the trolley, made with the possibility of movement along the vertical guides of the support frame, and the pan-tilt television camera is fixed at the end of the rotary console. The control method consists in installing a support frame with a winch over the reactor inspection shaft, moving a trolley with a tilt-and-turn television camera along the inspection shaft guides along a predetermined path, which ensures the control of the protective tube block. The disadvantages of the device and method of control are the complexity of assembly and preparation for work, large size, the need to stop the main technological operations for the period of control, the need to use a polar crane for control, which makes this control inefficient in terms of time. Also, large time and labor costs are required for the dismantling and decontamination of equipment after the inspection.

Предлагаемая группа изобретений решает техническую проблему по устранению указанных недостатков, а именно осуществляет комплексное обследование технического состояния элементов системы управления и защиты ядерного реактора в виде блока защитных труб снаружи без остановки основных технологических операций на время проведения контроля, что упрощает и ускоряет процесс контроля.The proposed group of inventions solves the technical problem of eliminating these shortcomings, namely, it carries out a comprehensive examination of the technical condition of the elements of the control and protection system of a nuclear reactor in the form of a block of protective pipes from the outside without stopping the main technological operations for the duration of the control, which simplifies and speeds up the control process.

Технический результат группы изобретений заключается в сокращении сроков процедуры контроля за счет проведения его одновременно с перемещением блока защитных труб (БЗТ) из корпуса реактора в шахту ревизии, а также в упрощении процессов сборки, установки и демонтажа оборудования для проведения контроля, доступности всех объектов при дезактивации, в эксплуатационной надежности оборудования.The technical result of the group of inventions is to reduce the time of the control procedure by carrying it out simultaneously with the movement of the block of protective tubes (BZT) from the reactor vessel to the revision shaft, as well as to simplify the assembly, installation and dismantling of equipment for monitoring, the availability of all objects during decontamination , in the operational reliability of the equipment.

Технический результат реализуется за счет следующих приемов и конструктивных особенностей группы изобретений.The technical result is realized due to the following methods and design features of the group of inventions.

Способ комплексного обследования блока защиты труб ядерного реактора, включающий:A method for a comprehensive inspection of a nuclear reactor pipe protection unit, including:

- установку на верх шахты ревизии проставки шахты ревизии БЗТ, содержащей не менее двух цапф;- installation on the top of the shaft of the revision of the spacer of the shaft of the BZT revision, containing at least two trunnions;

- установку на проставку шахты ревизии БЗТ сверху кольца для контроля внешней цилиндрической поверхности БЗТ;- installation of a ring on top of the BZT inspection shaft spacer to control the external cylindrical surface of the BZT;

- закрепление не менее двух опор верхними торцами на кольце;- fixing at least two supports with the upper ends on the ring;

- закрепление не менее двух опор нижними торцами на цапфах проставки;- fastening of at least two supports by the lower ends on the trunnions of the spacer;

- установку планки для контроля днища БЗТ по пути его перемещения в шахту ревизии;- installation of a bar to control the BZT bottom along the way of its movement to the revision shaft;

- извлечение БЗТ из корпуса реактора;- extraction of BZT from the reactor vessel;

- перемещение БЗТ в шахту ревизии;- moving BZT to the revision shaft;

- снятие показаний с нижней поверхности БЗТ с помощью планки во время перемещения БЗТ из корпуса реактора к шахте ревизии;- taking readings from the lower surface of the BZT using a bar during the movement of the BZT from the reactor vessel to the inspection shaft;

- снятие показаний с боковой поверхности БЗТ с помощью кольца во время установки БЗТ в шахту ревизии.- taking readings from the side surface of the BZT using the ring during the installation of the BZT into the revision shaft.

Кольцо для контроля внешней цилиндрической поверхности БЗТ содержит:The ring for control of the outer cylindrical surface of the BZT contains:

- металлическую раму в виде кольца с не менее, чем двумя отсеками, при этом каждый отсек содержит камерный модуль;- a metal frame in the form of a ring with at least two compartments, each compartment containing a camera module;

- не менее двух опор, закрепленных верхними торцами на кольце;- at least two supports fixed with their upper ends on the ring;

- не менее двух камерных модулей, при этом модуль содержит металлический короб с одной стенкой из прозрачного защитного стекла, внутри которого размещены телекамера и система осветителей, и на одной из стенок короба размещен герметичный разъем для подключения кабеля, посредством которого камерный модуль подключается к аппаратуре управления через коммутатор.- at least two camera modules, while the module contains a metal box with one wall made of transparent protective glass, inside which a television camera and a lighting system are located, and on one of the walls of the box there is a sealed connector for connecting a cable through which the camera module is connected to the control equipment through the switch.

Планка для контроля днища БЗТ содержит:The BZT bottom control bar contains:

- металлическую раму в виде планки с не менее, чем двумя отсеками, при этом каждый отсек содержит камерный модуль;- a metal frame in the form of a bar with at least two compartments, each compartment containing a camera module;

- не менее двух камерных модулей, при этом модуль содержит металлический короб с одной стенкой в виде прозрачного защитного стекла, внутри которого размещены телекамера и система осветителей, и на одной из стенок короба размещен герметичный разъем для подключения кабеля, посредством которого камерный модуль подключается к аппаратуре управления через коммутатор.- at least two camera modules, while the module contains a metal box with one wall in the form of a transparent protective glass, inside which a television camera and a system of illuminators are located, and on one of the walls of the box there is a sealed connector for connecting a cable through which the camera module is connected to the equipment control via a switch.

Группа изобретений поясняется чертежами.The group of inventions is illustrated by drawings.

На Фиг. 1 представлено схематичное изображение комплексного обследования блока защиты труб (БЗТ) снаружи, где:On FIG. 1 shows a schematic representation of a comprehensive inspection of the pipe protection unit (PCU) from the outside, where:

1 - блок защитных труб (БЗТ);1 - block of protective pipes (BZT);

2 - боковая поверхность БЗТ;2 - side surface of BZT;

3 - нижняя поверхность БЗТ;3 - lower surface of the BZT;

4 - корпус реактора;4 - reactor vessel;

5 - шахта ревизии БЗТ;5 - BZT revision shaft;

6 - проставка шахты ревизии;6 - spacer of the revision shaft;

7 - цапфа проставки;7 - spacer trunnion;

8 - планка контроля;8 - control bar;

9 - кольцо контроля.9 - control ring.

Стрелкой показано направление перемещения БЗТ.The arrow shows the direction of movement of the BZT.

На Фиг. 2 представлено опускание БЗТ в шахту ревизии через кольцо. Стрелкой показано направление перемещения БЗТ.On FIG. 2 shows the lowering of the BZT into the revision shaft through the ring. The arrow shows the direction of movement of the BZT.

На Фиг. 3 представлен вид кольца контроля, где:On FIG. 3 shows a view of the control ring, where:

10 - кольцеобразная металлическая рама;10 - ring-shaped metal frame;

11 - отсек;11 - compartment;

12 - камерный модуль;12 - chamber module;

13 - опора;13 - support;

14 - верхний торец опоры;14 - the upper end of the support;

15 - нижний торец опоры;15 - lower end of the support;

16 - коммутатор.16 - switch.

На Фиг. 4 представлен вид планки контроля, где:On FIG. 4 shows a view of the control bar, where:

17 - прямоугольная металлическая рама;17 - rectangular metal frame;

18 - отсек;18 - compartment;

12 - камерный модуль.12 - chamber module.

На Фиг. 5 вид камерного модуля с телекамерой и осветителями:On FIG. 5 view of the camera module with a TV camera and illuminators:

19 - металлический короб;19 - metal box;

20 - прозрачная стенка;20 - transparent wall;

21 - герметичный разъем;21 - sealed connector;

22 - телекамера;22 - TV camera;

23 - осветитель.23 - illuminator.

На Фиг. 5 слева показана передняя стенка камерного модуля, справа -камерный модуль в разрезе и его задняя стенка.On FIG. 5 on the left shows the front wall of the chamber module, on the right - the chamber module in section and its rear wall.

Подготовка к обследованию БЗТ (1) заключается в установке на верхний край проставки шахты ревизии (6), которая в штатном положении установлена над шахтой ревизии БЗТ (5), кольца (9) в виде кольцеобразной металлической рамы (10) с отсеками (11) для камерных модулей (12). Следует сказать, что проставка шахты ревизии (6) устанавливается над шахтой ревизии БЗТ (5) единожды и далее не убирается, а служит для крепления на ней БЗТ (1) при проведении работ с реактором. Камерные модули (12) представляют собой герметичные металлические короба (19), на одной стенке которых имеется прозрачное защитное стекло (20), на другой - герметичный разъем (21) для подключения кабеля, а внутри находится телекамера (22) и осветители (23) в виде светодиодной ленты. Рама (10) состоит из сегментов и быстро собирается сотрудниками вручную в кольцо на верхнем краю проставки шахты (6), крепится к ней и в отсеки (11) теми же сотрудниками устанавливаются камерные модули (12). При этом рама (10) крепится к проставке шахты (6) с помощью опор (13), нижний торец (15) которых устанавливается на цапфы проставки (7), которые расположены на наружной боковой поверхности проставки шахты (6). Опоры (13) представляют собой металлические трубки, верхний торец (14) которых закреплен на кольце (9), а нижний (15) устанавливается на цапфы (7) проставки шахты ревизии (6). Количество опор (13) и цапф (17) должно быть не меньше двух, т.к. иначе они не будут выполнять свою функцию крепления кольца (9) к проставке шахты (6), а также они должны быть расположены напротив друг друга. После установки кольцо (9) остается на проставке (6) шахты ревизии БЗТ (5) на весь срок эксплуатации АЭС. Планка (8) в виде прямоугольной металлической рамы (17) с отсеками (18) для камерных модулей (12) собирается сотрудниками вручную из сегментов и устанавливается до шахты ревизии БЗТ (5), например, на плиту устройства транспортировки шахты внутрикорпусной (УТШ), и таким образом, чтобы края планки (8) были направлены на стены каньона. В отсеки (18) прямоугольной рамы (17) устанавливаются вручную сотрудниками камерные модули (12). Камерные модули (12), установленные в отсеки (11) и (18) соответствующих рам (10) и (17), подключаются к аппаратуре управления через коммутаторы (16), которые служат для уменьшения количества кабелей, идущих к аппаратуре управления. Камерных модулей (12) должно быть установлено не менее двух, чтобы произвести съемку всех поверхностей БЗТ (1). Соответственно и количество отсеков (11) и (18) для камерных модулей (12) должно быть не меньше двух. Таким образом, процесс сборки и подготовки оборудования к обследованию упрощен по сравнению с аналогами. Само оборудование в виде кольца и планки надежно в применении, так как в их конструкции отсутствуют подвижные элементы.Preparation for inspection of the BZT (1) consists in installing rings (9) in the form of an annular metal frame (10) with compartments (11) for chamber modules (12). It should be noted that the revision shaft spacer (6) is installed above the BZT inspection shaft (5) once and then is not removed, but serves to fasten the BZT (1) on it during work with the reactor. Camera modules (12) are hermetic metal boxes (19), on one wall of which there is a transparent protective glass (20), on the other - a sealed connector (21) for connecting a cable, and inside there is a TV camera (22) and illuminators (23) in the form of an LED strip. The frame (10) consists of segments and is quickly assembled manually by employees into a ring on the upper edge of the shaft spacer (6), attached to it, and chamber modules (12) are installed in the compartments (11) by the same employees. In this case, the frame (10) is attached to the shaft spacer (6) using supports (13), the lower end (15) of which is mounted on the spacer pins (7), which are located on the outer side surface of the shaft spacer (6). The supports (13) are metal tubes, the upper end (14) of which is fixed on the ring (9), and the lower end (15) is mounted on the trunnions (7) of the spacer of the inspection shaft (6). The number of supports (13) and trunnions (17) must be at least two, because otherwise they will not fulfill their function of fastening the ring (9) to the spacer of the shaft (6), and they must also be located opposite each other. After installation, the ring (9) remains on the spacer (6) of the BZT inspection shaft (5) for the entire life of the NPP. The bar (8) in the form of a rectangular metal frame (17) with compartments (18) for chamber modules (12) is manually assembled by employees from segments and installed up to the revision shaft of the BZT (5), for example, on the plate of the internal shaft transportation device (UTSH), and in such a way that the edges of the plank (8) are directed to the walls of the canyon. In the compartments (18) of the rectangular frame (17), camera modules (12) are manually installed by employees. Camera modules (12) installed in compartments (11) and (18) of the respective frames (10) and (17) are connected to the control equipment through switches (16), which serve to reduce the number of cables going to the control equipment. At least two camera modules (12) must be installed in order to survey all surfaces of the BZT (1). Accordingly, the number of compartments (11) and (18) for chamber modules (12) must be at least two. Thus, the process of assembling and preparing equipment for examination is simplified in comparison with analogues. The equipment itself in the form of a ring and a bar is reliable in use, since there are no moving elements in their design.

Способ комплексного обследования БЗТ (1) осуществляется следующим образом. БЗТ извлекается из корпуса реактора (4) и перемещается в шахту ревизии БЗТ (5). Во время перемещения БЗТ над планкой (8) с камерными модулями (12) производится съемка нижней поверхности (3) БЗТ. При опускании БЗТ в шахту ревизии (5) он проходит внутри кольца (9) с камерными модулями (12), и производится съемка боковой поверхности (2) БЗТ. Отсеки (11) и (18) для камерных модулей (12) соответственно в планке (8) и кольце (9) расположены таким образом, чтобы обеспечить съемку всех поверхностей БЗТ. При этом операции перемещения БЗТ из корпуса реактора (4) в шахту ревизии БЗТ (5) производятся в любом случае, независимо от необходимости выполнять контроль. Таким образом, комплексное обследование БЗТ не занимает дополнительного времени и не требует выполнения отдельных операций специально для контроля. Результаты съемки хранятся в виде цифровых изображений в энергонезависимой памяти аппаратуры управления. При завершении съемки выполняется анализ полученных изображений, и выдается заключение о результатах контроля.The method of complex examination of BZT (1) is carried out as follows. BZT is removed from the reactor vessel (4) and moved to the BZT revision shaft (5). During the movement of the BZT above the bar (8) with the camera modules (12), the bottom surface (3) of the BZT is surveyed. When lowering the BZT into the revision shaft (5), it passes inside the ring (9) with chamber modules (12), and the side surface (2) of the BZT is surveyed. Compartments (11) and (18) for camera modules (12), respectively, in the bar (8) and ring (9) are located in such a way as to ensure the survey of all BZT surfaces. In this case, the operations of moving the BZT from the reactor vessel (4) to the revision shaft of the BZT (5) are carried out in any case, regardless of the need to perform control. Thus, a comprehensive examination of BCT does not take additional time and does not require the performance of separate operations specifically for control. The survey results are stored as digital images in the non-volatile memory of the control equipment. At the end of the shooting, the analysis of the received images is performed, and a conclusion is issued on the results of the control.

После проведения обследования производят демонтаж и дезактивацию оборудования. Сначала камерные модули (12) отключаются от аппаратуры управления, затем они извлекаются из кольца (9) и планки (8), планка снимается с плиты УТШ и разбирается вручную. Кольцо (9) находится на проставке (6) шахты ревизии БЗТ (5) весь период эксплуатации энергоблока и в демонтаже, дезактивации не нуждается. Далее проводится дезактивация камерных модулей (12) и сегментов планки (8). Для дезактивации используется штатное оборудование центрального зала АЭС - ультразвуковая ванна. В нее поочередно помещают камерные модули и сегменты планки на определенное время. Демонтаж оборудования прост в исполнении, производится вручную двумя или тремя сотрудниками, не требует использования полярного крана. Дезактивация оборудования при доступности ко всем деталям не занимает много времени.After the inspection, the equipment is dismantled and decontaminated. First, the chamber modules (12) are disconnected from the control equipment, then they are removed from the ring (9) and the bar (8), the bar is removed from the UTSh plate and disassembled manually. The ring (9) is located on the spacer (6) of the BZT inspection shaft (5) for the entire period of operation of the power unit and does not require dismantling, decontamination. Next, the chamber modules (12) and bar segments (8) are decontaminated. For decontamination, standard equipment of the NPP central hall is used - an ultrasonic bath. Chamber modules and bar segments are alternately placed in it for a certain time. The dismantling of the equipment is easy to perform, carried out manually by two or three employees, and does not require the use of a polar crane. Decontamination of equipment with access to all parts does not take much time.

В результате процедура комплексного обследования БЗТ не занимает дополнительного времени, а подготовка к процедуре обследования по установке оборудования и при завершении обследования при его демонтаже занимают значительно меньше времени, чем в аналогах. Применяемое оборудование для проведения контроля в виде кольца и планки надежно в применении, так как в их конструкции отсутствуют подвижные элементы, что повышает их эксплуатационные характеристики.As a result, the procedure for a comprehensive examination of the BZT does not take additional time, and preparation for the examination procedure for the installation of equipment and upon completion of the examination during its dismantling takes much less time than in analogues. The equipment used for testing in the form of a ring and a bar is reliable in use, since there are no moving elements in their design, which increases their performance.

Таким образом, достигается технический результат - сокращение сроков процедуры контроля, упрощение процесса сборки, установки и демонтажа оборудования, доступность всех объектов оборудования при дезактивации, эксплуатационная надежность оборудования.Thus, the technical result is achieved - reducing the time of the control procedure, simplifying the process of assembly, installation and dismantling of equipment, the availability of all equipment objects during decontamination, and the operational reliability of the equipment.

Пример реализации способа контроляAn example of the implementation of the control method

Сборка и испытания устройства для комплексного обследования БЗТ проводились на полномасштабном стенде-имитаторе каньона реактора типа ВВЭР. На верхний край проставки шахты ревизии БЗТ установили смонтированное кольцо из восьми сегментов с восьмью опорами и отсеками для камерных модулей так, что нижние торцы опор встали на восемь цапф проставки. В отсеки для камерных модулей кольца силами двух человек установили 84 камерных модуля, и подключили их к аппаратуре управления через коммутаторы. В это время на плиту УТШ установили планку в виде металлической рамы из трех сегментов с отсеками для камерных модулей таким образом, чтобы края планки были направлены на стены каньона. В отсеки для камерных модулей планки силами этих же двух человек установили 26 камерных модулей, и подключили их к аппаратуре управления через коммутаторы. Стенд-имитатор каньона заполнили водой. Имитатор БЗТ извлекли из имитатора корпуса реактора, пронесли над планкой с камерными модулями и опустили через кольцо с камерными модулями в имитатор шахты ревизии БЗТ. Во время перемещения БЗТ над планкой с камерными модулями была выполнена съемка нижней поверхности БЗТ, а при опускании БЗТ в шахту ревизии внутри кольца с камерными модулями - съемка боковых поверхностей БЗТ. Результаты съемки были сохранены в виде цифровых изображений в энергонезависимой памяти аппаратуры управления. После завершения съемки был выполнен анализ полученных изображений, и выдано заключение о результатах контроля. Таким образом, было проведено комплексное обследование БЗТ одновременно с его перемещением из корпуса реактора в шахту ревизии без дополнительных затрат времени на выполнение обследования, что уменьшило время контроля, а следовательно и время простоя энергоблока, на 14 часов.The assembly and testing of the device for a comprehensive examination of the BZT was carried out on a full-scale simulator of the canyon of a VVER type reactor. A mounted ring of eight segments with eight supports and compartments for chamber modules was installed on the upper edge of the spacer of the BZT revision shaft so that the lower ends of the supports rested on the eight pins of the spacer. Two people installed 84 camera modules into the compartments for the camera modules of the ring, and connected them to the control equipment through switches. At this time, a bar in the form of a metal frame of three segments with compartments for chamber modules was installed on the UTSh slab in such a way that the edges of the bar were directed towards the walls of the canyon. The same two people installed 26 camera modules into the compartments for camera modules of the strip, and connected them to the control equipment through switches. The canyon simulator was filled with water. The BZT simulator was removed from the reactor vessel simulator, carried over the bar with chamber modules, and lowered through the ring with chamber modules into the BZT inspection shaft simulator. During the movement of the BZT above the bar with camera modules, the lower surface of the BZT was surveyed, and when the BZT was lowered into the revision shaft inside the ring with the camera modules, the side surfaces of the BZT were surveyed. The survey results were stored as digital images in the non-volatile memory of the control equipment. After the shooting was completed, the analysis of the received images was performed, and a conclusion was issued on the results of the control. Thus, a comprehensive survey of the BZT was carried out simultaneously with its movement from the reactor vessel to the inspection shaft without additional time spent on the survey, which reduced the control time, and hence the downtime of the power unit, by 14 hours.

После проведения обследования каньон осушается и начинается процедура демонтажа и дезактивации оборудования. Сначала камерные модули отключаются от аппаратуры управления, затем они извлекаются из кольца и планки, планка снимается с плиты УТШ и разбирается вручную в течение 10 минут. Кольцо находится на проставке шахты ревизии весь период эксплуатации энергоблока и в демонтаже и дезактивации не нуждается. Далее проводится дезактивация камерных модулей и сегментов планки.After the survey, the canyon is drained and the procedure for dismantling and decontaminating the equipment begins. First, the chamber modules are disconnected from the control equipment, then they are removed from the ring and the bar, the bar is removed from the UTSh plate and disassembled manually for 10 minutes. The ring is located on the spacer of the revision shaft for the entire period of operation of the power unit and does not need to be dismantled and decontaminated. Next, the chamber modules and bar segments are decontaminated.

Для дезактивации использовалась ультразвуковая ванна - это штатное оборудование центральных залов АЭС. В нее поочередно помещали камерные модули и сегменты планки на 10 минут каждый. Одновременно в ультразвуковой ванне находилось 20 камерных модулей или один сегмент планки. Аппаратуру управления обработали спиртом в течение 20 минут. Дезактивацию всего оборудования произвели три человека в течение 1 часа 30 минут.For decontamination, an ultrasonic bath was used - this is the standard equipment of the central halls of the nuclear power plant. Chamber modules and bar segments were alternately placed in it for 10 minutes each. At the same time, 20 chamber modules or one bar segment were in the ultrasonic bath. The control equipment was treated with alcohol for 20 minutes. The decontamination of all equipment was carried out by three people within 1 hour and 30 minutes.

Claims (3)

1. Способ комплексного обследования блока защитных труб ядерного реактора типа ВВЭР снаружи, заключающийся в извлечении блока защитных труб из корпуса реактора, в его установке в шахту ревизии блока защитных труб, в снятии показаний с помощью не менее двух телекамер и осветителей, отличающийся тем, что на верх шахты ревизии устанавливают проставку шахты ревизии, которая содержит не менее двух цапф, на верх проставки шахты ревизии блока защитных труб устанавливают кольцо с не менее чем двумя отсеками, при помощи не менее двух опор, которые закреплены верхними торцами на кольце, а нижние торцы устанавливают на цапфы, в отсеке размещают телекамеру и осветитель, между шахтой ревизии защитных труб и корпусом реактора устанавливают планку с не менее чем двумя отсеками, в отсеке размещают телекамеру и осветитель, снимают показания с нижней поверхности блока защитных труб с помощью планки во время перемещения блока из корпуса реактора к шахте ревизии, затем снимают показания с боковой поверхности блока защитных труб с помощью кольца во время установки блока в шахту ревизии.1. A method for a comprehensive examination of the block of protective tubes of a nuclear reactor of the VVER type from the outside, which consists in removing the block of protective tubes from the reactor vessel, installing it in the revision shaft of the block of protective tubes, taking readings using at least two cameras and illuminators, characterized in that a spacer of the inspection shaft is installed on the top of the inspection shaft, which contains at least two trunnions; mounted on trunnions, a camera and an illuminator are placed in the compartment, a bar with at least two compartments is installed between the inspection shaft of protective tubes and the reactor vessel, a camera and an illuminator are placed in the compartment, readings are taken from the lower surface of the block of protective tubes using a bar during the movement of the block from the reactor vessel to the revision shaft, then take readings from the side surface awns of the block of protective pipes with the help of a ring during the installation of the block in the revision shaft. 2. Планка для осуществления cпособа по п. 1, включающего размещение телекамеры и осветителя, отличающаяся тем, что выполнена в виде прямоугольной рамы с не менее чем двумя отсеками, отсек содержит камерный модуль, который выполнен в виде металлического короба с одной стенкой из прозрачного защитного стекла, на другой стенке короба размещен герметичный разъем, а внутри короба размещены телекамера и осветитель.2. A bar for implementing the method according to claim 1, including the placement of a television camera and an illuminator, characterized in that it is made in the form of a rectangular frame with at least two compartments, the compartment contains a camera module, which is made in the form of a metal box with one wall of a transparent protective glass, a sealed connector is placed on the other wall of the box, and a television camera and an illuminator are placed inside the box. 3. Кольцо для осуществления способа по п. 1, включающего размещение телекамеры и осветителя, отличающееся тем, что выполнено в виде кольцеобразной рамы с не менее чем двумя отсеками, к раме прикреплены не менее двух опор своими верхними торцами, в отсеке размещен камерный модуль, при этом модуль содержит металлический короб с одной стенкой из прозрачного защитного стекла, на другой стенке короба размещен герметичный разъем, а внутри короба размещены телекамера и осветитель.3. A ring for implementing the method according to claim 1, including the placement of a television camera and an illuminator, characterized in that it is made in the form of an annular frame with at least two compartments, at least two supports are attached to the frame with their upper ends, a camera module is placed in the compartment, while the module contains a metal box with one wall of transparent protective glass, a sealed connector is placed on the other wall of the box, and a television camera and an illuminator are placed inside the box.
RU2022114335A 2022-05-27 Method for a comprehensive examination of a block of protective tubes of a nuclear reactor and a device for its implementation RU2786203C1 (en)

Publications (1)

Publication Number Publication Date
RU2786203C1 true RU2786203C1 (en) 2022-12-19

Family

ID=

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4330367A (en) * 1973-05-22 1982-05-18 Combustion Engineering, Inc. System and process for the control of a nuclear power system
US5912933A (en) * 1997-12-04 1999-06-15 General Electric Company Method and system for direct evaluation of operating limit minimum critical power ratios for boiling water reactors
EP1113455A1 (en) * 1999-12-30 2001-07-04 General Electric Company Method and system for generating thermal-mechanical limits for the operation of nuclear fuel rods
EP1221701A1 (en) * 2000-12-29 2002-07-10 Global Nuclear Fuel-Americas, LLC Determination of operating limit minimum critical power ratio
RU157811U1 (en) * 2015-08-25 2015-12-10 Общество с ограниченной ответственностью "Технический центр контроля и диагностики - Атомкомплект" OUTDOOR REACTOR DEVICE CONTROL DEVICE
KR101604546B1 (en) * 2014-09-23 2016-03-17 한전케이피에스 주식회사 Rod cluster control change tool load test device
KR101687346B1 (en) * 2015-06-30 2016-12-19 한국원자력연구원 The detector for leakage of heavy water
EP1556870B1 (en) * 2002-10-21 2017-11-29 Areva Np Method for determining a threshold value of a nuclear reactor operating parameter, corresponding system, computer programme and support

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4330367A (en) * 1973-05-22 1982-05-18 Combustion Engineering, Inc. System and process for the control of a nuclear power system
US5912933A (en) * 1997-12-04 1999-06-15 General Electric Company Method and system for direct evaluation of operating limit minimum critical power ratios for boiling water reactors
EP1113455A1 (en) * 1999-12-30 2001-07-04 General Electric Company Method and system for generating thermal-mechanical limits for the operation of nuclear fuel rods
EP1221701A1 (en) * 2000-12-29 2002-07-10 Global Nuclear Fuel-Americas, LLC Determination of operating limit minimum critical power ratio
EP1556870B1 (en) * 2002-10-21 2017-11-29 Areva Np Method for determining a threshold value of a nuclear reactor operating parameter, corresponding system, computer programme and support
KR101604546B1 (en) * 2014-09-23 2016-03-17 한전케이피에스 주식회사 Rod cluster control change tool load test device
KR101687346B1 (en) * 2015-06-30 2016-12-19 한국원자력연구원 The detector for leakage of heavy water
RU157811U1 (en) * 2015-08-25 2015-12-10 Общество с ограниченной ответственностью "Технический центр контроля и диагностики - Атомкомплект" OUTDOOR REACTOR DEVICE CONTROL DEVICE

Similar Documents

Publication Publication Date Title
JP3121077B2 (en) Core instrumentation equipment for pressurized water reactor
US11217352B2 (en) Method for housing nuclear reactor modules
RU94045861A (en) Device inspecting bedplates (variants) method of inspection of tubular panels and gear to clean bedplates
RU2786203C1 (en) Method for a comprehensive examination of a block of protective tubes of a nuclear reactor and a device for its implementation
US5408508A (en) System and method for simultaneously testing a plurality of control rods
US9748005B2 (en) Apparatus and method to inspect nuclear reactor components in the core annulus, core spray and feedwater sparger regions in a nuclear reactor
RU2785999C1 (en) Method for a comprehensive survey of the mine of an in-vessel nuclear reactor and a device for its implementation.
KR100982393B1 (en) A far apart remote control visual inspection system of steam generator
Delfin et al. Visual inspection system and sipping design for spent fuel at TRIGA MARK III reactor of Mexico
Tardiff Some Aspects of the WTR and SL-1 Accidents
Egger Nuclear reactor visual inspection system
Kelly WASTE SOLIDIFICATION PROGRAM. VOLUME III. DESIGN FEATURES OF THE FACILITIES AND EQUIPMENT FOR THE WSEP PRODUCT EVALUATION PROGRAM.
JP2022130098A (en) shielding container
JPH0782109B2 (en) Damaged fuel detector for fast reactor
Linderoth CONTAINMENT SYSTEMS EXPERIMENT. PART I. DESCRIPTION OF EXPERIMENTAL FACILITIES.
Cornell et al. Facilities and techniques for on-site and off-site inspection of irradiated fuel elements and components from Nuclear Electric's advanced gas-cooled reactors
Gibbs The influence of inspection requirements on reactor design
Takeda et al. Task A Evaluation of performance and application of surveillance devices in the spent fuel receiving areas
Boeck et al. Visual examination program of the TRIGA Mark II reactor Vienna with the nuclear underwater telescope
JPH0758343B2 (en) Reactor internal structure replacement method
Böck et al. Operation experience with the TRIGA reactor Vienna
Boeck et al. Inspection of the TRIGA mark-2 reactor tank Vienna in July 1988
Böck et al. Optical inspection and maintenance of the TRIGA Mark-II reactor in Pavia/Italy
James Use of remote visual in-service inspection on nuclear power plants of the CEGB
JPH0143280B2 (en)